Soil Survey And Soil Conservation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,520Tender Fee
Refer Documents
Summary
Development Of Microwatersheds In Kuttiyadi Constituency Of Kozhikkode District- Tulattunada Watershed
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DSSC_605049_2Bid Award Id
ViewTender No
SSSC/1286/2023-PG1Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Preliminary Agreement and NIT
Technical Specifications Location and Sketches
BOQ Items
5.9.1- Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
308.2
-
-
5.22.6 -Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2737.35
-
-
5.1.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
77
-
-
50.2.3.1- Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
250
-
-
RCC FIELD CHANNEL and SIDE WALL FOR DIVERTING WATER TO
FIELD CHANNEL
-
-
-
2.6.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
874.95
-
-
OD478/2023-2024-Filling with Quarry Muck Filling up low lying and water logged areas with local material/quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade.
145.8
-
-
OD1319/2023-2024-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
23.4
-
-
4.3.1-Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
184.6
-
-
4.1.5-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
138
-
-
5.9.2-Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
1674.8
-
-
5.22.-6-Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7692
-
-
5.1.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
282.8
-
-
OD488/2023-2024 PVC WEEP HOLES-Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges
etc.complete.
4
-
-
50.18.9.21.8-Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75 mm dia End cap
10
-
-
OD 490/2023-2024,FRP Shutters-Supplying and fixing FRP CHANNELS of "C" profile and sill beam size 100x100x100mm with flange of 50 to 75mm depth in the grooves already arranged and asper the direction of departmental officers.
4.8
-
-
OD 491/2023-2024, FRP SHUTTERS -Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the
direction of departmental officers. Net Total 1.170sqm
1.17
-
-
2.25,Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
2.7
-
-
50.2.3.1,Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
300
-
-
FOOT SLAB-Top of RCC field channel
-
-
-
5.9.3,Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.16
-
-
5.22.6-Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
25.15
-
-
5.1.3-Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
0.59
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements