Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_696400_2Tender No
29/EE/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
6975
-
-
OD74991/2023-2024:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
6975
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
24
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
24
-
-
OD138393/2024-2025:Providing and fixing R.C board of fabricated steel work by using ISA 25x25x5 mm and MS Sheet of 0.5 mm thick including alla charges of materials and all labour charges,fabrication,conveyance,fixing painting vinyl sticker letter work etc, Complete as per direction of departmental officers.
2.16
-
-
Appendix -B-Pre monsoon works.
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
3.7
-
-
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
1440
-
-
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
80
-
-
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
1200
-
-
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
553.5
-
-
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
360
-
-
OD74992/2023-2024:Engaging Labours for cutting fallen down trees, rectifying with shelmac. refurbishment of signboards, eviction of minor encroachments ,Clearing culverts and drains etc.
90
-
-
Appendix -c-Proactive / Preventive maintenance.
-
-
-
OD74987/2023-2024:Procuring and supplying of approved quality ready mixed cold bituminous compound or equivalent for potholes filling works , including cost , conveyance , loading unloading .
1489
-
-
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
122
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
91.5
-
-
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
30.5
-
-
OD74988/2023-2024:Routine inspection charges :- conducting and reporting routine inspections for the entire length of the project road frequency of seven days throughout the agreement period of the running contract as directed by the departmental officers at site.
1388.4
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
12
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
12
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
4800
-
-
OD79670/2023-2024:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
4800
-
-
Appendix -D-Emergency works.
-
-
-
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
5.4
-
-
3.7:Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
7.5
-
-
3.8.A:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Mechanised
3
-
-
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
300
-
-
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
30
-
-
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
50
-
-
10.13:Clearing of land slide in hard rock requiring blasting for 50 per cent of the boulders and disposal of the same on the valley side.
10
-
-
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
180
-
-
OD74989/2023-2024:Engaging small tipper for removing earth and other unusable materials from road, including fuel charges and other expenses etc. complete
61
-
-
OD74990/2023-2024:Engaging JCB for removal of raised berm, clearing of drains, other obstructions and minor landslides in the PWD road including fuel charges, bata for driver and all other expenditure etc. complete.
59
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements