Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_656165_1Bid Award Id
ViewTender No
PWD/RB/TR/11937/2023_5_1_1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
13.2
-
-
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
2.19
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
522.5
-
-
OD68374/2023-2024:Hiring hydraulic excavator 1 cum bucket capacity to remove accumulated earth and rock materials from the road as per the direction of Engineer in charge
12
-
-
OD68376/2023-2024:Engaging Tipper for conveying the removed materials loading and unloading etc complete.
5
-
-
OD68378/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD
522.5
-
-
Appendix-B : Premonsoon Works
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
14.1
-
-
OD68381/2023-2024:Engaging Mazdoor for clearing chocked culvert and drains,for loading and unloading of various materials at site,removing thick thorny bushes etc complete as per the direction of departmental officers at site.
100
-
-
OD215377/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.
29
-
-
OD68383/2023-2024:Hire charges for tractor trolley for disposing various materials from site etc. complete.
12
-
-
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
545
-
-
Appendix-C : Preventive Maintenance Works
-
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
15.98
-
-
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
2.39
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
15.98
-
-
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
2.39
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
135
-
-
OD68384/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD
135
-
-
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
350
-
-
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
82.94
-
-
OD68397/2023-2024:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site.
2503.28
-
-
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
1323
-
-
Appendix-D : Emergency Works
-
-
-
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
36.5
-
-
OD215385/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.
10
-
-
OD68407/2023-2024:Engaging Mazdoor for various works
24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements