Soil Survey And Soil Conservation Department Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department - DSSC Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date12 Apr 2022
Closing Date29 Apr 2022
Tender Amount₹ 58,56,269 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
18.48 Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked,with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflowpipes but without fittings and the base support for tank.

62500

-

-

... More
23.6 Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit,over theexisting layer of boulders, in required thickness, for all leads & lifts, all complete as per direction ofEngineer -in-Charge- Gravel filling

15.9

-

-

... More
23.7 Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, inrequired thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer-in-charge-Sand filling

15.9

-

-

... More
od3307/2021_2022 Supplying and filling spreading and leveling charcoal in filter unit in required thickness - filling charcoal

7.95

-

-

... More
od2291/2021_2022 Supplying and laying PVC Wire mesh (Layer net ) in above and below of the charcoal layer

397.41

-

-

... More
od2292/2021_2022 Supplying and fixing PVC Gutter pipe 160mm (4kg/sq.m)including sssupply and fixing 160mm GI clampfor all leads and lifts as complete as per the direction of engineer -in- charge

2500

-

-

... More
od2293/2021_2022160 mm PVC Gutter stopper

250

-

-

... More
od2294/2021_2022160 mm PVC Gutter dropper

125

-

-

... More
od2295/2021_2022:Supplying and fixing 160mm PVC gutter bend (elbow) with dropper.for all leads and lifts complete as per the direction of engineer -in -charge

125

-

-

... More
od22960/2021_2022:Supplying and fixing 160mm PVC gutter bend (elbow) .for all leads and lifts complete as per the directionof engineer -in -charge

250

-

-

... More
50.18.9.18.2 Providing and fixing PVC pipes including fixing the pipe with clamps/Clips at 1.00 m spacing. Thisincluded jointing of pipes with one step PVC solvent cement and testing of joints complete as perdirection of Engineer-in-Charge 75 mm dia 4 Kfg/cm2 - External work - Exposed on wall- 75mm PVC pipe

1125

-

-

... More
50.18.9.8.2 Providing and fixing PVC pipes includings of pipes with one step PVC solvent cement, trenching andrefilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 4 Kgf/cm2

3750

-

-

... More
50.18.9.21.4 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVCsolvent cement - 75 mm dia Bend

1250

-

-

... More
50.18.9.21 Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes, including jointing with PVCsolvent cement - 75 mm dia Elbow

1000

-

-

... More
50.18.9.21.5 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVCsolvent cement -75x75x75 mm dia Tee

500

-

-

... More
50.18.9.21.10 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVCsolvent cement -75x63 mm dia Reducer

250

-

-

... More
od2297/2021_2022 Supplying and fixing 75 mm PVC control valve for all leads and lifts complete as per the direction ofEngineer -in- charge

250

-

-

... More
od2657/2021_2022 Providing and fixing PVC pipes included jointing of pipes with one step PVC solvent cement and testingof joints complete as per direction of engineer -in -charge 50mm dia 6kgf/cm2 external work for overflow

93.75

-

-

... More
od2299/2021_2022 Providing and fixing PVC moulded fittings/accessories for rigid PVC pipes including jointing with PVCsolvent cement- 75mm dia union tank connector

125

-

-

... More
od3376/2021_2022 Providing and fixing PVC moulded fittings / accessories for rigid PVC pipes including jointing with PVCsolvent cement 50mm union tank connector

125

-

-

... More
PERCOLATION TANK (3nos)

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavatedearth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds ofsoil

46.81

-

-

... More
2.26.1Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stackedmaterials.All kinds of soil

6.31

-

-

... More
OD2647/2021-2022 Laterite masonry with roughly dressed laterate stone of size 40x20x15cm or nearest size with dry jointsincluding all cost of materials, labour charges etc.

13.6

-

-

... More
50.6.7.1 Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cementmortar 1:6 for foundation and basement including all cost of materials, labour charges etc.

12.14

-

-

... More
13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

13.44

-

-

... More
Water harvesting structure ( Pond ) 10 x 10 x 4.5 m size 1 No.

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavatedearth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds ofsoil

353.22

-

-

... More
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

609.65

-

-

... More
51.2.3 Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade

13.3

-

-

... More
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

13.3

-

-

... More
od2655/2021_2022 Laterate masonry with roughly dressed laterate stone of size 40 X 20 X 15 cm withdry joints including all cost of materials,labour charges ete complete.

204.61

-

-

... More
50.6.7.1 Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.

6.85

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

2.76

-

-

... More
5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

10.13

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening,cutting,bending,placing in position and bending all complete up to plinth level . Thermo-Mechanically treated bars of grade Fe-500 D or more.

296.73

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

23.34

-

-

... More
13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)

72.64

-

-

... More
13.37.1 White washing with lime to give an even shade:New work (three or more coats)

72.64

-

-

... More
50.2.3.1 Pumping or bailing out water and removing slush ete by using pump set including cost of labour, oil hire charges of pump set ete complete.

96

-

-

... More
13.44.1 Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)

2

-

-

... More
13.71 Lettering with black Japan pint of approved brand and manufacture

1800

-

-

... More
10.25.2 Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

30.98

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.