Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Technopark Tender
Civil And Construction
Building Construction
Eprocure
Opening Date12 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 21,15,300
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
Shifting Of 3 Nos Of Dg Sets At Gayathri Building, Technopark
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ETPK_680387_1Bid Award Id
ViewTender No
ETPK/PH-I/2024-25/E-03Tender Authority
Technopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
8" dia MS Pipe with related accessories
21
-
-
Dismantling of MS Supporting structure fabricated out of MS angles (ISA) and MS flats, Existing DG Yard steel work in built up sections in angles, tees, flats, channels etc. including all gusset plates, bolts, nuts, cutting riverts, welding ,water channel etc. including dismembering and stacking within 200 metres lead without any damage in the existing system and as per site conditions and instructions from Technopark.
3000
-
-
Dismantling of existing DG Yard roofing including GS sheets, ridges, hips, valleys and gutters etc., and stacking the material within 200 metres lead without any damage in the existing system and as per site conditions and instructions from Technopark.
320
-
-
Dismantling of the existing silencer with associated accessories of the 500kVA DG Sets. The process will be executed with utmost care and precision to ensure no damage to the components. Following dismantling, the silencer pipe will be systematically stacked at a designated location within 200 meters, adhering to the instructions provided by Technopark.
2
-
-
Dismantling of existing acoustic enclosure with associated equipment of the 500kVA DG Sets with atmost care and supports without any damage of the acoustic enclosure and existing system. Following dismantling, the acoustic enclosure will be systematically stacked at a designated location within 200 meters by mechanical means, adhering to the instructions provided by Technopark.
2
-
-
Dismantling of the existing 990-litre capacity Fuel Oil Tank (Day Tank) made of steel along with heavy diesel fuel line pipe. The work also includes the disconnection and removal of the 25mm heavy diesel fuel line pipe (approximate 57 meter) and related equipment from the DG set to the fuel tank. The entire process will be executed with utmost care and support to prevent any damage. Following dismantling, the fuel tank and fuel pipe will be systematically stacked at a designated location within 200 meters, adhering to the instructions provided by Technopark.
3
-
-
The Dismantling, shifting and commissioning of the 500 kVA Generator Sets(include alternator diesel engine, radiator etc with all accesories) from existing location to the newly constructed site near the Gayarti substation involves lifting by mechanical means and refixing of the existing Engine, Alternator and Radiator, along with the DG auto control panel, Battery with battery stand, and related accessories etc. Both the engine and alternator will be mounted on the existing base frame made of MS channel, including the required nut, bolts, plates, channels, angles, and other accessories as per the specified requirements. Additionally, necessary vibration isolation arrangements will be implemented as needed. Proper rectification works, civil works (excluding DG foundation), along with all other necessary tasks for the engine, alternator, and radiator, confirming to all the IS/IES/Manufactural standards, site conditions and adhering to the instructions provided by Technopark.
2
-
-
Rectification work of existing 500kVA DG Set radiator including supply of material required, radiator cleaning, along with the radiator leak testing, leak rectification, coolant filling including supply of coolent, and other necessary rectification works as per the site conditions and instructions from Technopark.
1
-
-
The Dismantling, shifting and commissioning of the 380kVA DG set (include alternator diesel engine, radiator etc with all other accesories) with acoustic enclosure with built-in Anti Vibration Mounting (AVM) from its existing location to the newly constructed site near the Gayarti substation involves lifting by mechanical means and refixing of the existing Engine, Alternator, Radiator, acoustic enclosure along with the DG auto control panel, Battery with battery stand, and related accessories. Both the engine and alternator will be mounted on a suitable base frame made of MS channel, including the required nut, bolts, plates, channels, angles, and other accessories as per the specified requirements. Additionally, necessary vibration isolation arrangements will be implemented as needed. Proper rectification works, civil works (excluding DG foundation ),along with all other necessary tasks for the engine, alternator, and radiator, confirming to all the IS/IES/Manufactural standards and site conditions. The scope of the work shall Include any other necessary rectification works as per the site conditions and instructions from Technopark.
1
-
-
Fixing of existing DG acoustic enclosure with atmost care and supports to a newly constructed civil foundation by mechanical means as per instructions and site condition including all the neccessary material, modification etc. are required. Proper rectificaion works at corroded portions, civil works, repairing works for damages occured while refixing of acoustic enclosure and all other necesary works shall be performed by contractor as per standards and site conditions and instructions from Technopark.
-
-
-
500 kVA DG Sets
2
-
-
Fixing of existing DG silencer and associated equipment with atmost care and supports to the relocated DG Sets by mechanical means as per drawings and instructions. Proper rectificaion works, painting of silencer with aluminium primer and heat-resistant, rust - proof paint, repairing works for damages occured while refixing of silencer and all other necesary works shall be performed by contractor as per standards and site conditions and instructions from the TP Engineers.
-
-
-
500 kVA DG Sets
2
-
-
Supply, erection, and commissioning of additional length of exhaust pipes with long-radius bend from residential silencer with necessary clamps, fixtures, civil works, etc (including supply of all necessary items) for following sizes, including a suitable rain guard for the top. Fixing shall be done with proper clamps, expansion bolts, support angle fixed on the wall/inside the duct/structure as instructed by the Engineer. The rate should include scaffolding and other related auxiliary works and welding if needed including loading and unloading.
-
-
-
8" dia MS Pipe
21
-
-
6" dia MS Pipe
2
-
-
Fixing, and commissioning of existing dismantled exhaust pipes with long-radius bend from residential silencer with necessary clamps, fixtures, civil works, etc (including supply of all necessary items) for following sizes, including a suitable rain guard for the top. Fixing shall be done with proper clamps, expansion bolts, support angle fixed on the wall/inside the duct as instructed by the Engineer. The rate should include scaffolding and other related auxiliary works and welding if needed.
-
-
-
8" dia MS Pipe
5
-
-
6" dia MS Pipe
13
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete for the Supply and erection of supporting structure for exhaust pipe fabricated out of MS angles with sufficient width and spacing between successive cross members and supported at adequate spacing and fixed properly on ground using concrete (Size as specified by Technopark as per site conditions).
900
-
-
Lifting and repositioning the existing Fuel Oil Tank (Day Tank) by mechanical means, constructed of steel with a specified capacity, will be carried out with utmost care. The process will involve relocating the tank from its current position in the ground and securing it to a newly constructed civil foundation and rectification of fuel gauge, inlet valve, return valve and level indication and other accessories etc (including supply of all necessary items) according to the provided drawings and instructions given by Technopark.
-
-
-
990 Litter capacity Diesel tank
2
-
-
Supply and installation of new Fuel Oil Tank (Day Tank) made of 3mm Mild steel as per UL 142 standards and of approved make with fuel gauge, inlet valve, return valve and level indication and other accessories etc. as required at the newly constucted civil foundation for DG 3 of capacity 380 kVA as per the instructions from Technopark.
-
-
-
990 Litter capacity Diesel tank
1
-
-
Supply and fixing Heavy duty Fuel line pipe with 25mm MS pipe with necessary bends, clamps,supports and valves, painting of fuel line of heavy duty pipe with primer, temperature withstanding and rust-proof paint are required.
72
-
-
Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. Also, consider the buyback cost of following dismantled existing steel sections/structure made of MS flat, MS angle, GI Hollow tubes/purlin/rafters/single section.
The total weight of dismantled items is approximately 2500 kg. Clear all debris from the site.
970
-
-
Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
970
-
-
Providing and fixing precoated galvanised steel sheet roofing accessories of 0.45 mm thick Tile profile roof sheet (+0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: Ridges, eaves & Vally Gutters with plain (500-600 mm). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space for all heights etc complete as per the direction of engineer in charge.
Also, consider the buyback cost of scraped/dismantled steel sheet roofing for the existing steel structure . Also, consider the buyback cost of steel sheet.
The total weight of dismantled items is approximately 100 kg. Clear all debris from the site.
250
-
-
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: Ridges plain (500-600 mm). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space for all heights etc complete as per the direction of engineer in charge.
40
-
-
Providing and fixing of 6" Square gutter pathy with 4" down spot at 6 meters C/C with necessary clamping with main purlin and necessary connections together Down spot pipe may be paid separately. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the workspace for all heights etc complete as per the direction of engineer in charge.
80
-
-
Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 m dia 4 Kgf/cm2 - External work - Exposed on wall for rainwater pipe. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space for all heights etc complete as per the direction of engineer in charge.
18
-
-
Painting of following DG associated accessories of approved brand, manufacture and color approved by Technopark.
-
-
-
Painting of acoustic enclosure of DG Sets with primer and synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats . The paint shall be applied uniformly on the surface.
110
-
-
Painting of 8"dia exhaust pipe with 1coat of Epoxy zinc phosphate primer and 2 coats of Heat resistant synthetic medium based two packs Aluminium paint. The paint shall be applied uniformly on the surface. The outer surfaces shall be cleaned and scrapped thoroughly before painting the exhaust pipe.
27
-
-
Painting of 6"dia exhaust pipe with 1coat of Epoxy zinc phosphate primer and 2 coats of Heat resistant synthetic medium based two packs Aluminium paint. The paint shall be applied uniformly on the surface. The outer surfaces shall be cleaned and scrapped thoroughly before painting the exhaust pipe.
13
-
-
Painting of Fuel Oil Tank (Day Tank) with primer and synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats . The outer surfaces shall be cleaned and scrapped thoroughly before painting if required and site condition.
22
-
-
Painting of structure of round, square or rectangular hollow tubes/purlin/rafters/single section made of steel with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats
160
-
-
Electrical Items (Part-B)
-
-
-
Dismantling of existing PVC insulated and PVC sheathed / XLPE power/control cable of 1.1 KV grade of following sizes with out any damage in the existing systems as per the direction of Engineer in Charge
-
-
-
4Rx3.5Cx400 sqmm Al Cable
14
-
-
3Rx3.5Cx400 sqmm Al Cable
15
-
-
2Rx3.5Cx240 sqmm Al Cable
15
-
-
12Cx2.5 sqmm Cu control cable
45
-
-
Dismantling of existing end termination of following PVC insulated and PVC sheathed / XLPE power or control cable from the existing DG sets with out any damage in the existing systems as per the direction of Engineer in Charge
-
-
-
3.5Cx400 sqmm Al Cable
7
-
-
3.5Cx240 sqmm Al Cable
2
-
-
12Cx2.5 sqmm Cu control cable
3
-
-
Laying of existing PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following sizes through existing cable TRAY/RCC/ HUME / GI/ DWC pipe / Concrete trench/Clamping on wall etc. as required in newly DG installed location
-
-
-
4Rx3.5Cx400 sqmm Al Cable
14
-
-
3Rx3.5Cx400 sqmm Al Cable
15
-
-
2Rx3.5Cx240 sqmm Al Cable
15
-
-
12Cx2.5 sqmm Cu control cable
45
-
-
Supply, Laying PVC insulated and PVC sheathed / XLPE control cable of 1.1 kV grade of 2.5 sqmm, 12 core cable through existing cable tray / trench.
10
-
-
Supplying and making necessary end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.
-
-
-
3.5Cx400 sqmm Al Cable
7
-
-
3.5Cx240 sqmm Al Cable
2
-
-
12Cx2.5 sqmm Cu control cable
3
-
-
Dismantling of existing GI/CI/Cu earth strip from the existing DG sets with out any damage in the existing systems and stacked at a designated location within 200 meters, adhering to the instructions provided by TP Engineers.
100
-
-
Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground/Surface as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm)
290
-
-
Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
9
-
-
Supply and erection of vertical and horizontal type cable trays and cable supports fabricated out of MS angles (ISA) and MS flats with sufficient width and spacing between successive cross members and supported at adequate spacing. The cable trays and supports shall be painted with two coats of Zinc Chromate primer and two coats of enamel paint. (Size as specified by Technopark as per site conditions)
100
-
-
Testing and commissioning of all the DG sets will be conducted after the successful DG shifting work. The contractor is required to run all the DGs with the DIEF system in accordance with the relevant IS/IEC and manufacturer standards, as well as per the direction of the Engineer in Charge.