Technopark Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Technopark Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 2,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply, install, test, and commission a closed expansion tank with a membrane, having a capacity of 100 liters, rated for PN10, designed to handle system pressure regulation and thermal expansion in a closed-loop chilled water system. The tank shall be installed as per the project requirements and must not include required insulation or additional fittings to ensure there is no energy loss and system is working with optimal energy efficiancies. A safety valve, rated for PN10, shall be provided for pressure safety. The scope shall also include a gas charging pipe with three adaptors for efficient system pressurization. Additionally, a microbubble air and dirt separator with a diameter of 150mm, rated for PN16, complete with matching flanges, bolts, nuts, and gaskets, shall be installed to ensure efficient removal of air and dirt particles from the system. The separator shall exclude supervent, insulation, and additional valves or fittings. An auto air vent, with a diameter of 3/4" (20mm) and rated for PN16, shall also be installed for automatic air release from the system. The contractor shall install a pressurization unit complete with a double pump system (2 CMH, 25mWC), an IP55-rated control panel with a pressure transmitter and flow meter, and all necessary interconnecting piping, wiring, and a protective canopy for outdoor installation. The pressurization unit shall be rated for PN10 and designed to maintain system pressure reliably under varying operational conditions. All components must adhere to relevant standards for quality, durability, and performance and must be installed in accordance with the tender specifications and site requirements. Testing and commissioning shall ensure leak-free operation and compatibility with the overall system design. The contractor shall provide all necessary certifications and compliance documentation upon completion. Make: CIMM/ITT/Anergy

1

-

-

... More
Supply, Installation, Testing, and Commissioning (SITC) of eco-friendly, triple-layer PPR (Polypropylene Random Copolymer) pipes, certified as per IS 15801: 2008 and constructed from NSF-approved raw material, with a pressure rating of PN10. The scope of work shall be limited to the works at the terrace level, connecting the air-cooled chillers, pumps, expansion tanks, and other associated equipment/valves/meters etc as per the direction of engineer in charge. The work/cost shall include all necessary fittings and accessories, such as 90° and 45° elbows, couplers, equal tees, slip-on flanges, flange cores, metal inserts, bolts, and nuts, as well as fabricated fittings, where required, to meet the system design requirements. All pipes and fittings must be compatible with heat fusion or mechanical connections, as applicable, and shall include proper supports, hangers, and clamps to ensure durability, withstand vibrations associated with rated pressures, and prevent sagging. The system shall be pressure-tested to 1.5 times the working pressure to verify its integrity and ensure leak-free operation. The contractor shall complete all interconnections at the terrace level in compliance with the tender specifications, ensuring the system adheres to all relevant standards and maintains reliability and efficiency, as outlined in the tender document ETPK/PH-I/2024-25/AT-252. Make: KPT/Prince.

-

-

-

... More
130 MM Inner Dia

65

-

-

... More
90 MM Inner Dia

35

-

-

... More
73 MM Inner Dia

25

-

-

... More
Supply, Installation, Testing, and Commissioning (SITC) of flexible rubber bellows, rated for PN 16, designed to provide vibration isolation and thermal movement accommodation for the new chiller plant equipment. The bellows must be manufactured from high-quality, durable materials that are resistant to water, glycol, and other typical system fluids, ensuring long-term reliability under operating conditions. The scope shall include all necessary fittings, such as flanges, fasteners, and gaskets, to ensure secure and leak-proof connections. The bellows must be appropriately sized and selected to match the system's operating parameters, including pressure, temperature, and flow requirements, and must conform to relevant international standards for quality and performance. The contractor shall ensure that the installation includes proper alignment and anchoring of the connected equipment to prevent undue stress on the bellows. Additionally, all rubber bellow connections must be insulated with suitable materials to comply with existing site conditions and minimize thermal losses. Testing and commissioning shall include pressure testing of the installed bellows to 1.5 times the system’s working pressure to verify leak-free operation and structural integrity. The contractor shall provide all necessary documentation, including manufacturer’s technical datasheets, installation guidelines, and certification of compliance with project requirements, to ensure a robust and error-free installation. Make: Easy flex/Resistoflex/Dunlop/Cori

-

-

-

... More
100 MM

18

-

-

... More
Supply, install, test, and commission an electromagnetic BTU meter (DN 160) compatible with the Building Management System (BMS) via M-Bus protocol for accurate energy measurement in chilled water systems. The meter shall utilize electromagnetic induction for flow measurement with an accuracy of ±0.5% and include paired temperature sensors (PT100 or equivalent) for precise inlet and outlet water temperature measurement with an accuracy of ±0.15°C. The BTU meter shall integrate energy computation based on flow and temperature difference (ΔT), with a backlit LCD display for flow, ΔT, and energy consumption. The meter body shall be constructed from corrosion-resistant materials, flanged to EN 1092-1 or equivalent standards, and rated for PN 16 pressure. Temperature sensors shall be housed in stainless steel and installed with sensor pockets for durability and reliability. The service pipe insulation shall be polyurethane foam (PUF) with a minimum density of 36 kg/m³, 90% closed-cell content, compressive strength of 40 psi, and thermal conductivity of 0.14 Btu-in/hr/ft²/°F. The insulation shall fill the annular space between the service pipe and jacket, bonded to both, and enclosed in UV-resistant HDPE or equivalent outer material. The system shall conform to relevant standards, Calibration, integration with BMS, and functional testing shall be carried out to ensure accurate and reliable performance. Approved makes: BTU Meter: Forbes Marshall, Endress+Hauser (E+H), ABB, Siemens. Insulation: Kflex/ Armacell

1

-

-

... More
Supply, install, test, and commission manual balancing valves with a PN-16 pressure rating, equipped with pressure test cocks, specifically designed for regulating and balancing the outlet water flow from the chiller. The valves shall be constructed from high-quality cast bronze to ensure durability and resistance to corrosion. The valves must feature screwed-end connections, ensuring compatibility with the PPR pipe system. The installation process shall include all necessary fittings and accessories, such as flanges, fasteners, and adapters, to guarantee a secure, leak-free connection with the PPR pipes. The contractor must ensure that proper transition fittings, as recommended for PPR systems, are used to avoid any damage to the pipes during installation. Special care must be taken to accommodate the thermal expansion and contraction properties of PPR pipes to ensure long-term operational reliability. The valves shall be insulated in compliance with the current site conditions using nitrile rubber insulation or an equivalent material to prevent condensation and thermal losses. The insulation must be securely applied and sealed to ensure a continuous and moisture-resistant thermal barrier. The contractor shall ensure the balancing valves are properly calibrated during commissioning to achieve accurate flow regulation and system balancing. All work must be executed as per manufacturer recommendations, industry standards, and tender specifications, ensuring error-free installation, commissioning, and operation. The contractor shall also verify the functionality of the valves under system operating conditions to ensure compliance with project requirements. Make:T&A/Siemens/Honeywell/Audco

4

-

-

... More
Supply, install, test, and commission a wafer-type motorized butterfly valve featuring a stainless steel disc for reliable and efficient flow control in the chilled water system. The valve shall be equipped with a non-spring return rotary type on/off actuator, specifically designed for compatibility with the motorized butterfly valve. The actuator specifications shall include: Torque: 160 Nm for efficient operation. Running Time: 35 seconds for full open or close operation. Power Supply Compatibility: Ranging from 24 to 240 VAC or 24 to 125 VDC, ensuring flexibility and reliability in various system configurations. Built-in Auxiliary Switches: Two SPDT (Single Pole Double Throw) auxiliary switches for monitoring and control integration. The installation process shall ensure proper alignment and secure mounting of the butterfly valve and actuator onto the PPR piping system using suitable transition fittings and seals to prevent any stress or leaks at the connection points. The contractor must follow all manufacturer recommendations and best practices to ensure compatibility with the thermal and mechanical properties of the PPR pipes. During commissioning, the contractor shall verify the proper operation of the valve and actuator, including testing the torque, running time, and auxiliary switch functionality under system conditions. All wiring, interconnections, and accessories required for the actuator's operation and integration with the Building Management System (BMS) or control panel shall be included. The valve and actuator assembly must be insulated where applicable, using materials compatible with the site’s thermal and environmental requirements. All work must comply with the relevant industry standards, project specifications, and tender requirements, ensuring a fully functional, reliable, and long-lasting installation. Make:JCI/Honeywell/Siemens

4

-

-

... More
supply, install, test, and commission manual butterfly valves with a PN-16 pressure rating, designed for efficient flow control in the chilled water system. The valves shall feature a cast iron body, a nylon-coated SGI (Spheroidal Graphite Iron) disc, an EPDM seat, and a stainless steel (SS 431) shaft for enhanced durability and corrosion resistance. The valves shall be of the wafer type and operated by a hand lever for reliable flow opening and closing functionality. The scope of work shall include the provision and installation of all necessary fittings and accessories, such as flanges, fasteners, and seals, to ensure a secure, leak-free connection with the piping system. The installation must take into account compatibility with PPR pipes, using appropriate transition fittings to prevent damage and ensure a robust and long-lasting connection. The valves shall be insulated as per the existing site conditions, using materials that prevent condensation and thermal losses while maintaining the operational integrity of the valve and piping system. The insulation must be properly sealed and installed to ensure a continuous thermal barrier. The contractor shall ensure that all valves are tested and commissioned to verify proper operation and compliance with the project specifications. The work must adhere to all relevant industry standards, tender requirements, and manufacturer recommendations, ensuring a fully functional, reliable, and durable system upon completion. Make:Honeywell/Advance/Audco

-

-

-

... More
150 MM

5

-

-

... More
100 MM

29

-

-

4

-

-

... More
Supply, install, test, and commission Non-Return Valves (NRV) with a PN-16 pressure rating, specifically designed for use with the new pump sets to ensure unidirectional flow and prevent backflow. The NRVs shall be constructed from durable materials suitable for chilled water applications, ensuring reliability and long-term performance under varying operational conditions. The scope of work shall include all necessary fittings, such as flanges, fasteners, and gaskets, to ensure secure and leak-free connections with the piping system. The contractor must ensure proper alignment and installation of the NRVs, using suitable methods to prevent undue stress on the piping system, particularly for PPR pipes, by employing appropriate transition fittings and supports. The NRVs shall be insulated in accordance with the existing site conditions using high-quality insulation material, such as nitrile rubber, to prevent thermal losses and condensation. The insulation shall be applied meticulously, covering all valve surfaces and joints, and sealed to maintain a continuous thermal barrier. The contractor shall conduct thorough testing and commissioning of the NRVs to verify their functionality and ensure compliance with the project specifications and performance standards. All work must adhere to relevant industry standards, manufacturer recommendations, and tender requirements, ensuring a reliable and efficient installation. Make:L&T/Honeywell/Audco/Advance

5

-

-

... More
Supply, install, test, and commission a two-way modulating valve designed for the automatic bypass of chilled water from the supply header to the return header, operating based on signals received from the primary variable controller. The valve shall have a PN-16 pressure rating to ensure reliable and safe operation under the specified system conditions. The modulating valve shall be equipped with a high-precision actuator capable of accepting and responding to the signal from the primary variable controller for accurate modulation. The actuator shall be compatible with industry-standard control signals and capable of smooth and reliable operation. The scope of work shall include the provision of all required accessories, such as matching flanges, bolts, nuts, and gaskets, to ensure secure and leak-free installation. The valve and actuator assembly must be insulated using appropriate materials, such as nitrile rubber or equivalent, to minimize thermal losses and prevent condensation. The insulation must be installed meticulously, covering all surfaces and joints, and sealed to maintain a continuous barrier. The contractor shall ensure proper alignment, calibration, and integration of the valve and actuator with the primary variable controller. All work must comply with relevant industry standards, tender specifications, and manufacturer recommendations. Comprehensive testing and commissioning shall be performed to verify the valve's functionality and ensure reliable and efficient operation within the chilled water system. Make:Honeywell/Siemens/JCI/Danfoss

1

-

-

... More
Supply and install Chilled Water (CHW) test points, designed for precise monitoring and measurement of system parameters such as pressure, temperature, and flow within the chilled water network. The test points shall be constructed from durable, corrosion-resistant materials compatible with the operating conditions of the chilled water system and shall include appropriate sealing to ensure leak-free operation. The installation scope shall include all necessary fittings and accessories, such as valves, adaptors, caps, and seals, to ensure secure and functional connections with the chilled water piping system. The contractor must use suitable transition fittings for PPR pipes, ensuring compatibility and preventing any stress or damage to the piping during installation. The test points shall be installed at designated locations, as specified in the tender documents or approved by the consultant, to allow for easy accessibility during maintenance and monitoring activities. Proper insulation must be applied to the test points, using materials consistent with the pipe insulation, to maintain thermal integrity and prevent condensation. The contractor shall ensure all work is executed in accordance with relevant industry standards, project requirements, and manufacturer guidelines. Comprehensive testing shall be conducted post-installation to confirm the functionality and reliability of the test points under system operating. Make:Anergy/Econosta

8

-

-

... More
Supply and install a flow switch designed to monitor and ensure proper flow within the chilled water system. The flow switch shall be constructed from durable, corrosion-resistant materials suitable for the operating conditions of the chilled water application, ensuring long-term reliability and accurate operation. The scope of work shall include the provision of all necessary fittings, adaptors, fasteners, and seals to enable secure and leak-free integration of the flow switch into the piping system. Special care must be taken to ensure compatibility with PPR pipes, including the use of appropriate transition fittings to avoid stress or damage to the pipes during installation. The flow switch must be calibrated and tested to respond accurately to system flow conditions, providing reliable input signals for safety or operational requirements, such as pump protection or system interlocks. The installation shall include proper alignment and mounting as per the manufacturer’s guidelines to prevent operational issues and ensure consistent performance. The contractor shall also insulate the flow switch and associated piping connections using suitable materials, such as nitrile rubber insulation, to prevent condensation and maintain thermal efficiency. All work must be executed in compliance with relevant industry standards, tender specifications, and manufacturer recommendations. Post-installation testing and commissioning shall be performed to verify the functionality and integration of the flow switch into the system. Make:Honeywell/Siemens/Danfoss

4

-

-

... More
supply and install an automatic air separator designed to effectively remove entrained air and microbubbles from the chilled water system, ensuring optimal system performance and preventing operational issues caused by air accumulation. The air separator shall be constructed of durable, corrosion-resistant materials and rated for PN-16 pressure, suitable for the chilled water system’s operating conditions. The scope of work shall include all necessary fittings and accessories, such as matching flanges, bolts, nuts, gaskets, and isolation valves, to facilitate secure and leak-free installation. The separator shall be equipped with an automatic air vent for continuous air removal, ensuring maintenance-free operation under standard system conditions. The installation shall ensure compatibility with the PPR piping system, employing appropriate transition fittings to avoid stress or damage during assembly. Proper insulation shall be applied to the air separator and its connections to prevent condensation and maintain thermal efficiency. The contractor shall ensure the air separator is installed at the appropriate location in the system, as per the design specifications, to maximize air removal efficiency. All work must comply with relevant industry standards, manufacturer guidelines, and tender requirements. Post-installation testing and commissioning shall be carried out to verify functionality and ensure the system operates reliably and efficiently.. Make:Emerald/Anergy

1

-

-

... More
Supply, Installation, Testing, and Commissioning of Y-strainers with a PN-16 rating, complete with SS 304 filter screens featuring 3 mm perforations and 24G flanged end connections, for the new pump sets. The quoted amount should be inclusive of all necessary fittings, such as flanges and fasteners. These components should also be insulated in accordance with the existing site conditions. Make:Armstrong/Leader/Honeywell/Sant

5

-

-

... More
Supply and install a 15mm air vent with a brass body, designed for efficient automatic air release in the chilled water system. The air vent shall be constructed from high-quality, corrosion-resistant brass to ensure durability and reliable performance under varying operational conditions. The installation shall include all necessary fittings and accessories to integrate the air vent seamlessly into the system. The work must adhere to relevant industry standards and tender specifications, ensuring a leak-free and efficient operation upon commissioning. Make:Anergy/Flamco/Amprol

7

-

-

... More
Supply and install a pressure gauge assembly with a 100 mm (4-inch) dial, featuring a stainless steel (SS) body, syphon, and valve, with brass internals and a 3/8" BSP connection for accurate pressure measurement. The pressure gauge assembly must be compatible with PPR piping and constructed from high-quality materials to ensure durability, corrosion resistance, and reliable performance under varying operational conditions. The installation shall include suitable mounting provisions, such as reinforced pipe sections or pre-installed sockets, to ensure secure integration into the PPR piping system without compromising its structural integrity. Proper alignment and support mechanisms shall be provided to prevent undue stress on the pipes, and the syphon shall be positioned correctly to protect the gauge from direct exposure to high-temperature or high-pressure mediums. The contractor shall ensure all fittings and connections are leak-free and robust, adhering to relevant industry standards and tender specifications. All work must guarantee seamless functionality, reliable operation, and compliance with the specified performance requirements for long-term system reliability. Make:Baumer/WIKA/Ashcroft

18

-

-

... More
Supply and install a thermometer with thermowell, featuring a 4-inch (100 mm) dial, stainless steel (SS) body, and a bimetal sensing element for accurate and reliable temperature measurement. The thermowell shall be constructed from high-quality stainless steel and specifically designed to ensure compatibility with PPR pipes, providing protection for the thermometer from direct exposure to the process medium. The installation shall include proper integration into the PPR piping system using suitable fittings and sealing mechanisms to ensure leak-free operation without compromising the pipe structure. The contractor must provide adequate supports and ensure proper alignment during installation to avoid stress on the PPR pipes. The thermowell insertion depth and positioning shall be carefully planned to avoid interference with flow dynamics and ensure accurate readings. Any provision required, such as pre-installed sockets or reinforced pipe sections, shall be included in this scope of work to facilitate smooth installation and commissioning. All work must comply with relevant industry standards and tender specifications, ensuring optimal functionality and long-term reliability of the system. Make:Baumer/WIKA/Ashcroft

8

-

-

... More
Supply, install, and test MS (Mild Steel) angle/channel structures designed to provide robust and reliable support for the chilled water piping system, including associated valves and fittings. The MS angle structures shall be constructed to meet the specific load requirements of the pipes, ensuring stability and alignment without imposing undue stress on the PPR pipes. The installation shall include proper anchoring of the structures to the terrace-level floor using suitable fasteners, bolts, or chemical anchors, with appropriate measures to prevent water ingress through the anchoring points. To ensure waterproofing: Sealing Material: All anchoring holes and fasteners shall be sealed using high-quality waterproofing compounds or sealants compatible with terrace-level construction materials. Protective Coating: After sealing, the anchoring area shall be coated with a flexible waterproof membrane to provide an additional barrier against water penetration. Drainage Consideration: The installation layout must avoid blocking drainage pathways on the terrace to prevent water pooling near the structures. The MS structures shall be surface-treated and painted for durability and corrosion resistance. The painting process shall include: One coat of epoxy primer with a Dry Film Thickness (DFT) of 40–50 microns. Two coats of epoxy topcoat with a DFT of 80–100 microns. The installation process must ensure proper leveling, alignment, and load distribution to prevent undue stress on the floor or piping system. Testing shall verify the structural integrity, load-bearing capacity, and proper alignment of the supports. All work must comply with relevant industry standards and tender specifications, ensuring a secure, durable, leak-proof, and reliable support system for the chilled water piping. Approved Make: Tata/Jindal

1

-

-

... More
Supply and install 50 mm thick external thermal insulation made of Class O closed-cell nitrile rubber for exposed PPR pipes in the chilled water system. The insulation shall provide excellent thermal resistance, prevent condensation, and maintain energy efficiency under varying environmental conditions, while being fully compatible with the characteristics of PPR pipes. The insulation material shall be securely applied to the PPR pipes using approved methods and adhesives that do not compromise the structural integrity or chemical properties of the pipes. All joints, seams, and terminations must be sealed using appropriate techniques to ensure a continuous and airtight thermal barrier. The insulation shall be installed with adequate support and alignment to prevent sagging, displacement, or damage during operation. Special care must be taken to accommodate potential pipe expansions and vibrations, incorporating flexible sealing and fastening solutions as required. The installation must also include all necessary accessories, such as adhesive tapes, sealants, and fittings, to guarantee a professional and durable finish. The insulation system must be weatherproof to withstand outdoor conditions and include provisions to prevent water ingress or UV degradation. The Class O nitrile rubber insulation shall meet all relevant fire resistance and performance standards. All work must be performed in compliance with project specifications, tender requirements, and industry standards to ensure proper functionality, reliability, and long-term operational efficiency. The contractor shall ensure comprehensive testing and inspection of the insulation system during commissioning to verify its integrity and performance. Approved makes: Kflex/Armacell

80

-

-

... More
Supply and install a weatherproof cladding system over the 50 mm thick Class O nitrile rubber insulation applied to the exposed PPR pipes in the chilled water system. The cladding system shall include a layer of glass cloth reinforcement and two coats of vapor barrier (Foster coating) to ensure comprehensive protection against weather, UV radiation, and moisture ingress. The glass cloth shall be securely wrapped over the nitrile rubber insulation, providing mechanical strength and a stable base for the vapor barrier. The Foster coating shall be applied in two uniform coats to achieve a durable and continuous vapor barrier, effectively preventing condensation and ensuring the long-term performance of the insulation. The coating must be compatible with the underlying nitrile rubber insulation and provide resistance to environmental wear and tear. The installation process shall include all necessary surface preparation to ensure proper adhesion of the coating. All seams, joints, and terminations shall be sealed meticulously to maintain a complete and leak-proof barrier. The contractor must ensure that the cladding system does not compromise the flexibility and expansion characteristics of the underlying PPR pipes and insulation. The weatherproof cladding system must comply with all relevant standards for durability, thermal efficiency, and fire resistance. The contractor shall conduct thorough inspections and testing during installation and commissioning to verify the integrity and functionality of the cladding system. All work must be executed as per the tender specifications and approved project requirements, ensuring a reliable and long-lasting protective solution for the exposed PPR pipes.

80

-

-

... More
Electrical Panel Works (HVAC Panel-01) Fabrication Supply installation testing and commissioning of 400A, LT, floor mounted type, dust and vermin proof, free standing, cubical type construction, made out 14SWG thick CRCA sheet fully compartmentalised, duly rust inhibited, degreased, zinc phosphated and powder coating painted with approved colour and quality, complete with hinged and earthed front doors, name plate, danger notice board, heavy duty rubber gaskets, removable gland plates made of 3mm thick sheet steel with CT Digital ammeters with cast resin type CTs and Digital Voltmeter with selector switch, indication lamps,high conductivity wrought aluminium busbars with SMC supports, heat shrinkable sleeves etc. all connections and inter-connections including mounting the following switch gears as per SLD with IP54 Incomer: 400A,36kA, 4P,Thermal magnetic type MCCB with all accessories including spreader link and extended rotary handle-1 Nos Digital Multifunction meter (VAF + W/VA/PF/Wh) LED meter Cl 1 with RS485 -1Nos 400/5A,10 VA,Cast resin type ,CL:0.5s ,CT-3 Nos 400/5A,10 VA,Cast resin type ,CL:1 ,CT-3 Nos Outgoings: 160A,25kA, 4P,Thermal magnetic type MCCB with all accessories including spreader link and extended rotary handle-4 Nos 100A,25kA, 4P,Thermal magnetic type MCCB with all accessories including spreader link and extended rotary handle-1 Nos 3-phase TOD meter,class 0.5s with RS 485 communication port - 1Nos

1

-

-

... More
Electrical Panel Works (HVAC Panel-02) Fabrication Supply installation testing and commissioning of 400A, LT, floor mounted type, dust and vermin proof, free standing, cubical type construction, made out 14SWG thick CRCA sheet fully compartmentalised, duly rust inhibited, degreased, zinc phosphated and powder coating painted with approved colour and quality, complete with hinged and earthed front doors, name plate, danger notice board, heavy duty rubber gaskets, removable gland plates made of 3mm thick sheet steel with CT Digital ammeters with cast resin type CTs and Digital Voltmeter with selector switch, indication lamps,high conductivity wrought aluminium busbars with SMC supports, heat shrinkable sleeves etc. all connections and inter-connections including mounting the following switch gears as per SLD with IP54 Incomer: 400A,36kA, 4P,Micro processor type MCCB with all accessories including spreader link and extended rotary handle-1 Nos Digital Multifunction meter (VAF + W/VA/PF/Wh) LED meter Cl 1 with RS485 -1Nos 400/5A,10 VA,Cast resin type ,CL:0.5s ,CT-3 Nos 400/5A,10 VA,Cast resin type ,CL:1 ,CT-3 Nos Outgoing: 160A,25kA, 4P,Thermal magnetic type MCCB with all accessories including spreader link and extended rotary handle-3 Nos 3-phase TOD meter,class 0.5s with RS 485 communication port - 1Nos

1

-

-

... More
LT Cable - Supply & laying of Following PVC sheathed / XLPE power cable , conductors of best conductivity copper 1.1kV grade of the following sizes in the existing TRAY/RCC/ HUME / STONE WARE/ GI/ DWC pipe / Concrete trench/Clamping on wall etc. as required.

-

-

-

... More
3.5x70 Sqmm XLPE (Copper) Cable

150

-

-

... More
3.5x6 Sqmm XLPE (Copper) Cable

150

-

-

... More
LT Cable - Supply & laying of Following A2XFY (Aluminium) power cable, conductors of best conductivity aluminium 1.1kV grade of the following sizes in the existing TRAY/RCC/ HUME / STONE WARE/ GI/ DWC pipe / Concrete trench/Clamping on wall etc. as required.

-

-

-

... More
3.5x240 Sqmm A2XFY (Aluminium) Cable

90

-

-

... More
3.5x185 Sqmm A2XFY (Aluminium) Cable

180

-

-

... More
LT Cable - Supply & laying of Following PVC sheathed / XLPE power cable , conductors of best conductivity copper 1.1kV grade of the following sizes in the existing TRAY/RCC/ HUME / STONE WARE/ GI/ DWC pipe / Concrete trench/Clamping on wall etc. as required.

-

-

-

... More
3.5x70 Sqmm XLPE (Copper) Cable

10

-

-

... More
3.5x6 Sqmm XLPE (Copper) Cable

10

-

-

... More
LT Cable - Supply & laying of Following A2XFY (Aluminium) power cable, conductors of best conductivity aluminium 1.1kV grade of the following sizes on wall surface as required (clamped with 1mm thick saddle).

-

-

-

... More
3.5x240 Sqmm A2XFY (Aluminium) Cable

10

-

-

... More
3.5x185 Sqmm A2XFY (Aluminium) Cable

10

-

-

... More
End Termination - Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.

-

-

-

... More
3.5x70 Sqmm XLPE (Copper) Cable

10

-

-

... More
3.5x6 Sqmm XLPE (Copper) Cable

10

-

-

... More
End Termination - Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.

-

-

-

... More
3.5x240 Sqmm A2XFY (Aluminium) Cable

2

-

-

... More
3.5x185 Sqmm A2XFY (Aluminium) Cable

4

-

-

... More
Supplying and fixing of following ways surface/ recess mounting, vertical type, 415 V, TPN MCB distribution board of sheet steel, dust protected, duly powder painted, inclusive of 100 A, tinned copper bus bar, common neutral link, earth bar, din bar for mounting MCBs (but without MCBs and incomer, suitable for MCCB Incomer) as required.

-

-

-

... More
3P 4W VDB

2

-

-

... More
Supplying and fixing 100A,25kA, 4P,Thermal magnetic type MCCB in the existing MCB DB complete with connections, testing and commissioning etc. as required.

2

-

-

... More
Supplying and fixing Motor protection circuit breaker for 2.2kW 3Phase motor (Conform to IEC 60947-1, IEC 60947-2, IEC 60947-4) in the existing MCB DB complete with connections, testing and commissioning etc. as required.

5

-

-

... More
Supplying and fixing following rating, 240/415 volts, "C" curve, miniature circuit breaker suitable for inductive load of following pole in the existing MCB DB complete with connections, testing and commisioning.

-

-

-

... More
5A to 32A ,SP MCB

3

-

-

... More
MCB Blanking plate

12

-

-

... More
Supply, laying/fixing of 6 SWG Copper wire for earthing of switchboard and jointing as per IS:3043 / 87 in open trench / walls / tray pulling through pipes etc as required.

20

-

-

... More
Providing and fixing 32 mm X 6 mm G.I. strip on surface or in recess for connections etc. as required.

200

-

-

... More
Providing and fixing 25 mm X 6 mm G.I. strip on surface or in recess for connections etc. as required.

100

-

-

... More
Supply, laying/fixing of 6 SWG GI for earthing of switchboard and jointing as per IS:3043 / 87 in open trench / walls / tray/ pulling through pipes etc as required

100

-

-

... More
Supply and erection of vertical and horizontal type cable trays and cable supports fabricated out of MS angles (ISA) and MS flats with sufficient width and spacing between successive cross members and supported at adequate spacing. The cable trays and supports shall be painted with two coats of Zinc Chromate primer and two coats of enamel paint. (Size as specified by Technopark as per site conditions)

150

-

-

... More
Supply, install, test, and commission 3 TR chilled water 4-way cassette units for the entrance area, complete with the following features: Each cassette unit shall include a chilled water coil, high-efficiency fan motor, and a GI casing for durability and performance. The unit shall be equipped with an integrated drain pump, interlock system, necessary sensors, and a thermostatic control function. Additional features include a washable filter with a minimum 90% efficiency for particles up to 10 microns, BMS compatibility, a self-contained valve station, and a self-diagnostic function for efficient and reliable operation. The scope of work includes the supply and installation of all required piping (from the PPR tapping point nearby), cables, and fittings as per site conditions, drain piping, and proper insulation using 19 mm thick nitrile rubber to prevent condensation and heat loss. Each unit shall also include a 25 mm Y-strainer for protecting the system from debris and ensuring smooth operation. All work shall be performed in accordance with relevant industry standards, manufacturer recommendations, and tender specifications to ensure a fully functional and reliable installation. The contractor shall ensure proper commissioning and provide all necessary documentation and support for seamless integration into the chilled water system. Approved Makes: Midea / Kubic/JCI/Trane

1

-

-

... More
Supply, install, test, and commission 3 TR chilled water 4-way cassette units for the electrical room, ensuring efficient and reliable cooling. Each cassette unit shall include a chilled water coil, high-efficiency fan motor, and a GI casing for durability and robust performance. The unit shall be equipped with an integrated drain pump, interlock system, necessary sensors, and a thermostatic control function for precise operation. Additional features include a washable filter with a minimum 90% efficiency for particles up to 10 microns, BMS compatibility, a self-contained valve station, and a self-diagnostic function for enhanced functionality and ease of maintenance. The scope of work includes the supply and installation of all required piping, cables, and fittings based on site-specific conditions, along with drain piping and insulation using 19 mm thick nitrile rubber to minimize thermal losses and condensation. Each unit shall also be fitted with a 25 mm Y-strainer to ensure the protection of the chilled water system from debris and contaminants. The contractor shall ensure that the installation meets all industry standards, project requirements, and tender specifications, providing a fully functional and reliable cooling solution for the electrical room. Proper commissioning, including all necessary testing and documentation, shall be carried out to confirm performance and integration with the overall chilled water system. Approved Makes: Midea / Kubic/JCI/Trane

1

-

-

... More
Supply, install, test, and commission a 25mm 2-way modulating valve with thermostat, designed for precise flow control in the chilled water system. The valve station shall include a high-quality modulating valve with an actuator capable of accepting industries control signals for proportional flow adjustment. The actuator and valve shall be compatible with compatible with the chilled water application, and constructed from durable, corrosion-resistant materials to ensure reliable operation under varying conditions. The installation shall include all necessary fittings, connections, and accessories, such as flanges, bolts, nuts, and gaskets, to ensure seamless integration into the chilled water piping network. The valve station must provide leak-free performance and allow for efficient modulation under the specified system pressure and flow conditions. The contractor shall ensure proper alignment, calibration, and programming of the actuator for smooth modulation and integration with the system controls or Building Management System (BMS). Comprehensive testing and commissioning shall be conducted to verify functionality, including responsiveness to control signals, flow accuracy, and system compatibility. The entire installation must adhere to industry standards, manufacturer guidelines, and the tender specifications, ensuring a robust, efficient, and reliable modulating valve station that meets the project's operational and performance requirements. Make:JCI/Siemens/Honeywell

2

-

-

... More
Supply and install a DN 65 electromagnetic BTU meter, designed for precise measurement of energy consumption in the chilled water system. The BTU meter shall be BMS compatible and support the M-Bus protocol for seamless integration with the Building Management System (BMS). The meter must include a robust and accurate electromagnetic flow sensor and a high-precision temperature sensor to calculate thermal energy transfer efficiently. The installation of the electromagnetic BTU meter shall strictly follow the manufacturer's recommendations regarding straight pipe lengths upstream and downstream of the meter (e.g., 3D, 5D, or any other specific requirements). The contractor must ensure the installation facilitates laminar flow for accurate readings. Proper alignment and secure mounting arrangements must be implemented to avoid angular misalignment, vibrations, or any operational interference. The service pipe insulation shall consist of high-quality polyurethane foam with the following specifications: Minimum density of 36 kg/cu m. Minimum 90% closed-cell content. Minimum compressive strength of 40 psi. Thermal conductivity of 0.14 Btu-in/hr/ft²/°F. The insulation shall completely fill the annular space between the service pipe and jacket, ensuring a tight bond with both. The polyurethane foam shall be covered with a durable and weather-resistant jacket to protect against environmental factors and mechanical damage. All necessary fittings, cables, and accessories for the BTU meter installation must be included. The contractor shall conduct comprehensive testing and calibration post-installation to confirm the accuracy and functionality of the meter. All work must comply with the relevant standards, manufacturer guidelines, and tender specifications, ensuring a reliable and durable installation. (Make:Forbes Marshall, Endress+Hauser (E+H), ABB, Siemens)

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.