Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 40,500Document Cost
₹ 2,950Tender Fee
Refer Documents
Summary
Krfb Investigation Work For Providing Bm Bc To Kakkavayal Kolavayal Karyambadi Kenchira Pulpally Road From Arimula School To Manalvayach 7-500 To 16-100) In Wayanad District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_678772_1Bid Award Id
ViewTender No
D4/Tender-03/INV/KKD/2024- 25 Dated 02/07/2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD-Soil Collection & Testing- CBR- Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade offormation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
18
-
-
OD-Conducting Soil Classification test, Modified Proctor Test,and CBR test as per the ISCode guidelines and making report of one soil sample
18
-
-
OD-Conducting one test consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test
data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81- 1997) and submitting in hard and soft copy.
8.6
-
-
OD-Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials
as directed by the departmental officers at site and reporting the pavement composition
with photographs and measurements specifying the type of layers
18
-
-
OD-Detailed topographic survey using Total station/mobile Lider and preperation of site plan of minimum of 15m on either side of the centre line and taking cross section details
at 25m intervals on straight roads and 10m interval on curves ( survey includes details
of all features as mention in the scope of the in plane terrain work within the limit of
the survery). The survey shall be include establishing DGPS control points at starting
and ending of the project in pairs and at 4 KM intervels (in pairs) in plane and rolling
terrain and 2.5 Km intervels (in pairs) in hilly terrains.IT shall also include establishing
inter visible traverse control points not more than 250m apart with accuracy of at least
1:10000 and desirable 1:20000 in distance measurement. Elevation of each other
control points connected to MSL of GPS Bench Mark using precision levelling.
Seperate bench marks need not be established. Including taking sufficient colour copy
prints.(5 Nos)
43.4
-
-
OD- Establishing DGPS control points onTOR steel bar of 10 mm dia fixed in RCC pillar of size 20X20X70cm embeddded in concrete M15 up to a depth of 40 cm and the balancce 30 cm above the ground shall be painted yellow
6
-
-
OD- Establishing traverse control points with elevations on pillar of size 15cmX15cmX60cm M20 grade RCC pillar with a nail fixed on the top surface. The pillars shall be embedded in the concrete.Spacing 250 M apart as a bench mark - control pillar. The spacing shall be maximum 250 m apart and intervisible. No seperate bench mark need to be established.
35
-
-
Data for inventory survey upto 12 meter wide road for survey work
of collecting road inventories and recording in prescribed format attached based on
chainage marking including marking chainage at 50m interval and taking details such as
existing carriageway width,shoulder width, Type of shoulder ,width and location of
approach road ,details of existing drains,culverts and bridges as given in the format
attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge
damage etc)raod safety measures (details of road sign,crash barriers,guard
stones,delineator post, hazard markers etc) and all other existing retaining structures in
road,including documentation charges etc as per direction of the officers at site
9
-
-
56.1.a -Mobilization including transportation of all necessary plant and equipments and
materials of boring, field testing and sampling and demobilization after completing the
work - For machine boring
1
-
-
56.17.1 Providing access to the site, clearing site and making good for erecting and conducting soil testing transfers within the site and for any other temporary arrangenents to be erected within the area in connection with conducting soil testing
128
-
-
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant,
equipment and materials of boring and field tests and collection of samples at each
bore hole location - For machine boring.
8
-
-
56.3.a.1 Boring with rotary power drilling equipments in - all types of soil having N
value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m
including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m
intervals - For ordinary soil.- In land
60
-
-
56.3.a.2 Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals. For under water.
20
-
-
56.3.b.1 Boring with rotary power drilling equipments in - all types of soil having N
value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m
and upto a depth of 20m including conducting necessary S.P.T and recovery of
undisturbed soil samples at 5m intervals - For ordinary soil.
60
-
-
56.3.b.2 Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
20
-
-
56.3.c.1 Boring with rotary power drilling equipment in - all types of soil having N
value less than 50 excluding hard rock, soft rock or medium rock for strata next 20m
and upto a depth of 30m including conducting necessary S.P.T and recovery of
undisturbed soil samples at 5m intervals - For ordinary soil.
30
-
-
56.3.c.2 Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next20m upto 30m depth. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.-For under water.
20
-
-
56.3.d.2 Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals. For under water. 5
20
-
-
56.9.1 Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required) 5
60
-
-
56.10 Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc
8
-
-
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
48
-
-
56.5.b Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit In water
22
-
-
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50
using diamond core drilling bit for in land under water and banks of river.
12
-
-
56.7 Conducting standard penetration test in bore hole at any depth.
146
-
-
56.8 Recovering disturbed samples and preserving the same in air tight sample containers
including waxing labelling packing storing including cost of containers as per IS Code.
208
-
-
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm
length internal dia 500mm length conforming to relevant IS Code at any required
depth including clearing the bore hole etc complete.
80
-
-
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (reports in triplicate)
1
-
-
56.11.c Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) Additional set for machine boring(extra for bore holes exceeding 5 nos)
2
-
-
56.14.a Hydraulic(Report MFL,OFL,LWL,HTL,LTL) and velocity calculation of water body -River
1
-
-
56.15.a Cross Sectional details (longitudinal section along alignment of the Bridge
showing bed profile of the stream) -River
200
-
-