Soil Survey And Soil Conservation Department Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department - DSSC Tender

Works
Civil And Construction
Eprocure
Opening Date19 Nov 2022
Closing Date28 Nov 2022
Tender Amount₹ 25,56,426 
Notes
Download

Costs

Summary

Construction Of Side Protection Wall, Retaining Wall And Rcc Foot Slab In Karingal Watershed (phase I) In Maranallur Panchayat In Kattakada Constituency Of Thiruvananthapuram District Under Development Of Micro Watersheds (jalasamridhi)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

40

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 20 mm nominal size)

8

-

-

... More
Side protection wall (RR masonry) in SC colony - 330m

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil

120.86

-

-

... More
60.7.1 DRY RUBBLE MASONRY - Dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per direction of departmental officers at site

66

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)

103.95

-

-

... More
13.1.2 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)

181.5

-

-

... More
Retaining wall Type A (1m ht) -120m

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil

80.4

-

-

... More
60.7.1 DRY RUBBLE MASONRY - Dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per direction of departmental officers at site

101.4

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

24

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 20 mm nominal size)

5.4

-

-

... More
Retaining wall Type B (1.20m ht) -15m

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil

13.95

-

-

... More
60.7.1 DRY RUBBLE MASONRY - Dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per direction of departmental officers at site

17.1

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

3

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 20 mm nominal size)

0.68

-

-

... More
Retaining wall TYPE C (1.50m ht) -60m

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil

70.5

-

-

... More
60.7.1 DRY RUBBLE MASONRY - Dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per direction of departmental officers at site

86.25

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

12

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 20 mm nominal size)

2.7

-

-

... More
RCC Foot slab - 1 No.

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil

11.75

-

-

... More
60.7.1 DRY RUBBLE MASONRY - Dry rubble without cocrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per direction of departmental officers at site

5

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)

9.75

-

-

... More
5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.54

-

-

... More
5.22.6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.

44.92

-

-

... More
5.9.3 Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors, roofs, landings, balconies and access platform

2.4

-

-

... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

1.26

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.