Soil Survey And Soil Conservation Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department - DSSC Tender

Works
Civil And Construction
Eprocure
Opening Date7 Sep 2023
Closing Date18 Sep 2023
Tender Amount₹ 43,58,754 
Notes
Download

Costs

Summary

Dlt Works In Muttil,meenangadi Panchayatin Wayanad ,kolembetta Manikuni Watershed

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
4.3.2-Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.

202

-

-

... More
CONCRETE RETAINING WALL (1.00 M height & 200m length) Left Side of KOLARAMBAM THODU

-

-

-

... More
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up

170

-

-

... More
4.1.6- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size)

150

-

-

... More
4.3.2-Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.

404

-

-

... More
RCC FARM POND 4M Ø (10 Nos)

-

-

-

... More
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up

600.72

-

-

... More
2.26.1 - Extra for every additional lift of 1.5m or part thereof in excavation / banking excavated or stacked materials. All kind of soil.

621.72

-

-

... More
5.1.2- Providing and laying in position specified grade of reinfoced cement concrete, excluding the cost of centering, shuttering, finishing and reiforcement - All work up to plinth level 1:1.5:3 ( 1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

106.27

-

-

... More
5.9.12 - Centering and shuttering including strutting etc and removal of form for well steining

1326.64

-

-

... More
5.22.6- Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more

2748.72

-

-

... More
OD 381/2023-2024 - Sinking of 4 m external diameter well (other than pneumatic method of sinking) through clayey soil, complete as per drawing and technical specifications, depth of sinking as reckoned from bed level, depth below bed level

41.5

-

-

... More
13.2.1 - 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (I cement: 4 fine sand)

9

-

-

... More
13.85.3 - Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content. With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre

9

-

-

... More
13.61.1 - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work

9

-

-

... More
13.71 - Lettering with black Japan paint of approved brand and manufacture.

8210

-

-

... More
50.2.3.1 - Pumping or bailing out water and removing slush etc. by using pumpset including cost of labour, oil hire charges of pumpse etc.

600

-

-

... More
RENNOVATION OF EXISTING SPRING WATER STORAGE ( 1No. )

-

-

-

... More
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up

2.24

-

-

... More
50.6.7.1 -Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.

3.64

-

-

... More
5.1.2- Providing and laying in position specified grade of reinfoced cement concrete, excluding the cost of centering, shuttering, finishing and reiforcement - All work up to plinth level 1:1.5:3 ( 1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

1.8

-

-

... More
5.22.6- Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more

104.6

-

-

... More
5.9.1 - Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete

2.72

-

-

... More
5.9.2 - Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

15.45

-

-

... More
4.1.3 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

0.69

-

-

... More
OD 382/2023-2024 -Fillinf with Quarry muck up low laying and water logged areas with local material/quarry muck,spreading in layers,levelling the top at site and consolidation by ramming etc. complete for improving the CBR value of subgrade.

2.01

-

-

... More
13.1.1 - 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand)

20.76

-

-

... More
13.85.3 - Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content. With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre

1.12

-

-

... More
13.61.1 - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work

1.12

-

-

... More
13.71 - Lettering with black Japan paint of approved brand and manufacture.

987.5

-

-

... More
50.2.3.1 - Pumping or bailing out water and removing slush etc. by using pumpset including cost of labour, oil hire charges of pumpse etc.

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.