Public Works Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Mar 2024
Closing Date23 Mar 2024
Tender Amount₹ 82,93,827 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.

26.23

-

-

... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

69.99

-

-

... More
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.

19.5

-

-

... More
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.

11.3

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

17290.63

-

-

... More
OD256617/2023-2024:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.

17290.63

-

-

... More
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material

33.66

-

-

... More
OD81696/2023-2024:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contractors directed by the departmental officer at site.

676

-

-

... More
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

209.88

-

-

... More
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.

72

-

-

... More
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.

105

-

-

... More
OD256621/2023-2024:filling with granular material in the areas where the soil is of slushy in nature to achieve3 adequate bearing capacity and as drainage layer laid in line and ;level compacted with plate vibrator etc. complete as per technical specification and as directed by the engineer in charge

0.9

-

-

... More
OD256624/2023-2024:Filling up Low laying areas with quarry muck, spreading in layers , levelling top at site and consolidating with ramming etc. complete

31.5

-

-

... More
OD256626/2023-2024:Removing old existing vinyl sticker works on the display Board of Running contract and replacing with new Vinyl sticker including lettering , symbols and transporting to the site etc as per approved drawing and directions of engineer

1.44

-

-

... More
Appendix B- Preventive Maintenance

-

-

-

... More
5.11.b:Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion (SS) and water on a road surface including cleaning of the surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface. Type - II - (4 6 mm thickness) Filling of surface cracks 1 - 3 mm and preventive / renewal treatments.

9.6

-

-

... More
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.

60

-

-

... More
OD81695/2023-2024:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg

100

-

-

... More
Appendix C - Pre-monsoon Works

-

-

-

... More
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.

10285

-

-

... More
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor

10010

-

-

... More
OD256632/2023-2024:Dry rubble masonry with departmental stone , without concrete levelling course masonry including packing to compactness to lines and levels, complete as per direction of departmental officers at site (derived from 60.71 labour charges only)

2.16

-

-

... More
OD257154/2023-2024:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site (derived from 60.7.1)

2.16

-

-

... More
OD81691/2023-2024:Engaging Man mazdoor wherever required

40

-

-

... More
OD256630/2023-2024:Engaging Tipper

128

-

-

... More
3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.

1003.2

-

-

... More
OD256628/2023-2024:Cutting of grass and light jungle using brush cutter with all expenses.

1000

-

-

... More
OD81694/2023-2024:Engaging JCB (Hydraulic Excavator) for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriageway and clearing the road surface for traffic worthy etc complete

96

-

-

... More
OD256631/2023-2024:Engaging wood cutter with tools and accessories required for cutting trees branches of trees of any girth overhanging above any structures including stacking of serviceable material and disposal of unserviceable material without making any damages to near by structures etc. complete.

30

-

-

... More
OD81692/2023-2024:Engaging Special Mazdoor for cutting and removing fallen trees and standing treses including all charges etc.complete

25

-

-

... More
OD256629/2023-2024:PVC weep holes-Providing weep holes using 75 mm dia PVC pipes working pressure 4Kg/sq.cm i8ncluding cost of materials conveyance, labour charges etc. complete (derived from 60.6)

30

-

-

... More
OD256634/2023-2024:Pumping or Bailing out water and removing slush etc. by using pump set including cost of labour, oil, hire charges of pumpset etc. complete.

8

-

-

... More
Appendix D- Proactive Maintenance with Emergency Works

-

-

-

... More
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side

10

-

-

... More
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method

18.75

-

-

... More
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

18.75

-

-

... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.

125

-

-

... More
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)

155

-

-

... More
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

68.25

-

-

... More
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15

31.85

-

-

... More
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer

8.25

-

-

... More
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)

20

-

-

... More
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications

0.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.