Public Works Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Feb 2024
Closing Date15 Feb 2024
Tender Amount₹ 21,69,421 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

13.2

-

-

... More
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.

2.19

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

522.5

-

-

... More
OD68374/2023-2024:Hiring hydraulic excavator 1 cum bucket capacity to remove accumulated earth and rock materials from the road as per the direction of Engineer in charge

12

-

-

... More
OD68376/2023-2024:Engaging Tipper for conveying the removed materials loading and unloading etc complete.

5

-

-

... More
OD68378/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD

522.5

-

-

... More
Appendix-B : Premonsoon Works

-

-

-

... More
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area

14.1

-

-

... More
OD68381/2023-2024:Engaging Mazdoor for clearing chocked culvert and drains,for loading and unloading of various materials at site,removing thick thorny bushes etc complete as per the direction of departmental officers at site.

100

-

-

... More
OD215377/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.

29

-

-

... More
OD68383/2023-2024:Hire charges for tractor trolley for disposing various materials from site etc. complete.

12

-

-

... More
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)

545

-

-

... More
Appendix-C : Preventive Maintenance Works

-

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

15.98

-

-

... More
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)

2.39

-

-

... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

15.98

-

-

... More
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.

2.39

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

135

-

-

... More
OD68384/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD

135

-

-

... More
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.

350

-

-

... More
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

82.94

-

-

... More
OD68397/2023-2024:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site.

2503.28

-

-

... More
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.

1323

-

-

... More
Appendix-D : Emergency Works

-

-

-

... More
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side

36.5

-

-

... More
OD215385/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.

10

-

-

... More
OD68407/2023-2024:Engaging Mazdoor for various works

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.