Sports Kerala Foundation Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Sports Kerala Foundation - SKF Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date8 Nov 2024
Closing Date16 Nov 2024
Tender Amount₹ 3,45,642
Costs
EMD
₹ 8,700Document Cost
₹ 826Tender Fee
Refer Documents
Summary
Soil Investigation And Total Station Survey For The Construction Of District Stadium At Kila Campus, Kannur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SKF_704276_1Bid Award Id
ViewTender No
251/SKF/CE/2024-25Tender Authority
Sports Kerala Foundation ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Soil Investigation works
-
-
-
... More
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
1
-
-
... More
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
6
-
-
... More
56.3.a.1 : Boring with rotary power drilling equipment's in
all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
60
-
-
... More
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
60
-
-
... More
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
12
-
-
... More
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
12
-
-
... More
56.7 : Conducting standard penetration test in bore hole at any depth.
90
-
-
... More
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
90
-
-
... More
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) Machine boring for 5 bore holes.
1
-
-
... More
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) Additional set for machine boring(extra for bore holes exceeding 5 nos)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements