Soil Survey And Soil Conservation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
Renovation Of Muhyidheen Juma Masjid Pallikulam In Muhamma Gramapanchayath In Alappuzha District Under Revival Of Traditional Water Bodies Scheme
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DSSC_596151_1Bid Award Id
ViewTender No
SSSC/1505/2023-PG1Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
2.26.1
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked
materials.All kinds of soil
842.62
-
-
OD467/2023-2024
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
367.64
-
-
5.9.1
Centering and shuttering including strutting, etc and removal of form for foundation ,footings, bases of columns , etc for mass concrete
22.61
-
-
5.22.1
Steel reinforcement for RCC work including straightening, cutting, bending ,placing in position and binding all complete up to plinth level Mild steel and Medium Tensile stell bars.
818.91
-
-
5.1.2
Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering and shuttering , finishing and reinforcement - All work up to plinth level:1:1.5:3 (1cement : 1.5 coarse sand : 3graded stone aggregate 20 mm
nominal size)
13.11
-
-
7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
29.59
-
-
4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
32.68
-
-
4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:3:6 (1cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size)
4.28
-
-
4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:2:4(1cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)
3.58
-
-
10.26.3
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing , balcony railing , staircase railing and similar works , including applying priming coat of approves steel primer G.I pipes.
835.16
-
-
13.52.1
Finishing with Epoxy paint ( two or more coats) at all locations prepared and applied as per manufactures specifications including appropraiate priming coat, preparation of surface etc complete on steel work .
29.97
-
-
2.25
Filling available excavated earth ( Excluding rock) in trenches, plinth sides of foundation etc in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
284.24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements