Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date12 Aug 2024
Closing Date17 Aug 2024
Tender Amount₹ 8,23,733 
Notes
Download

Costs

Summary

Kiifb-hill Highway-investigation Work For Mananthavady- Kalpetta Road From Ch.19/500 To 24/600 In Wayanad District

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
OD-Soil Collection & Testing- CBR- Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade offormation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.

12

-

-

... More
OD-Conducting Soil Classification test, Modified Proctor Test,and CBR test as per the ISCode guidelines and making report of one soil sample

12

-

-

... More
OD-Conducting one test consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81- 1997) and submitting in hard and soft copy.

5.1

-

-

... More
OD-Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers

12

-

-

... More
OD-Detailed topographic survey using Total station/mobile Lider and preperation of site plan of minimum of 15m on either side of the centre line and taking cross section details at 25m intervals on straight roads and 10m interval on curves ( survey includes details of all features as mention in the scope of the in plane terrain work within the limit of the survery). The survey shall be include establishing DGPS control points at starting and ending of the project in pairs and at 4 KM intervels (in pairs) in plane and rolling terrain and 2.5 Km intervels (in pairs) in hilly terrains.IT shall also include establishing inter visible traverse control points not more than 250m apart with accuracy of at least 1:10000 and desirable 1:20000 in distance measurement. Elevation of each other control points connected to MSL of GPS Bench Mark using precision levelling. Seperate bench marks need not be established. Including taking sufficient colour copy prints.(5 Nos)

25.2

-

-

... More
OD- Establishing DGPS control points onTOR steel bar of 10 mm dia fixed in RCC pillar of size 20X20X70cm embeddded in concrete M15 up to a depth of 40 cm and the balancce 30 cm above the ground shall be painted yellow

5

-

-

... More
OD- Establishing traverse control points with elevations on pillar of size 15cmX15cmX60cm M20 grade RCC pillar with a nail fixed on the top surface. The pillars shall be embedded in the concrete.Spacing 250 M apart as a bench mark - control pillar. The spacing shall be maximum 250 m apart and intervisible. No seperate bench mark need to be established.

21

-

-

... More
Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriageway width,shoulder width, Type of shoulder ,width and location of approach road ,details of existing drains,culverts and bridges as given in the format attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge damage etc)raod safety measures (details of road sign,crash barriers,guard stones,delineator post, hazard markers etc) and all other existing retaining structures in road,including documentation charges etc as per direction of the officers at site

5.1

-

-

... More
56.1.a -Mobilization including transportation of all necessary plant and equipments and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring

1

-

-

... More
56.17.1 Providing access to the site, clearing site and making good for erecting and conducting soil testing transfers within the site and for any other temporary arrangenents to be erected within the area in connection with conducting soil testing

45

-

-

... More
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.

5

-

-

... More
56.3.a.1 Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.- In land

50

-

-

... More
56.3.b.1 Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.

50

-

-

... More
56.3.c.1 Boring with rotary power drilling equipment in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 20m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.

25

-

-

... More
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land

15

-

-

... More
56.7 Conducting standard penetration test in bore hole at any depth.

80

-

-

... More
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.

80

-

-

... More
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.

20

-

-

... More
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (reports in triplicate)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.