Soil Survey And Soil Conservation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 59,300Document Cost
₹ 4,130Tender Fee
Refer Documents
Summary
Construction Of Earthen Valley Dam At Channothukolli In Chamappara Micro Watershed
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_DSSC_385676_2Bid Award Id
ViewTender No
DW(3)1699/2019/EWD1Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
5.1.3- Providing & Laying in position Specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing & reinforcement - all work upto plinth level 1:2:4 ( 1cement:2Coarse sand: 4 Graded stone aggregate 20 mm nominal size)
11.95
-
-
5.22- Steel Reinforcement for RCC work including strenghtening, cutting, bending, placing in position and binding all complete
450.73
-
-
4.3.2 - Centering & Shuttering including Strutting, Propping etc. and removal of form work of Retaining walls, return walls (Any Thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
65.11
-
-
OD- Cut OFF Wall using in impervious sheet
80
-
-
14.24- Mud Mortar made with local clay good earth, core wall using stiff clay inside of earthen dam
63
-
-
2.3.1- Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd & top -most layer with power roller of minimum 8 tonnes and dressing up , embankments for roads, flood banks, marginal banks, and guide banks etc. lead upto 50 m and lift upto 1.50m. Note:- Contractors resposibility to arrange the required earth his own risk
1125.45
-
-
16.3.9- Supplying and Banking Good Earth
905.55
-
-
9.48- Providing & Fixing MS Grill of required Pattern in frames of windows ets with MS Flats, square or round bars etc. including priming coat with approvedsteel primer all complete. . 9.48.2 Fixed to openings / Wooden Frames with rawl plug.
64
-
-
19.6.10- Providing & Laying non-pressure NP2 class (light duty) RCC Pipes with Collars Joined with stiff Mixture of cement mortar 1:2 ( 1 Cement: 2 Fine Sand) including testing of joints etc complete.
144
-
-
60.7.4:- DR Packing - Rough Stone Dry Packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost & conveyances of all materials labour charges etc. Complete as per direction of Departmental Officers at site.
84.78
-
-
60.8- Supplying & Providing Vengai Wood Shutter Planks 5 cm Thick including cost of materials and labour charges etc complete for Spillway Shutter.
0.3
-
-
Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost
1
-
-
Construction of chamber for 100mm sluices valve
1
-
-
Construction of chamber for 100mm sluices valve
1
-
-
2.28.1- Providing & fixing Geo Textiles around the berm and Cross Wall. Surface dressing of the ground including removing Vegitation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.50 m
510
-
-