Rehabilitation Plantation Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 37,200Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
Rpl/punalur/repair And Maintenance Of Culvert Near 2h Collecting Station In Kulathupuzha Estate
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RPL_482744_1Bid Award Id
ViewTender No
RPL/D/2705/2022Tender Authority
Rehabilitation Plantation Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Declaration to be signed and up-loaded by the bidder
BOQ Items
Dry rubble masonry including labour, cost and conveyance of all materials, scaffolding etc complete for foundation bed.
40.82
-
3557.16
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works up to plinth level for 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) - for abutments
48.13
-
8011.15
Centering & shuttering including strutting, propping etc., and removal of form for bed slab etc
16.92
-
341.62
Centering & shuttering including strutting, propping etc., and removal of form for abutment etc
124.48
-
879.88
Centering & shuttering including strutting, propping etc., and removal of form for deck slab etc
32.49
-
831.12
Reinforcement for reinforced cement concrete works bent, tied and placed in position including cost of binding wire, scaffolding, labour etc complete.
3415
-
100.15
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:11/2:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size - for deck slab
8.75
-
9256
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)
36
-
7340.28
Plastering with cement mortar 1:4, 12mm including cost and conveyance of all materials labour, scaffolding, curing…etc. complete for septic tank
15.4
-
320
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
61
-
263.43
Filling with quarry muck - Filling up low lying and water logged areas with local material/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming etc. complete for improving the CBR value of subgrade.
12
-
902.92
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements