Soil Survey And Soil Conservation Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 12,09,541 
Notes
Download

Costs

Summary

Puthenpurakkal-eyappattupady Land Slide Area Stabilization Scheme Phase 1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including strutting, propping etc. and removal of form work for foundation, footings bases of columns as per code number 4.3.1

51.84

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return wall, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets,kerbs and steps etc. as per code number 4.3.2

128.44

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works up to plinth level 1:2:4 as per code number 4.1.3

42.16

-

-

... More
D R Retaining wall 1m height - 130M

-

-

-

... More
Earth work in excavation by mechanically means (Hydrolic Excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm. On plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m disposed earth to be levelled and neatly dressed. All kinds of soil as per code number 2.6.1

83.85

-

-

... More
Rock anchoring - providing dowel bar of 12mm dia. Bars of 100cm long hooked at one end in 15 cm deep holes fixed with it cement grouting including cost and conveyance of steel, labour charges etc. complete as per code number OD55/2024-2025

260

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for foundation, footings bases of columns as per code number 4.3.1

78.96

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works up to plinth level 1:2:4 as per code number 4.1.3

31.2

-

-

... More
Dry Rubble without Concrete levelling courses masonry with good quality blased rubble including packing to compactness to lines and levells cost and conveyane of all materials labour chargse etc. complete as per the direction of departmental officers at site as per code number OD59/2024-2025

71.5

-

-

... More
Centering and shuttering including strutting, etc. and removal of form work for foundation, footings bases of columns etc. for mass concrete as per code number 5.9.1

26.2

-

-

... More
Steel reinforcement for r.c.c. work including straitining, cutting, bending, placing in position and binding all complete up to plinth level Termo - Mechanically treated bars of grade Fe-500D or more as per code number 5.22.6

231.43

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishind and reinforcement - all works up to plinth level 1:1.5:3 as per code number 5.1.2

6.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.