Smart City Thiruvananthapuram Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Smart City Thiruvananthapuram Limited Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Dec 2023
Closing Date6 Jan 2024
Tender Amount₹ 2,19,26,153
Costs
EMD
₹ 1,00,000Document Cost
₹ 9,757Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SCTLT_627820_1Bid Award Id
ViewTender No
SCTL/PRJ/210/2019/M(PMM)/RFP- 49Tender Authority
Smart City Thiruvananthapuram Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - In cement mortar
50
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
300
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Ordinary soil - Mechanical Means - (Depth upto 3 m)
175
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
100
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications
RCC Grade M20 - Using Concrete Mixer
270
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications
RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
130
-
-
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
40
-
-
Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
15
-
-
Based on MORTH Item No.2.4.2.A - Extra for additional lead of every 1 Km part thereof for disposal of dismantled waste material by mechanical transport to approved municipal waste dumping yard,as per the direction of Engineer In-charge
375
-
-
Providing and fixing heavy duty DI grating with frame of size 450mm x 300mm for road gully chamber having minimum 30Kg weight with hinges etc. complete as per design & drawings.
108
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
36
-
-
Taking out of existing drain slab and stacking within 1000m lead including all labour charges and miscellaneous expenses etc complete
200
-
-
Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately :Rectangular manhole 120x90 cm with circular cover 560 mm dia of grade HD - 20
25
-
-
Providing, hoisting and fixing up to floor level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone -III) : 3 graded stone aggregate 20 mm nominal size)
21.6
-
-
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2160
-
-
Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap.
20
-
-
Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 100 to 250 mm diameter
50
-
-
PART B - PIPE DUCT
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
310
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Ordinary soil - Mechanical Means - (Depth upto 3 m)
610
-
-
Providing of 7- Way 40mm Multi Ducts with solid permanently solidly lubricated Silicore in inner layer for ICT fibre cables comforming to ASTMF 2160, ASTM D 2444 and /or equivalent indian standard. External Sheath shall be in Orange Color and shall be free from visual defects like blisters, shrink holes, flaking, scratches, groove lines & surface roughness. The outer layer colour of the 7 nos. PLB HDPE ducts shall be Green, blue, yellow, Brown, violet, Grey , Red for differentiation, middle layer shall be transluscent and the inner layer shall be having permanently lubricated lining of Silicore . Outer sheath thickness shall be 1.2mm 0.2mm. The inner surface of the multi channel ducts shall be straight ribbed & shall be of a configuration for faster installation of cables. Wall thickness(mm) of each of the ducts Excluding rib height shall be 2.9mm 0.3mm. Seven couplers every 100 meter for duct jointing shall be provided. The coupler shall be used to join two HDPE pipes. It should either snap fit or Split type. The jointing shall meet the air pressure test of 15 Kg/cm2 for a minimum period of 2 hours. 14 End Plugs every 100 meters of pipe length shall be provided. End Plugs shall be used to seal the end of ducts so as to prevent any ingress of water/dirt etc. testing and commissioning. The rate is inclusive of required specials and fittings wherever necessary. ISO Requirements- ISO 9001, 14001, 18001 as per design drawing technical specifications and directions of Engineer in charge
1500
-
-
Supplying and laying of following size owe HOPE pipe .lSI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.120 mm dia (OD-120 mm & ID-103 mm nominal)
3700
-
-
Supplyof following size HDPE pipe ISI marked along with accessories like socket, bend, couplers etc. 60mm dia
607
-
-
Laying of 60 mm HDPE pipe in already excavated Trench as per the direction of engineer in charge.
607
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
15
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 - Using Concrete Mixer
80
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications
RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump
20
-
-
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
10
-
-
Based on D.S.R-19.19.4.1-Supplying and fixing SFRC Circular shape 560 mm dia precast R.C.C. manhole cover(Extra Heavy Duty) with frame - EHD - 35 to existing manhole cover slab including necessary fixing charges labour etc. complete.br
22
-
-
PART C - ROAD WORK
-
-
-
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
730
-
-
Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
410
-
-
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
410
-
-
Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
2800
-
-
Dense Graded Bituminous Macadam : - For grading - II (26.5 mm nominal size) Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
130
-
-
Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5500
-
-
Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading -II (13.2 mm Nominal size).
65
-
-
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
150
-
-
Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :
140
-
-
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
372
-
-
Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
450
-
-
Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately.
60
-
-
PART D - FOOTPATH
-
-
-
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
1200
-
-
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
480
-
-
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).
Ordinary cement without any pigment
300
-
-
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement
300
-
-
Drain cleaning using scavengers for existing drain including removal of all deposited silt and conveying the removed earth to dumping site.(In CuM)
50
-
-
Providing and laying tactile tile (for vision impaired persons as per standards) of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-inCharge.
150
-
-
Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
1
-
-
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm circular
2
-
-
Dismantling of existing signages in footpath/median including excavation and dismantling of foundation concrete, disposal with all lifts and up to a lead of 1000 meters and staking the materials.
4
-
-
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
4
-
-
PART E - STREET LIGHT AND FEEDER PILLAR
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
40
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 - Using Concrete Mixer
38
-
-
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.8
-
-
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
3
-
-
Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
10
-
-
WATER SUPPLY WORKS
-
-
-
Supply of PVC Pipe, 8kg/cm2, 90mm Dia conforming to IS 4985:2000 Including all Specials.(KWA Data-100.98.223)
55
-
-
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).90 mm nominal outer dia pipes."
55
-
-
Supply of PVC Pipe, 8kg/cm2, 110mm Dia Including all specials, conforming to IS 4985:2000.(KWA Data-100.98.224)br
1165
-
-
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).110 mm nominal outer dia pipes.(From KWA Data-100.9.11)
1220
-
-
Supply of PVC Pipe, 6kg/cm2, 160mm Dia Including all specials, conforming to IS 4985:2000.(KWA DSR-100.98.216)br
10
-
-
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).160 mm nominal outer dia pipes.(From KWA Data-100.9.11)
35
-
-
Boring RCC slab above 8cm and upto 10cm thick for providing pipes or fittings of size 80 to 100mm and rectifying slab with cement concrete 1:2:4 using 20mm broken stone and finishing the top and bottom with cement mortar after placing the pipe or fittings.brNEW DATA (Prepared based onbrPHED SDB Vol II - Item No.1063)(As per KWA Data 100.41.26)
14
-
-
Inter connection with existing DI K9/CI/GI/PVC to newly laid lines including dismantling existing lines,cost of necessary fittings required for interconnection work,all labour charges etc complete.(As per data from KWA).
2
-
-
Inter connection to the branch lines from newly laid PVC main lines
5
-
-
Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.(KWA Data-100.98.457)
4
-
-
"Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber etc. excluding the cost of valve (the tail pieces if required will be paid separately) :80 mm diameter. Class I"Observed Data derived from item no.18.31.of DAR(KWA Data-100.31.1.1)
4
-
-
Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.6, Size 100mm.(As per KWA Data-100.98.482).
2
-
-
Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber etc. excluding the cost of valve (the tail pieces if required will be paid separately) :100 mm diameter. Class IbrData derived from item no.18.31.1.1of DAR(As per KWA Data-100.31.1.2)
2
-
-
Supply of 560mm dia CI MH cover with frame.(Data as per KWA)
6
-
-
Fabricating MS flanges of diameter 100 mm using 12 mm thick MS plate including cost and conveyance charges of MS plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under coat of primer etc. complete: For pipes fabricated with 8mm thick MS plates.(Data as per KWA Data-100.37.5.2)
8
-
-
Fabricating MS pipes of size 100mm (ID) using 8 mm thick MS plate including cost and conveyance charges of MS plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under coat of primer etc. complete: For pipes fabricated with 8mm thick MS plates.(as per KWA Data-100.37.5.1).
12
-
-
Supply of Solid block of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979.
0.3
-
-
Engaging Coolie for Controlling Valves (From KWA Data-100.98.1008)
15
-
-
Engaging Assistant Fitter or 2nd Class fitter(As per KWA Data-100.98.1010).
20
-
-
Engaging Fitter ( grade 1) for giving Interconnection and Rectification of leak during Works (From KWA Data-100.98.1009)
15
-
-
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).br20 mm nominal outer dia pipes.(As per KWA Data-100.9.1)
2184
-
-
Providing New/Alteration of house connection from the existing main including earth work excavation,supplying and fitting suitable saddle piece,supplying and fitting 20 mm brass ferrule1 no,20 mm GM full way wheel valve 1no,bend 1no union 1no etc. and connecting the newly laid main,testing the joints etc complete but excluding cost of pipe.(Data as per the data from KWA).
367
-
-
Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.(KWA Data-100.51.3).
5
-
-
od250528/2019_2020
Supply and Conveying 20mm ASTM Pipe, conforming to IS 4985:2000(Rate as per date from KWA).
2184
-
-
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not
exceeding 300 mm dia
786
-
-
Bailing out water with 5 HP engine and pumpset including conveyance to the site, errection, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc. complete.
NEW DATA (Prepared based on PHED SDB - Item No.1070
125
-
-
Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.59.1
20
-
-
Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:
Bituminous road
15.43.2
6
-
-
Operation and Maintenance Cost
-
-
-
Maintenance charges of road work and other components except land scaping per month for fourth year
12
-
-
Maintenance charges of road work and other components except land scaping per month for fifth year
12
-
-