Public Works Department Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 84,73,905
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_680224_1Bid Award Id
ViewTender No
TR/1875/2023_5_1_1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
7.87
-
-
... More
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
3.22
-
-
... More
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
301
-
-
... More
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
35.75
-
-
... More
6.1:Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
261.25
-
-
... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
357.5
-
-
... More
OD278629/2022-2023:Providing, laying and rolling of open graded premix carpet of 40 mm thickness over the existing black topped surface with departmental broken stone after thoroughly cleaning the existing surface wire brush, bass brooms and applying a tack coat of bitumen 2.50kg/10m2 and spreading the hot premix (formed of 0.32 m3 24 mm broken stone 0.22m3 12 mm broken stone and 22.08kg of bitumen/10m2) to template rolling to dense compact surface, then spreading the seal coat (comprising of hot premix of 0.09m3 of 6 mm broken stone and 8.64kg of bitumen per 10m2) rolling again to smooth to finish including cost of bitumen oils and fuels,hire for roller, boiler, sprayer and brushes, lighting and watching etc complete. (Total usage of bitumen 33.22kg/10m2)
357.5
-
-
... More
15.9:Construction of dry rubble flooring at cross drainage works for relatively less important works.
60
-
-
... More
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
22.5
-
-
... More
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
263.78
-
-
... More
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
25.06
-
-
... More
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
0.08
-
-
... More
Maintenance
-
-
-
... More
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
40.13
-
-
... More
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
12.38
-
-
... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
6
-
-
... More
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
3
-
-
... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
7.3
-
-
... More
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
110
-
-
... More
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
16.5
-
-
... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
110
-
-
... More
55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
1375
-
-
... More
Road Formation
-
-
-
... More
16.1:Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
3370
-
-
... More
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
162
-
-