Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Oct 2024
Closing Date6 Nov 2024
Tender Amount₹ 67,79,202
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
General-rm 2024-25-rc 2 Phase 2-cluster Ii One Year Rc Thiruvalla Section Pathanamthitta Rm 2024-25 -zone4 - One Year Running Contract For Various Pwd Roads Under Roads Section Thiruvalla In Pathanamthitta District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_700882_1Bid Award Id
ViewTender No
PWD/RB/TR/11155/2024_5_1_1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
23.44
-
-
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
4.89
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
6
-
-
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
40
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
13155
-
-
OD68345/2024-2025:Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
13155
-
-
Appendix-B- Pre-monsoon works
-
-
-
OD68327/2024-2025:Engaging man mazdoor for clearing chocked culvert, clearing vegetation, removing the RCC slab and cleaning drain etc.
36
-
-
OD68328/2024-2025:Engaging JCB for removal of wastage, eviction purpose etc.
80
-
-
OD68329/2024-2025:Engaging tipper for conveying wastag
10
-
-
OD68330/2024-2025:Engaging concrete cutting machine for removing concrete structure and unauthorized constructions.
5
-
-
OD68331/2024-2025:Engaging wood cutter for cutting trees and branches standing in dangerous condition
15
-
-
OD68332/2024-2025:Hire charge for machine saw including petrol charge
15
-
-
OD68333/2024-2025:Engaging Man mazdoor for assisting wood cutter and removing branches of trees, Cutting in shape for keeping road side with out hindrance to the traffic as per the direction of deptl. officers at site.
22
-
-
OD68334/2024-2025:Hire Charges of rope for cutting trees standing in dangerous condition.
12
-
-
OD68335/2024-2025:Engaging Auto pickup for filling up of pot holes using shelmac
15
-
-
OD68336/2024-2025:Engaging Man mazdoor for filling up of pot holes using shelmac
45
-
-
OD68337/2024-2025:Supplying and stacking Shelmac or equivalent ready mix 25 Kg (1 Bag ) cold mix bags an instant pothole filling mixture from authorizes agencies as per indents, including conveying and unloading, all charges for spreading and ramming etc and as per instruction of the Departmental officers including all incidental charges etc complete.
2500
-
-
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
1.34
-
-
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
100
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
3.75
-
-
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
3.75
-
-
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
6
-
-
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
0.36
-
-
OD68338/2024-2025:Random Rubble Masonry (Coursed/uncoursed in Cement mortar 1:6 including all cost, conveyance etc complete as per approved drawing and direction of departmental officers in charge
4.2
-
-
OD68339/2024-2025:Dry Rubble masonry for foundation and super structure of retaining wall including all cost as per design and drawings.
3.6
-
-
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
10
-
-
Appendix-C-Proactive/Preventive Maintenance
-
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
10.65
-
-
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
4.01
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10.65
-
-
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
4.09
-
-
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
13.5
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
13.5
-
-
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
90
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
7110
-
-
OD68340/2024-2025:Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
7110
-
-
OD68341/2024-2025:Engaging labour with passenger car not less than 1000 cc for Conducting and reporting routine inspection for 20 KM for the entire length of project road at a frequency of 7 days throughout the agreement period of Running contract as directed by the Departmental officers.
79.34
-
-
OD68344/2024-2025:Providing and fixing of DLP board for Running contract work with Non-retro-reflectorized vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminum sheeting 2 mm thick/ aluminum composite material sheeting 4 mm thick with area not exceeding 0.9 sqm ,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45*45*60 cm , 60 cm below ground level including painting all exposed surface with 2coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
11.52
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements