Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,515Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_688585_4Tender No
PWD/BR/TR/15756/2023_5_1_1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD23916/2024-2025:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-40 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . 1000 mm dia pile ( AS per CTE Approved OD )
81.3
-
-
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
54.1
-
-
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
4.21
-
-
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
39.6
-
-
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
16.89
-
-
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
9.3
-
-
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
2.33
-
-
14.1D.2.1.A:"Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification For solid slab super-structure - Height upto 5m
45.58
-
-
14.1C.2:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
5.3
-
-
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
12.19
-
-
14.9:Drainage Spouts complete as per drawing and Technical specification
4
-
-
14.4:Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.
4.02
-
-
APPENDIX B - ROAD APPORACH
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
0.08
-
-
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
23.2
-
-
12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
190.96
-
-
OD113556/2023-2024:Supplyingandstackingwellmaturedstraight6mlongcoconutposthavingavgdiameteron 25cmfor driving down throughvarious strata belowbed level including cost coveyance labour charges etc complete.( CTE data 3.1)
580
-
-
OD113555/2023-2024:Driving down coconut pile to lines and levels through sandy soil strata including all hirecharges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 5 numbers per day 6X5=30m Details for30m length.( CTE data 3,2)
580
-
-
OD113554/2023-2024:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m9CTE data 3.13)
83
-
-
OD113558/2023-2024:Bailing out water using pump above 5HP and Upto 10HP-Bailing out water with engine and pumpset above 5HP and upto10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
208
-
-
OD25810/2024-2025:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site (CTE approved OD (April 2023) item No 1.4)
36.88
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.52
-
-
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
9.18
-
-
12.8.H.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M35 - Using Batching Plant, Transit Mixer and Concrete Pump <br>
51.52
-
-
12.8.G.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M30 - Using Concrete Mixer <br>
60.75
-
-
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
10.27
-
-
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
255
-
-
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
83.31
-
-
OD112833/2024-2025:Providing weep holes in Reinforced concrete abutment, wing wall/return wall with 75 mm dia PVC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce. Complete as per drawing and Technical Specifications
17.5
-
-
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
87.3
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
87.3
-
-
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
582
-
-
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
1.84
-
-
8.4.12:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 50cmx 60 cm rectangular (Single chevron etc.)
2
-
-
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
0.72
-
-
55.10.2:Providing and erecting retro-reflectorised Object Hazard Marker 450mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801. 450mm x 900 mm
4
-
-
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
24
-
-
OD116103/2023-2024:Temporary steel foot bridge constructed by using structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, (finished surface width of Foot bridge is 1,5 m ) all complete. (Derived from DAR 10.2)
2049.37
-
-
55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013.
125.37
-
-
OD31011/2024-2025:Providing and fixing DLP Board made of non- reflective type HD Vinyl printed sheeting fixed over Aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 2 boards of 1200mm x 600mm fixed on one frame
1
-
-
OD31105/2024-2025:Supplying and providing Inauguration Stone by using granite 18 mm thick,laid over 20 mm thick cm 1:4 ,including engraving the latters , transportation etc complete Data Based on DAR 8.13.1
2.16
-
-