Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Technopark Tender
Civil And Construction
Excavation
Eprocure
Opening Date22 Dec 2023
Closing Date23 Jan 2024
Tender Amount₹ 35,12,983
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
Earth Filling In Proposed Rehabilitation Area At Technopark Phase Iii Campus, Trivandrum
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ETPK_635233_1Bid Award Id
ViewTender No
ETPK/PH3/193/2023-24Tender Authority
Technopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, sides and cover slab of retaining wall and drains etc for concrete. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
706.86
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level for drain and retaining wall: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
100.34
-
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for drain and retaining wall Thermo - Mechanically Treated bars of grade Fe-500D or more. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
8291.03
-
-
... More
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Technopark campus as per direction of Engineer -in- Charges The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
1.1
-
-
... More
Filling with available excavated (excluding rock) from places of availability with in a lead of 5 km gravelly earth in which particle size more than 475 microns should not be less than 20% and particle size less than 2 microns should not be more than 5% including conveyance to site, laying and spreading in layers not more than 30cm including all leads and lifts, breaking clods, watering at optimum moisture content and consolidating each layer using power roller of 8T to 10T capacity for every layer and taking extra care for top most layer to give an even level compact surface including all labour charges etc. complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
2484.42
-
-
... More
Supplying and fixing RCC precast slab 1:2:4 (including steel reinforcement) - 100X50X10 cm or nearest as per site condition and direction of engineer in charge. For the cover slab of the drain. The rate includes all material charges, side maintenance, leveling, fixing in proper alignment, labour, Transportation, scaffolding (if needed) loading/ unloading at the workspace and removal of debris from the work site, etc. complete as per the direction of the engineer in charge.
99
-
-