Soil Survey And Soil Conservation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Soil Survey And Soil Conservation Department - DSSC Tender
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date26 Sep 2023
Closing Date6 Oct 2023
Tender Amount₹ 17,89,677
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
Landslide Stabilisation Scheme Bhoodanam Phase I In Pothukal Panchayathof Malappuram District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DSSC_607155_1Bid Award Id
ViewTender No
pG(1)769/2023-LSSTender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
5.22.6Steel reinforcement for RCC work including straightening ,cutting, bending, placing in position and binding all complete up to plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
993.85
-
-
5.1.2 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering and shuttering, finishing, and reinforcement - All work up to plinth level:1:1.5:3 (1 cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size)
nominal size)
10.8
-
-
5.9.1Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns etc for mass concrete
43.2
-
-
CROSS CHECK
-
-
-
2.6.1. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of
soil
18
-
-
60.7.1 DRY RUBBLE MASONRY __ Dry rubble without concrete levelling course masonry with good quality
blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site
18
-
-
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations,
footings, bases for columns
9.6
-
-
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size)
3.6
-
-
STONE PITCHED GRADED BUND (SPGB)
-
-
-
OD227/2023-2024 Stone pitched graded bunding works with a grade of 0.2% to 0.3%using jungle stone , laterate,granite blasted rubble orany other locally available stone complete with quarrying of stones including filling of earth to the up hill portion soas toget a top width of45 cm with provision for drainingout the excess water from the bund as per dptl. rate
2000
-
-
AGROSTOLOGICAL MEASURES
-
-
-
OD224/2023-2024 Strengthening the structure by planting CO3 fodder grass etc. at an interval of 0.3 m as per departmental specifications on top of the newly constucted contour bund/ graded bund & Existing bunds etc.
2000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements