Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 44,434Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
General Rc1 2024 25 Cluster 1 One Year Running Contract For Various Pwd Roads Under Roads Section Nileshwaram In Kasaragod District 8 Roads Stretches For A Length Of 29.14 Km General Civil Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_727774_1Tender No
D3/TN/4/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
63.24
-
-
... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
1.65
-
-
... More
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
1.99
-
-
... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
1.65
-
-
... More
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
1.99
-
-
... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
421.6
-
-
... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
3273.4
-
-
... More
OD102548/2024-2025:Providing laying and rolling of close ,graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm (Type A) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course in a previous prepared base , including mixing in a suitable plant ,laying and rolling with a three wheel 8-10KN static roller and finishing to required level and grades as per technical specification clause 509 of MORD
3273.4
-
-
... More
Appendix B : Pre-monsoon works
-
-
-
... More
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>
5.77
-
-
... More
OD102554/2024-2025:Engaging Mazdoor whenever requires for the removal of earth and other debris causing chocking of culverts and drain as per the direction of Engineer in charge
121
-
-
... More
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
250
-
-
... More
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
255
-
-
... More
Appendix C : Proactive/ Preventive works
-
-
-
... More
OD102549/2024-2025:Pothole filling during monsoon using cold ready mix bituminous compound (Adequacy 25Kg (1 bag)/1sqm of pothole) including all charges for spreading,ramming and conveyance expenses etc complete including all incidental charges.
18.29
-
-
... More
OD102550/2024-2025:Removal of existing vinyl sticker on DLP Board for running contract work and refixing with new non-retro reflectorized vinyl sticker with one years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting as per the contract details.
16
-
-
... More
OD102551/2024-2025:Engaging labour with passenger car not less than 1000cc for conducting and reporting routine inspection for 20km for the entire length of project
1515.28
-
-
... More
OD102552/2024-2025:Engaging mazdoor for cutting branches of trees leaned towards the road threatening to pedestrians and traffic and removel of fallen trees or branches on the road and clearing traffic blockage,stacking the wood at a suitable place as directed by the engineer in chage.
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%