Soil Survey And Soil Conservation Department Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 24,510Document Cost
₹ 1,970Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_DSSC_481976_3Bid Award Id
ViewTender No
C(2)937/2021Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site - for foundation and superstructure
19.47
-
-
... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 up to plinth level with cement mortar 1:6
4.63
-
-
... More
13.1.1
12 mm cement plaster on the rough side of single or half brick wall of mix:1:4 ( 1 cement : 4 fine sand)
10.2
-
-
... More
60.1.2 RING BUND Type 2 Putting up ring bund as per approved shape 2.00 m bottom width 1m top width using earth fille gunny bags and filling inbetween with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc.
13
-
-
... More
50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pump set. complete .
8
-
-
... More
culvert 1 no
-
-
-
... More
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Side cutting and Foundation
44.71
-
-
... More
2.26.1
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked
materials.All kinds of soil -
37.21
-
-
... More
60.7.2
DRY RUBBLE PACKING _ Dry rubble packing under foundation- Dry stone packing under foundation with good quality blasted rubble including conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
16.92
-
-
... More
4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
6.23
-
-
... More
5.1.2 Providing and laying in possition specified grade of Reinforced cement concrete, Excluding the cost of centering, shuttering, finishing and Reinforcement- all work up to plinth level 1:1.5:3 (1 cement, 1.5 course sand, 3graded stone agreegate 20mm nominal size)
31.54
-
-
... More
4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, Footings, bases of colums etc
17.92
-
-
... More
5.9.2
Centering and shuttering including strutting, etc. and removal of form for:walls (any thickness), including attached pillasters, butresses, plinth and string courses etc
65.98
-
-
... More
5.9.3
Centering and shuttering including strutting, etc. and removal of form for suspented floors, roof landings, balconies and access platform
22.14
-
-
... More
5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
1865.33
-
-
... More
50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pump set. complete .
10
-
-
... More
Ramp 1 no
-
-
-
... More
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
11.55
-
-
... More
60.7.2
DRY RUBBLE PACKING _ Dry rubble packing under foundation- Dry stone packing under foundation with good quality blasted rubble including conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
11.55
-
-
... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 up to plinth level with cement mortar 1:6
15.9
-
-
... More
4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
2.2
-
-
... More
4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, Footings, bases of colums etc
1.9
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements