Public Works Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date21 Jan 2025
Closing Date28 Feb 2025
Tender Amount₹ 1,06,44,00,000 
Notes
Download

Costs

Summary

Rehabilitation And Up Gradation Of Veeyapuram Edathua Puthukkary Mambuzhakkary Kidangara Kunnamgary Kumarangary Valady Mulakkarnthuruthy Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3.15 Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>

11600

-

-

... More
3.14 Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.

17681.25

-

-

... More
OD80099/2024-2025 Removal and reuse of existing paver block in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.

780

-

-

... More
BILL 2- Earthworks

-

-

-

... More
OD129820/2024-2025 Excavation for roadwork in all type of soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and leads

10522.25

-

-

... More
3.17 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.

14889

-

-

... More
3.16 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.

3006.72

-

-

... More
3.18 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2

54588.43

-

-

... More
4.13 Construction of Median and island above road level with approved material deposited at the site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 408

23.65

-

-

... More
BILL 3- Sub base and Base courses

-

-

-

... More
4.1.B.1 Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method

41280.72

-

-

... More
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

20813.91

-

-

... More
OD81694/2024-2025 Providing and laying geocell of size 150X356 in WMM layer all complete as per IRC SP 59-2019 and additional technical specification Clause A1

101551.39

-

-

... More
BILL 4- Pavement Courses

-

-

-

... More
5.1.a Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.

113742

-

-

... More
5.2.b Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.

113742

-

-

... More
5.2.a Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

131128.98

-

-

... More
5.4.2b Dense Graded Bituminous Macadam : - For grading - II (26.5 mm nominal size) Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder (VG 30) @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.

5675.76

-

-

... More
OD81699/2024-2025 Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading -II (13.2 mm Nominal size)

4769.65

-

-

... More
OD81888/2024-2025 Construction of ramp to paddy fields/access to adjacent properties, plain cement concrete M30 grade concrete pavement, over a prepared sub base with 43 grade cement, coarse and fine aggregates confirming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design and formwork as per drawing and technical specification.

202.5

-

-

... More
BILL 5- CULVERT

-

-

-

... More
OD129829/2024-2025 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and back filling with approved material in all types of soil by mechanical means for all depth.

10102.97

-

-

... More
12.8.A Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>

732.11

-

-

... More
OD81707/2024-2025 Providing and laying Plain/Reinforced Cement Concrete M20 for head wall and wing wall in Foundation including formwork but excluding reinforcement complete as per Drawing and Technical Specifications.

478.99

-

-

... More
13.5.B Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M20 - Height upto 5m

478.99

-

-

... More
12.8.G.2.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump

632.22

-

-

... More
13.5.G.p.2 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump

650.06

-

-

... More
14.1.C.1 Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure as per drawing and Technical Specification

341.44

-

-

... More
12.40 Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications

57.73

-

-

... More
13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

50.81

-

-

... More
13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

20.73

-

-

... More
OD84169/2024-2025 Providing and painting with synthetic enamel paint of approved quality on culvert with culvert No. and span arrangements as per IRC - 7, 1971

160

-

-

... More
8.8 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

423.99

-

-

... More
13.9.A Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material

1100.96

-

-

... More
13.10 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

1006.86

-

-

... More
13.8 Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications

733

-

-

... More
15.10.B Curtain wall complete as per drawing and Technical Specification :- Cement concrete Grade M15

877.74

-

-

... More
OD81708/2024-2025 Providing Plain Cement Concrete M20 for Encasing complete as per Drawing and Technical Specifications. PCC Grade M20

240.63

-

-

... More
15.1.A Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates.

1685.71

-

-

... More
15.8.B.1 Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding : Cement Concrete blocks Grade M15

395.57

-

-

... More
14.9 Drainage Spouts complete as per drawing and Technical specification

46

-

-

... More
2.4.4.B Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>

1729.49

-

-

... More
2.4.2.B Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Prestressed / reinforced cement concrete grade M- 20 & above - By Mechanical Means<br>

165.27

-

-

... More
15.4.A Providing and laying Pitching on slopes laid over prepared filter media including boulder Stone/Boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications

617.2

-

-

... More
15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

273.72

-

-

... More
9.2.B Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first-class bedding of granular material in a single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in headwalls and parapets. 1200 mm dia

778

-

-

... More
2.4.10.A Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia

656.3

-

-

... More
OD81709/2024-2025 Pillar for inscribing structure No. for culverts, bridges etc in reinforced cement concrete M 15 grade of standard design, fixing in position including painting and printing etc ( precast)

228

-

-

... More
2.5.2.A Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately<br> Bituminous course - By Mechanical Means<br>

26.31

-

-

... More
OD110539/2024-2025 Construction of granular fill as per drawing by providing graded material, spreading in uniform layers with excavator on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401

213.93

-

-

... More
OD78506/2024-2025 Cutting and removing excess length of wooden piles to line and level etc.complete

341.43

-

-

... More
OD78505/2024-2025 Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost of coveyance, labour charges etc complete

2724

-

-

... More
OD78507/2024-2025 Driving coconut pile to line and levels through soft to medium clay strata including all hire charges, labour charges and all other appliances necessary for driving down pile after pointing the bottom end. Avg output 8 nos/day

2724

-

-

... More
BILL 6- Repair and Rehabilitation

-

-

-

... More
OD75622/2024-2025 Guniting the damaged part of slab after removing /old guniting /part of defective concrete, cleaning the surface and exposed reinforcement throughly by sand blasting , spraying with epoxy @ 0.67 Kg/sqm including cost of wire mesh farics 5cmx 5cmxNo 10gauge in first layer of guniting complete as per drawings Techanical specifications Clause 2807 and as directed by Engineer .

625

-

-

... More
OD75638/2024-2025 Clearing of culvert vents and river/stream bed on U/S and D/S of culvert by removing deposited debris, slit, soil and any other foreign material and including safe disposal of removed material as per technical specification section 300 based on the specification 3.6.Excavation for roadwork in soil with hydraulic excavator

1383

-

-

... More
OD75646/2024-2025 Repairs to loose boulder pitching/revetment to embankment slopes near abutments by removal ,stacking of existing boulders and relaying stacked boulders properly after increasing height of earth fill around embankment as per Technical specifications clause 2504

107

-

-

... More
15.1.A Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates.

36

-

-

... More
OD75640/2024-2025 Clearing and grubbing under culvert and in river/stream bed both U/S and D/S of existing culvert including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>

118

-

-

... More
OD109648/2024-2025 Providing ruled pointing in 1:3 Cement mortar in coursed rubble masonry in abutments, piers and wing walls complete as per clause 1405.6 of Technical specifications

196

-

-

... More
2.7 Dismantling guard rails by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.

534

-

-

... More
14.6 Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

522

-

-

... More
13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

3

-

-

... More
Sealing of cracks by injecting grout through nipples including cleaning the affected area complete as per Section 2800

-

-

-

... More
16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1

1391

-

-

... More
16.5.B Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical Specification Cement Mortar (1:1) Grouting

159

-

-

... More
16.4 Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

290

-

-

... More
OD110748/2024-2025 Protective surface coating of concrete by acrylic estastomeric coating to inhibit the ingress of chlorides or carbon dioxide. As per Technical specification Clause 2808

6330

-

-

... More
16.9 Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively, water-cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6.

230

-

-

... More
16.6 Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer.

426

-

-

... More
16.11 Eproxy bonding of new concrete to old concrete

426

-

-

... More
8.8 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

374

-

-

... More
16.22 Repair of RCC Railing : Carrying out repair of RCC m30 railing to bring it to the original shape.

70

-

-

... More
BILL 7- Drainage and Protection works

-

-

-

... More
Providing and constructing RCC Covered drain / Line drain complete as per drawing and Technical Specification Clause 309

-

-

-

... More
12.1.B.1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>

2117.61

-

-

... More
12.8.A.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>

257.1

-

-

... More
12.8.E.2.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump <br>

1136.21

-

-

... More
13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (For drain)

63.95

-

-

... More
OD83946/2024-2025 Providing inlet pipes of 150mm dia PVC pipe for draining out water from kerb face to drain complete as per drawing and as directed by the Engineer

514.2

-

-

... More
OD83912/2024-2025 Providing and fixing 150mmx150mm GI grating complete as per drawing and technical specifications.

514.2

-

-

... More
OD109693/2024-2025 Earth work excavation for construction of retaining wall as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and back filling with approved material. in all kind of soil by mechanical means for all depth

36990.59

-

-

... More
Providing and constructing Plain cement concrete M10 grade in levelling course of DRM/ RRM complete as per drawing and technical specification clause 309 and sections 1500 and 1700.

-

-

-

... More
OD109726/2024-2025 Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid in line and level, compacting with 8-10 tonnes vibratory roller, finishing and curing.

4220.65

-

-

... More
13.8 Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications

7864

-

-

... More
13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (For retaining wall)

95.55

-

-

... More
OD81879/2024-2025 Providing and laying plain/reinforced cement concrete coping grade M20 over DR/RR masonry wall including formwork complete as per drawing and Technical Specifications. PCC Grade M20

2856.03

-

-

... More
Supplying and providing woven coir geo textile fabric of type H2M25(900gra,/sqm opening size 9x12 thickness, 7.16mm with wide width tensile strength 19.8 KN/m in machine direction,18.8 KN/m in cross machine direction and trains at failure of 27.63 in machine direction and 21.06% in cross machine direction in wrap direction right angle to the alignment of road formation with suitable laps as directed by the departmental officers at site

64061.42

-

-

... More
OD79209/2024-2025 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

28020.59

-

-

... More
OD79208/2024-2025 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

3474.99

-

-

... More
13.4.A Random Rubble Stone masonry (coursed/uncoursed) work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

2684.34

-

-

... More
OD81935/2024-2025 Random Rubble Stone masonry (coursed/uncoursed) work with departmental rubble in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

443.24

-

-

... More
2.4.4.B Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>

5395.95

-

-

... More
2.4.4.B Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>

43750.6

-

-

... More
OD81870/2024-2025 Construction of granular fill as per drawing by providing graded material, spreading in uniform layers with excavator on a prepared surface, mixing by mix in-place method and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading V

10568.74

-

-

... More
OD79204/2024-2025 Cutting and removing excess length of wooden piles to line and level etc.complete

31426

-

-

... More
OD79205/2024-2025 Driving coconut pile to line and levels through soft to medium clay strata including all hire charges, labour charges and all other appliances necessary for driving down pile after pointing the bottom end. Avg output 8 nos/day-mechanical means

188556

-

-

... More
OD79203/2024-2025 Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost of coveyance, labour charges etc complete.

188556

-

-

... More
BILL 8- Road Markings and Signages

-

-

-

... More
8.16 Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting

214.57

-

-

... More
Providing and fixing Distance Indicator post including painting and printing etc all complete as per Technical Specification Clause 805.

-

-

-

... More
8.14.1 Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. 5th Kilometre stone ( precast)

5

-

-

... More
8.14.2 Reinforces cement concrete M 15 grade Kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone ( precast)

17

-

-

... More
OD81166/2024-2025 Reinforces cement concrete M 15 grade 200m stone of standard design as per IRC:8- 1980, fixing in position including painting and printing etc ( precast)

86

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc.

-

-

-

... More
OD131462/2024-2025 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. 60cm Equilateral triangle

566

-

-

... More
8.4a.8 Retro-Reflectorised Traffic Signs (Type XI) : 75 cm octagon <br> Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. (Stop sign)

79

-

-

... More
8.4a.3 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. <br> 60 cm circular

125

-

-

... More
State Route Marker/Direction sign

36

-

-

... More
8.5a Direction and Place Identification Signs upto 0.9 sqm Size Board (Type XI) Providing and fixing of direction and place identification retro-reflectorised sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc

11.52

-

-

... More
8.6a Direction and Place Identification Signs with size more than 0.9 sqm size Board (Type XI) Providing and fixing of direction and place identification retro-reflectorised sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 mm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.

18

-

-

... More
OD109781/2024-2025 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. - Flag type direction sign

36

-

-

... More
OD81163/2024-2025 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. <br> 30 cm x 90 cm rectangular - Hazard marker

490

-

-

... More
OD81164/2024-2025 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. <br> 45 cm x 90 cm rectangular - Double hazard marker

1

-

-

... More
OD131487/2024-2025 Retro-Reflectorised Traffic Signs (Type XI) : 50cmx 60 cm rectangular <br> Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering symbols etc. Chevron sign board

403

-

-

... More
OD131488/2024-2025 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 10 years warranty manufactured as per IRC :67 made of ASTM D 4956-09 Type XI micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over suitable primer and as per approved drawing and clause 801 including lettering <br>80 mm x 60mm rectangular. Bus stop sign board

32

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 .The finished surface to be level, uniform and free from streaks and holes.as per drawing and Technical specification 803

-

-

-

... More
OD131091/2024-2025 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes. Centre line/edge line/ transverse marking and any other markings

7061.74

-

-

... More
OD81169/2024-2025 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes. Directional arrows (Straight arrows)

213

-

-

... More
OD81168/2024-2025 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes. Left and right turn arrows

18

-

-

... More
OD81167/2024-2025 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes. Straight and left/right turn arrows

134

-

-

... More
8.35 Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3<br> Road Markers/Road Stud with Lense Reflector :-

7365

-

-

... More
8.15 Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)

6700

-

-

... More
OD81197/2024-2025 Construction of cement concrete kerb with top and bottom width 50 and 250 mm respectively, 200 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 100 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409

6668

-

-

... More
8.8 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

2300.05

-

-

... More
55.38a Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on Structural Steel c section vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of structural steel c section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3

855

-

-

... More
OD86572/2024-2025 Construction of traffic hump as per IRC 99-2018, with BC-Grading II and tack coat chord length 3m as all completed as per engineer in charge

71

-

-

... More
OD109820/2024-2025 Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M40 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.

11836.37

-

-

... More
55.22 Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.

2305.62

-

-

... More
OD110691/2024-2025 Providing and laying sand bed as per drawing and as per engineer in charge

69.17

-

-

... More
12.8.1.C.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>

672.87

-

-

... More
12.8.A.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>

504.66

-

-

... More
BILL 9- Bus Shelter

-

-

-

... More
OD130205/2024-2025 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lift and leads in all kinds of soil

62.5

-

-

... More
POD130324/2024-2025 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

91.25

-

-

... More
OD130325/2024-2025 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

105

-

-

... More
OD130445/2024-2025 Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement

600

-

-

... More
OD130352/2024-2025 Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium item.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-inCharge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.

1117

-

-

... More
OD130362/2024-2025 Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete:Gutter (600 mm over all girth)

262.5

-

-

... More
OD130378/2024-2025 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)

5680.02

-

-

... More
OD130443/2024-2025 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete including KSTP logo on top of bus shelter as directed by engineer in charge.Hot finished seamless type tubes-50 mm square tube main rafters, 40 mm square tube members.

12406.15

-

-

... More
OD130441/2024-2025 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work

300

-

-

... More
OD130437/2024-2025 Demolishing existing bus shelter manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in all lead as per direction of Engineer -in-Charge.

42

-

-

... More
Bill 10- Maintenance during Construction

-

-

-

... More
OD130437/2024-2025 Demolishing existing bus shelter manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in all lead as per direction of Engineer -in-Charge.

5901.5

-

-

... More
Billl 11- Temporary Diversion work

-

-

-

... More
3.17 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2

15840

-

-

... More
4.1.B.1 Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method

5664

-

-

... More
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

5913

-

-

... More
5.1.a Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means

13200

-

-

... More
5.2.b Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.

13200

-

-

... More
5.10.2.a Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and bitumen (VG-30) 6.8 kg per 10 sqm

13200

-

-

... More
OD75327/2024-2025 Construction of sub-grade and earthen shoulders with approved material deposited at site from roadway cutting and excavation from drain all complete with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per technical specification clause 305

2821.5

-

-

... More
9.2.B Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first-class bedding of granular material in a single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in headwalls and parapets. 1200 mm dia

840

-

-

... More
Bill 12- Electrical and Miscellaneous

-

-

-

... More
Supply, installation, testing and commissioning of 8 M octagonal pole made of hot dip galvanized GI sheet 70mm top diameter,130mm bottom diameter thickness 3mm base plate dimensions of 200x200x16mm suitable for wind speed as per IS 875 part III single arm bracket 0.5mt including foundation bolt 4 nos fixed in new RCC foundation and junction box etc. complete 8 Meters

262

-

-

... More
Supply, installation, testing and commissioning of 10M octagonal pole made of hot dip galvanized GI sheet 70mm top diameter,175mm bottom diameter thickness 3mm base plate dimensions of 275x275x16mm suitable for wind speed as per IS 875-part III single arm bracket 0.5mt including foundation bolt 4 nos fixed in new RCC foundation and junction box etc. complete 10 Meters

27

-

-

... More
Supply, installation, testing and commissioning of 150W LED street light output greater than 105lumen/W 4000 – 6000 K with IP66 protection LED chip make cree/lumilled/NIchea with power factor greater than .95 at full load internal surge protection upto 8 kV and Aluminium pressure die cast powder coated housing, acrylic cover complete with THD less than 10%, power factor greater than .98. RoHS complaint,duly wired up for use on 230V AC supply Driver compartment should be separately accessible for maintenance(LM 79 & 80 certificates from NABL accredited third party lab to be produced mentioning chip manufacturer)

262

-

-

... More
Supply, installation, testing and commissioning of 200W LED street light output greater than 105lumen/W 4000 – 6000 K with IP66 protection LED chip make cree/lumilled/NIchea with power factor greater than .95 at full load internal surge protection upto 8 kV and Aluminium pressure die cast powder coated housing, acrylic cover complete with THD less than 10%, power factor greater than .98. RoHS complaint,duly wired up for use on 230V AC supply Driver compartment should be separately accessible for maintenance(LM 79 & 80 certificates from NABL accredited third party lab to be produced mentioning chip manufacturer)

27

-

-

... More
Supply and laying of one number PVC insulated PVC sheathed armored aluminum power cable of 1.1KV grade of the following sizes in the existing RCC/HUME/STONE WARE/GI/DWC pipe as required. 4 core 16 sq.mm

9901

-

-

... More
Providing and laying earth connection from earth electrode with 6 SWG dia G.I Wire in 15mm dia G.I pipe from earth electrode including connection with G.I thimble excavation and refilling as required.

262

-

-

... More
Supplying, testing, installing and commissioning of 40mm HDPE pipe for underground cable laying

9000

-

-

... More
Supply, erection of 8 way feeder pillar outdoor type panel complete with accessories and concrete foundation, service cable termination, testing and commissioning in complete

9

-

-

... More
Fees to be remitted to Electrical Inspectorate/KSEB/meter testing lab/ fire & rescue service Department(Actual amount incurred for the above items will be reimbursed on production of original Receipts)

1

-

-

... More
Earthing with G.I earth pipe 4.5 metre long,40mm dia. including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/coke and salt as required.

19

-

-

... More
Bill 13- General Item

-

-

-

... More
Vehicles running cost of fuel and POL for 3000 Km.and as per Technical specifications 122

18

-

-

... More
Maintenance of Type 2 Vehicles (Provided for Employer) including full comprehensive insurance, Driver's salary, repairs including replacement of tyres as required, services as per manufacturer’s recommendation etc.and as per Technical specification 122

18

-

-

... More
Bill 14- Environmental, Safety, Health Safety and EMP Cost

-

-

-

... More
Resources allocated to ESHS management all completed as per Additional Specification Clause A-5

-

-

-

... More
ESHSE Manager having 10 years in designing and monitoring the implementation of ESHS management plans for construction works and In Similar Works Experience for 5 years

18

-

-

... More
ESHS Supervisor (one ESHS supervisor for each shift on each Project Area, respecting the provisions of 4.1.3), total work experience 5 years including 1 year similar work experience

18

-

-

... More
Community Liaison Officer having total experience 5 years [Fluency in local languages should be mandatory for this position]

18

-

-

... More
Implementation of the Health and Safety Plan all completed as per Additional Specification Clause A-5

-

-

-

... More
Installation silt fencing for control sediment into nearby surface water bodies as listed in section 5.5.10.1 5.5.10.1 Contamination of Surface Water from Construction and Allied Activities of ESIA report, including regular maintenance for entire construction period and removal of those fence on completion of work near surface water bodies

2900

-

-

... More
Provide and maintenance of personal protective equipment including nosal mask for prohibition of spread of Covid-10, as required, to all personnel, visitors or third parties entering a Project Area are equipped with Personal Protection Equipment (PPE) pursuant to the practices and standards specified in ESHS Clause 9

18

-

-

... More
Medical Check Up - The Contractor shall organises medical check-ups carried out by a doctor or an appropriately qualified nurse for all Contractor’s Personnel prior to the initial mobilisation to the Project Area to check aptitude for the work. - 32.2. Hearing tests are conducted for the Contractor’s personnel exposed to noise levels above 80 dB(A) in order to establish initial audiograms. Annual test shall be carried out as per advise of the Engineer. - Covid-19 test to the Contractor's personal as and when required

6

-

-

... More
Provide and maintain first-aid provisions on any work site, including: suitably stocked first-aid kits; a person, respectively an adequate number of staff appointed and trained to take charge of first-aid arrangements and ensure that staff and workers are informed about first-aid arrangements.

18

-

-

... More
Accommodation, drinking water, meals and transportation of staff all completed as per Additional Specification Clause A-5

-

-

-

... More
Accommodation, drinking water, meals and transportation of staff(*) Contractor shall provide to his personnel safe drinking water at all project areas. The quantity and quality of this water complies with the standards of the World Health Organization at supply points

1

-

-

... More
Provide and maintain accommodation for non-resident Personnel in a camp or an alternative structure outside of the Project Areas, such as a hotel or rented house, will comply with the conditions of the present ESHS Sub-Clause in pursuance of Sub-Clause 6.6 of the CC. The quality of accommodation shall comply with ESHS clause 40.2

1

-

-

... More
Contractor provides meals at a reasonable cost or free of charge to its Contractor’s Personnel per shift in a canteen area and according to a procurement system which complies with the provisions of this ESHS Specifications Sub-Clause

1

-

-

... More
Training and local recruitment management costs all completed as per Additional Specification Clause A-5

-

-

-

... More
Contractor shall organize training sessions for his personnel in two-folds: introductory sessions for starting work at the Project Area, and technical training as required in relation to the execution of the works as per ESHS Clause 8.3 and 8.5

6

-

-

... More
The Contractor will take out and maintain the necessary insurance to cover the cost of the sanitary repatriation of its Contractor’s Personnel

1

-

-

... More
Protection of adjacent areas, biodiversity, prevention of erosion and wastewater management all completed as per Additional Specification Clause A-5

-

-

-

... More
Protection of adjacent areas, prevention of erosion and wastewater management - The Contractor shall take the necessary measures to ensure that pollution to air, water or land is prevented or, where this is not possible, reduced and mitigated as far as practicable during the construction phase. If required in the PA-ESMP the Contractor will develop a pollution prevention Plan for managing e.g. atmospheric emissions and dust, e.g. noise and vibrations,

1

-

-

... More
Installation and maintenance of Oil Interceptor (refer schematic diagram at Annexure 8.4 of ESIA Report) for removal of oil and grease at vehicle wash bay

1

-

-

... More
Sprinkling of water for suppression of dust all along the construction areas for the entire construction period

1

-

-

... More
Traffic, noise and atmospheric emissions management, land take all completed as per Additional Specification Clause A-5

-

-

-

... More
Contractor shall carry out or contracting the monitoring of the effluent quality pursuant to the present ESHS Specifications by external accredited agency for sampling and laboratory analysis and submit the analysis results the engineer.

6

-

-

... More
Contractor shall carry out monitoring of environmental attributes of as per environmental monitoring plan for Construction phase. Plant site environmental monitoring - if it is part of mandatory consent/permit condition by KSPCB, it will not be payable under BOQ.

-

-

-

... More
Ambient Air Quality

15

-

-

... More
Surface Water Quality

10

-

-

... More
Ground Water Quality

8

-

-

... More
Noise Level

10

-

-

... More
Soil Quality

3

-

-

... More
Contractor shall carry out monitoring of environmental attributes of as per environmental monitoring plan for 1 year of operational phase/Defect Liability Period

-

-

-

... More
Ambient Air Quality

6

-

-

... More
Surface Water Quality

6

-

-

... More
Ground Water Quality

2

-

-

... More
Noise Level

6

-

-

... More
Soil Quality

2

-

-

... More
Waste and hazardous products management all completed as per Additional Specification Clause A-5

-

-

-

... More
Identifying, collecting, transporting and treating all waste produced on the Project Areas..

1

-

-

... More
Vegetation clearing and site rehabilitation all completed as per Additional Specification Clause A-5

-

-

-

... More
Site rehabilitation - the Contractor will rehabilitate all Project Areas and landscapes disturbed by the works, to their original condition where possible upon completion of construction and prior to the provisional acceptance of the works. Close collaboration with all statutory stakeholders will be conducted in cooperation with the Employer during the reinstatement. This will include all temporarily acquired sites including borrow areas, quarry areas, camp site, storage areas, diversions, etc.

1

-

-

... More
Bill 15- Reconstruction of affected encroached structures within the COI as per ESMP

-

-

-

... More
OD130663/2024-2025 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and back filling with approved material in all types of soil by mechanical means for all depth for compound wall

25

-

-

... More
OD130819/2024-2025 Dismantling of encroached structures comprising of masonry, cement concrete, wood work, steel work etc wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres for encroached structures

50

-

-

... More
12.4 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days for compund wall

10

-

-

... More
12.7.B Random Rubble Masonry (coursed/uncoursed ) Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications for compound wall.

20

-

-

... More
OD130878/2024-2025 Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete for compound wall

40

-

-

... More
OD131005/2024-2025 Plastering of compound wall using 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) for compound wall

200

-

-

... More
Bill No.16- Provisional Sum - Utility shifting - Shifting of obstructing utilities towards existing RoW (as per the details available from KSTP) for the approx. value of INR 3,63,67,797/- (excl. GST). The works shall be carried out as per the approved estimate by the utility agencies, in close coordination with utility agency and as per precaution / conditions stipulated by the agency all complete as per Technical Specification of bid document and utility agencies.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.