Soil Survey And Soil Conservation Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 37,712Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DSSC_727533_1Bid Award Id
ViewTender No
DSCO/ALP/118/2023-C4Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2.26.1
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.
All kinds of soil
353.32
-
-
... More
2.18.1 Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):
Depth not exceeding 1.5 m
112.65
-
-
... More
OD1881/2023-24 DRY RUBBLE MASONRY DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
217.53
-
-
... More
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:
Foundations, footings, bases of columns, etc for mass concrete
14.95
-
-
... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo - Mechanically Treated bars of grade Fe-500D or more
774.03
-
-
... More
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:
1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
8.68
-
-
... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:
Cement mortar 1:6 (1 cement : 6 coarse sand)
11.32
-
-
... More
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns
23
-
-
... More
10.26.3 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.
G.I. pipes
1213.05
-
-
... More
13.52.1 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
On steel work
41.36
-
-
... More
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
42.24
-
-
... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.88
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements