Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date20 Jul 2024
Closing DateCancelled
Tender Amount₹ 5,54,529
Costs
EMD
₹ 13,863Document Cost
₹ 1,225Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_681402_1Bid Award Id
ViewTender No
E22/PWD/BLDG/TR/9901/2024 5 1 1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
0.22
-
-
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
0.72
-
-
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
43.6
-
-
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
1.41
-
-
OD52007/2024-2025:Providing and installation of the sculpture of Late Sri. K R Narayanan former President of India, of 3.5 feet height, including art work, moulding expenses, foundation work of 4 feet height and 2.5 feet length and width, bronze plate fixing for engraving history etc, including all labour and material charges etc complete as per the direction of engineer in charge.
1
-
-
OD52012/2024-2025:Providing and fixing Random rubble stone post of size 4x4 inch, 5 feet height with ornamental crafting, provision for fixing the metal chain including all labour and material charges etc complete as per the direction of engineer in charge.
1
-
-
OD52118/2024-2025:(Ref: DSR11.23) Marble stone laying with 18 mm thick marble stone as per sample of marble approved by Engineer-in-Charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid including rubbing and polishing and filling the gap between tiles with natural ornamental grass complete with:Raj Nagar plain
27
-
-
OD52133/2024-2025:Labour engaged for cleaning the premises and other petty works.
6
-
-
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
3.46
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements