Soil Survey And Soil Conservation Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department - DSSC Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date18 Oct 2024
Closing Date26 Oct 2024
Tender Amount₹ 12,35,532 
Notes
Download

Costs

Summary

Asray Colony Lss

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
OD727/2024-2025.Jungle stone masonry-Jungle stone without concrete levelling course masonry with locally available jungle stone including packing to compactness to lines and levels cost and levels, costand conveyance of all material labour charges etc.complete as per direction of departmental officers at site.

44.8

-

-

... More
4.3.1. Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

16

-

-

... More
4.1.3.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

22.4

-

-

... More
OD404/2024-2025. DRY RUBBLE MASONRY_ DRY rubble without concrete levelling course masonry with good quqlity blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.

138

-

-

... More
5.9.1.Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

16.2

-

-

... More
5.22.6. Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

175.02

-

-

... More
5.1.2.Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

4

-

-

... More
Diversion Channel Type A(1.2 m Height) 24 m

-

-

-

... More
2.6.1.Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

63.36

-

-

... More
2.26.1. Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

20.16

-

-

... More
OD729/2024-2025.Jungle stone masonry-Jungle stone without concrete levelling course masonry with locally available jungle stone including packing to compactness to lines and levels cost and levels, costand conveyance of all material labour charges etc.complete as per direction of departmental officers at site.

26.88

-

-

... More
4.3.1. Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

9.6

-

-

... More
4.1.3.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

13.44

-

-

... More
OD730/2024-2025. DRY RUBBLE MASONRY_ DRY rubble without concrete levelling course masonry with good quqlity blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.

37.44

-

-

... More
5.9.1.Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

9.8

-

-

... More
5.22.6. Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

104.15

-

-

... More
5.1.2.Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

2.4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.