Technopark Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
Civil Works For The Construction Of Working Womens Hostel In Technopark Kollam Campus
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ETPK_691055_2Bid Award Id
ViewTender No
ETPK/KLM/154/2024-25Tender Authority
Technopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
206
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
30.18
-
-
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
70.45
-
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
4975.08
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
216.92
-
-
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. All work above plinth level upto floor V level .The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
45.15
-
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
4174.36
-
-
... More
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
0.32
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases for columns. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
23.84
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams,Plinth beam, girders bressumers and cantilevers. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
232.72
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
98.17
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Suspended floors, roofs, landings, beams & Cantiliver beam and its side etc complete. balconies and access platform Upto height of 6 meters. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
228
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Stairs, (excluding landings ) except spiral - staircases).The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
21.53
-
-
... More
Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
63.43
-
-
... More
Hollow block masonry using pre cast solid blocks (factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for Super structure up to floor two level for 10 cm thick wall in: CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10.07
-
-
... More
Plastering with cement mortar 1:6(1 cement & 6 sand) 12mm thick one coat floated hard and trowelled smooth for inside and outside walls including cost and conveyance of all materials to site, labour charges, hire charges for scaffolding, watering for curing, etc. complete for all floors for all heights as per the direction of engineer in charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
1111.94
-
-
... More
Plastering with cement mortar 1:4(1 cement & 4 sand) 12mm thick one coat floated hard and trowelled smooth for under side of slab, Cantiliver slab, beam, cantiliver beam etc. including cost and conveyance of all materials to site, labour charges, hire charges for scaffolding, watering for curing, etc. complete for all floors for all heights as per the direction of engineer in charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
179.97
-
-
... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete including scaffolding for all heights. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
177
-
-
... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
1275.65
-
-
... More
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour. Two coats.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
961.45
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
291.7
-
-
... More
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600 x 600 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
253.54
-
-
... More
Providing and laying vitrified tiles in different sizes (thickness to be specified by the manufacturer) for walls with water absorption less than 0.08% and conforming to IS : 15622, in all colours,shades except burgundy, bottle green, black of any size as approved by Engineerin-Charge,in skirting, risers of steps and dados, over 12 mm thick bed of cementmortar 1:3 (1 cement : 3 coarse sand) and including PVC corners for all projected corners and door sides and applying of epoxy joint filler, by using a spacer of minimum of 3mm thick etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
72.57
-
-
... More
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
27.27
-
-
... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom, bottom and top of shade and duct, etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
47
-
-
... More
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
218.5
-
-
... More
Laying the terrace floor for Leveling course/ Screed with cement concrete 1:3:6 (1 cement, 3 sand and 6 broken stones) with 6mm broken stones for an average thickness of 60mm after cleaning the surface with wire brush and washing the floor neatly with water, laying the concrete in thin layer and compacting to correct slopes and even levels and plastering the top surface with cement mortar 1:3, 9mm thick one coat floated hard and trowlled smooth to a neat smooth surface with slope for water runoff watering for curing etc. including cost and conveyance of all materials, labour charges etc complete for all floors as per the direction of engineer in charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights upto roof top, complete as per the direction of engineer in charge.
218.5
-
-
... More
Fabricating and erecting hand rails with polished stainless steel (SS 304) for lobby area, staircases for all shapes and size in all floors with vertical members and horizontal members as detailed in the drawing including extra charges for welding all the joints properly , with contour cut of the SS tubes, including fixing the vertical legs in masonry or concrete and fixing the rail to correct plumb and line etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
167.46
-
-
... More
Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape ( colour and tile pattern approved by Technopark ), laid in required colour and pattern over and including 50 mm thick compacted bed of 6mm chips, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
30.9
-
-
... More
Providing and fixing 100 mm brass locks ( best make of approved quality ) for aluminium doors including necessary cutting and making good etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
12
-
-
... More
Providing and fixing aluminium round shape handle of outer dia 100 mm with SS screws etc. complete as per direction of Engineer-in-Charge. Anodized/ powder coated (AC 15 ) aluminium.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
22
-
-
... More
Providing and fixing aluminium tower bolts, ISI marked, anodised(anodic coating not less than grade AC 10 as per : 1868), transparent or dyed to required colour or shade, with necessary screws complete: 250x10 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space etc complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
22
-
-
... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5.50 mm thickness. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
23.18
-
-
... More
Providing and fixing frosted type or other design film or Sun control film for various window / door glasses as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
23.18
-
-
... More
Providing and applying fiber-reinforced elastomeric liquid waterproofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of the concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming ofelastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and twocoats of undiluted elastomeric waterproofing liquid (dry film thickness of completeapplication/system not less than 500 microns). The operation shall be carried outafter scrapping and properly cleaning the surface to remove loose particles withwire brushes, complete in all respect as per the direction of Engineer-in-Charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10.54
-
-
... More
Providing and laying APP (Atactic Polypropylene Polymer) modifiedprefabricated five layer, 3 mm thick water proofing membrane, black finishedreinforced with glass fibre matt consisting of a coat of bitumen primer forbitumen membrane @ 0.40 litre/sqm by the same membrane manufactured ofdensity at 25 degreee, 0.87 - 0.89 kg/litre and viscocity 70 - 160 cps. Over the primercoat the layer of membrane shall be laid using butane torch and sealing alljoints etc., and preparing the surface complete. The vital physical and chemicalparameters of the membrane shall be as under : Joint strength in longitudinaldegree and transverse direction at 23degree as 350/300 N/5 cm. Tear strength in longitudinaland transverse direction as 60/80N. Softening point of membrane not less than150degree. Cold flexibility shall be upto -2 degree when tested in accordance with ASTM,D - 5147. The laying of membrane shall be got done through the authorisedapplicator of the manufacturer of membrane : 3 mm thick. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10.54
-
-
... More
Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of slab over 0.50 sqm.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
4.09
-
-
... More
Providing and fixing paneled and glazed shutters for doors, windows and clerestory windows, 35 mm thick shutters including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineerin - charge.using Anjili/ Jack wood
25.96
-
-
... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
2.83
-
-
... More
Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embeddings in cement concrete block 30x10x15 cm 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
135.96
-
-
... More
Varnishing with varnish of approved brand and manufacture :Two or more coats of glue sizing with copal varnish over an under coat of flatting varnish.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
73.14
-
-
... More
Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance 1 mm), with wall thickness 2.0mm ( 0.2 mm), corners of the door frame to be jointed with galvanized brackets and stainless steel screws, joints mitred and plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 x 19 mm and 1 mm ( 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer's specification and direction of Engineer-in-charge Extruded section profile size 42x50 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
25.75
-
-
... More
Providing and fixing to existing door frames 30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm ( 0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm ( 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x30 mm and 2 mm ( 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm ( 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-in-charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
8.65
-
-
... More
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
20
-
-
... More
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 6 Kgf/cm2. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
20
-
-
... More
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 32 mm pipe 6Kgf/cm2 .The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
20
-
-
... More
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 25 mm pipe 10kgf /cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
20
-
-
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
20
-
-
... More
Providing and fixing brass stop cock of approved quality : 20 mm nominal bore.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
3
-
-
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes including jointing with PVC solvent cement 110x110x110 mm dia Tee. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing PVC moulded fittings / accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia 45 degree Elbow.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75x75x75 mm dia Tee . The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing PVC moulded fittings / accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75 mm dia Door Elbow. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110x75 mm dia Reducer. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 150 mm dia floor trap. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
10
-
-
... More
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Flat back wash basin size 550x400mm with single 15 mm C.P.brasspillar taps. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
3
-
-
... More
Providing and fixing P.V.C. waste pipe for sink or wash basin including PVC.waste fittings complete. Flexible pipe 32 mm dia. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
3
-
-
... More
Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
3
-
-
... More
Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 15 mm nominal bore. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
5
-
-
... More
Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete as per the direction of site engineer-in-charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
3
-
-
... More
Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 8931 15 mm nominal bore.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
8
-
-
... More
Supplying and fixing in position plain plate glass mirror 6mm thick of appropriate sizes as per requirement and fixing with allied materials as per the direction of engineer in charge. for all floors. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
1.4
-
-
... More
PTMT Liquid Soap Container of 400 ml capacity. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
2
-
-
... More
PTMT Soap Dish/Holder 138x102x75 mm.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
5
-
-
... More
Supplying and fixing CP Towel rod 60cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
2
-
-
... More
Making the opening in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface i/c disposal of mulba / rubbish to the nearest municipal dumping ground.For door / window / clerestory window/cutout.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
6
-
-
... More
Shower: The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
2
-
-
... More
Door Stopper: The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
11
-
-
... More
Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS 13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required: Kitchen sink with drain board. 510x1040 mm bowl depth 250 mm.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
1
-
-
... More
Providing and fixing C.P brass bib cock of approved quality conforming to IS: 8931.15 mm nominal bore. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc for all floors and all heights, complete as per the direction of engineer in charge.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements