Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 16,521Document Cost
₹ 1,460Tender Fee
Refer Documents
Summary
General-rcii Phase -1/ 2023-24/clusterii/one Year Rc/mavelikara Section / Zone I-one Year Running Contract For Various Pwdroads Under Road Section Mavelikara Inalappuzha District - 5 Roads Stretches For Aength Of 12.415 Km
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_651675_1Tender No
PWD/RB/TR/13229/2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://keralapwd.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Estimate for Running Contract work has prepared for five roads in zone-1 roads under mavelikara roads section. Estimate has included 3 appendixs name
BOQ Items
... More
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
405
-
-
... More
OD85876/2023-2024:Filling up potholes with bituminous ready mix compound (25 kg bag) and compacting and ramming to get a compact surface including cost of materials, laying charges and transportation to the site etc complete. (The rate is arrived for a bag of 25 Kg)
25
-
-
... More
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>
6
-
-
... More
OD87670/2023-2024:Laying serviceable tiles obtained from dismantling the existing interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
60
-
-
... More
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
1.55
-
-
... More
55.38a:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on Structural Steel c section vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of structural steel c section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3.
25
-
-
... More
Premonsoon works zone 1
-
-
-
... More
OD84025/2023-2024:Engaging Earth Movers Like JCB for cutting excess earth ,Loading silt other waste in Tipper Lorry
15
-
-
... More
OD84026/2023-2024:Engaging Tipper of 5.5 cum capacity for conveying cutdown trees for stacking
15
-
-
... More
OD84028/2023-2024:Engaging man mazdoor for removing raised berms and cutting earthen drain
18
-
-
... More
OD84029/2023-2024:Engaging wood cutter for cutting branches of trees standing dangerously
35
-
-
... More
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
450
-
-
... More
2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm
15
-
-
... More
OD84030/2023-2024:Engaging man mazdoor for clearing the culvert bed,berm etc
15
-
-
... More
2.3.1.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means
0.4
-
-
... More
Preventive maintenance works - Zone 1
-
-
-
... More
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
80
-
-
... More
OD84024/2023-2024:Conducting and reporting Routine Inspections for the entire length of the project Road frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officers at site
37.25
-
-
... More
OD225191/2023-2024:Removing the old existing vinyl sticker works on the display board of RC and replacing with new one including lettering, symbols and transporting to site etc
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements