Soil Survey And Soil Conservation Department Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department Tender

Works
Eprocure
Opening Date18 Jan 2019
Closing Date28 Jan 2019
Tender Amount₹ 30,28,641 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.8.1-Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kind of soil

142.5

-

-

... More
60.7.1 - DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charge etc. complete as per direction of departmental officers at site

423.75

-

-

... More
4.1.5 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteing- All work upto the the plinth level 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)

15

-

-

... More
5.9.5-Centring and shuttering including proping strutting etc. and removal of forms for lintels, beams, plinth beams, girdersbressumers and cantilevers

60

-

-

... More
Construction of Retaining Wall 1.00 mt Ht.

-

-

-

... More
2.31-Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings if girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared

400

-

-

... More
2.6.1- Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including disposal of excavated earth,lead up to 50 m and lift up to 1.50 jm disposed earth to be levelled and neatly dressed-All kind of soil

160

-

-

... More
2.8.1-Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kind of soil

160

-

-

... More
60.7.1 - DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charge etc. complete as per direction of departmental officers at site

370

-

-

... More
4.1.5 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteing- All work upto the the plinth level 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)

18

-

-

... More
5.9.5-Centring and shuttering including proping strutting etc. and removal of forms for lintels, beams, plinth beams, girdersbressumers and cantilevers

80

-

-

... More
Sub drain protection wall

-

-

-

... More
2.6.1- Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including disposal of excavated earth,lead up to 50 m and lift up to 1.50 jm disposed earth to be levelled and neatly dressed-All kind of soil

94.5

-

-

... More
2.8.1-Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kind of soil

75.601

-

-

... More
od1306/2018_2019 - JUNGLE STONE MASONRY_ Jungle stone without concrete levelling course masonry including packing to compactness to lines and levels cost and conveyance of all materials, labour charge etc. complete as per direction of departmental officers at site

197.101

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.