Sports Kerala Foundation Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Sports Kerala Foundation - SKF Tender
Civil And Construction
Construction Material
Eprocure
Opening Date23 Jul 2024
Closing Date2 Aug 2024
Tender Amount₹ 62,60,625
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
One Panchayath One Playground -development Of Charamangalam Dvhss Ground In Cherthala Lac, Alappuzha- Retender
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SKF_670455_4Bid Award Id
ViewTender No
289/SKF/CE/2023-24Tender Authority
Sports Kerala Foundation ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
od244883/2023_2024 : SKF_OD 4/2022-2023 Supplying and stacking for measurement Sieved Jamuna Sand at site including cost of sand and carriage upto 5 k.m. lead all labour charges for stacking, loading and unloading etc complete.( Based on CPWD 30.2.2 & 30.2.4.3)
165
-
-
... More
od244926/2023_2024 : SKF_OD 2/2022-2023 Mixing earth and jamuna sand in the required proportion specified or directed by the Officer-in-charge including all cost of labour charges,hire charges of machineries etc complete.(Based on CPWD 30.2.9)
825
-
-
... More
od244927/2023_2024 : SKF_OD 3/2022-2023 Spreading of earth and jamuna sand in required thickness as per direction of officer-in-charge including all cost of labour charges, hire charges of machineries etc complete. (cost of earth and jamuna sand to be paid separately).( Based on CPWD 30.2.8)
825
-
-
... More
od273413/2023_2024 : SKF - OD 5/2022-2023 Consolidation of subgrade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc.including all cost of labour charges, hire charges of machineries,fuel,oil etc. complete.(Based on CPWD 16.1)
4125
-
-
... More
od268547/2023_2024 : Supply and installation of fixed type 7's Football Goal Post( 3.65 m x 1.8 m x 1.2 m) made of pipe 10 cm dia GI pipe with nylon net as per direction of Engineer in charge
1
-
-
... More
od277214/2023_2024 : Supply of Fixed 3.5 inch Volleyball post set with net including all necessary fitting, labor, transportation charges etc complete
1
-
-
... More
Drainage, kerb and Long jump pit
-
-
-
... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
177.24
-
-
... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
115.5
-
-
... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
25.18
-
-
... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
46.87
-
-
... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
85.25
-
-
... More
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
460.2
-
-
... More
od275950/2023_2024 : Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete. ( Based on MoRTH 55.25)
8.02
-
-
... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
3749.68
-
-
... More
50.18.9.10.1 : Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2
24
-
-
... More
od248949/2023_2024 : SKF_OD 15/2022-2023 Supply and Filling Fine Sand of approved quality in Long Jump Pit as per the direction of officer in charge.
24.75
-
-
... More
od253031/2023_2024 : Providing and fixing PVC pipes with 5 mm dia perforations, minimum 125 perforations per running metre, in trenches at required slope, as per specifications etc complete including the cost of all materials, labour etc. and as directed by the Engineer-in-charge. The rate includes cost of all materials, covering the pipe with Geo Textile Cloth,labour charges for trenching carriage of surplus earth to a lead of 50m etc complete. including jointing of pipes with one step PVC solvent cement etc complete as per direction of Engineer-in-Charge 150 mm dia 6 Kgf/cm2.
10
-
-
... More
Synthetic Runway for Long Jump and Triple Jump - Sub base work
-
-
-
... More
4.1.A.1 : Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 br Grading-I - Plant Mix Method
66
-
-
... More
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
49.5
-
-
... More
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
330
-
-
... More
5.2.b : Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
330
-
-
... More
5.3.2.a : Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.br For Grading II - (19 mm nominal size)br
16.5
-
-
... More
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
330
-
-
... More
5.6.2.a : Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grading - II (13.2 mm Nominal Size)br
8.25
-
-
... More
Synthetic Runway for Long Jump and Triple Jump - Surface work
-
-
-
... More
od254635/2023_2024 : SKF_OD 5/2022-2023 Supply of full PUR , World Athletics ( former IAAF) approved Synthetic Track Surfacing system in accordance with World Athletics standard suitable for conducting World Athletics approved international Athletic events. Total thickness of the synthetic track surfacing system shall be 14 to 15mm comprising 9.4 to 10.0 mm force reduction layer comprising 4.7mm Bottom Layer made with Black SBR granules embedded in PUR coating ,4.7mm Middle Layer(s): Black SBR granules embedded in PUR coating and final resilient wearing layer of granular texture, red-brown. Full PUR coating with EPDM granules embedded 5.0 mm. In high stress areas thickness should be as per World Athletics requirement. Laying and installation according to World Athletics specifications and approved methodology and drawings including provisions of installation of sleeves for throwing events, inlay equipment for pole vault, long & triple jump and steeple chase. This rate also include lane marking.
330
-
-
... More
Inauguration Stone and Name Board
-
-
-
... More
od277272/2023_2024 : SKF_OD 16/2022-2023 Providing and fixing 18 mm thick gang saw cut, mirror polished, pre-moulded and pre polished, machine cut for inauguration granite stone of required size, approved shade, colour and texture laid over 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) joint treated with white cement, mixed with matching pigment, epoxy touchups including rubbing, curing etc. complete at all levels. Area of slab over 0.50 sqm
1
-
-
... More
16.21 : Engraving letters in hard stone
500
-
-
... More
od367307/2023_2024 : Steel work with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete(Rate based on CPWD 50.10.2)
100.44
-
-
... More
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
80
-
-
... More
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
12.78
-
-
... More
13.71 : Lettering with black Japan pint of approved brand and manufacture
500
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements