Public Works Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 May 2022
Closing Date2 Jun 2022
Tender Amount₹ 51,36,832 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

General Rm-2022-23 Cluster Ii/one Year Rc-zone1x For Various Pwd Roads Under Roads Section Muttom In Idukki District-3 Road Stretches For A Length Of 16.10 Km-general Civil Work..

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

2.43

-

-

... More
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.

5.13

-

-

... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

2.43

-

-

... More
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method

37.5

-

-

... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.

250

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

1200

-

-

... More
OD38822/2022-2023:Providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification

1200

-

-

... More
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)

239.03

-

-

... More
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>

38.63

-

-

... More
OD42289/2022-2023:Dry rubble masonry for retaining wall construction Morth OD

285

-

-

... More
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.55

-

-

... More
Premonsoon works

-

-

-

... More
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)

1.88

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

1.68

-

-

... More
OD18065/2022-2023:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 12mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete

1.48

-

-

... More
OD18066/2022-2023:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 36mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete

1.28

-

-

... More
OD18062/2022-2023:Engaging mazdoor

118

-

-

... More
OD18063/2022-2023:Engaging small Tipper for removing the excavated materials, debris for various premonsoon works

125

-

-

... More
OD18064/2022-2023:Engaging Excavator (JCB) for various purposes

45

-

-

... More
3.5:Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres

3.6

-

-

... More
OD18067/2022-2023:Dry rubble packing with deptl rubble.

9

-

-

... More
OD47458/2022-2023:Supplying instant road repair mix to roads section Muttom in packets which contains 50kg of compounds

50

-

-

... More
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means

0.38

-

-

... More
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.

30

-

-

... More
Proactive/Preventive maintenance

-

-

-

... More
OD47457/2022-2023:Supplying instant road repair mix to roads section Muttom in packets which contains 50kg of compounds

160

-

-

... More
OD18069/2022-2023:Engaging mazdoor for clearing drain to prevent water logging

72

-

-

... More
OD18070/2022-2023:Engaging Excavator (JCB) for various purposes for clearing water logging

50

-

-

... More
OD18071/2022-2023:Conducting and Reporting Inspection Inspection for the entire length of the Project Road frequency of 7 days throughout thr agreement project for the Running Contract as directed by the departmental officers at site

626.6

-

-

... More
Emergency works

-

-

-

... More
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually

300

-

-

... More
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side

25

-

-

... More
OD18059/2022-2023:Engaging mazdoor for various purposes

120

-

-

... More
OD18060/2022-2023:Engaging Excavator (JCB) for various purposes

80

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.