Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
General-rm 2022-23/cluster Ii/ One Year Rc-zone Xiv-for Various Pwd Roads Under Roads Section- Karimannoor In Idukki District -3 Roads Stretches For A Length Of 16.450 Kmgeneral-rm 2022-23/cluster Ii/ One Year Rc-zone Xiv-for Various Pwd Roads Under
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PWD_492035_1Bid Award Id
ViewTender No
12.EE/2022-23Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
60.74
-
-
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
7.6
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
43.48
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
60.8
-
-
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
608
-
-
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
17.26
-
-
55.5.a:Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.
7.6
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
11688.8
-
-
OD41386/2022-2023:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means
11688.8
-
-
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
22.5
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
15.75
-
-
APPENDIX B: PRE MONSOON WORKS
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
2.67
-
-
OD43498/2022-2023:Engaging Small Tipper for various works in the PWD roads as per the directions of Engineer in charge, including fuel charge and all other expenditures etc. complete
21
-
-
OD41383/2022-2023:Engaging Backhoe loaders & excavators/Tracked Excavators for various works in roads as per the direction of Engineer in charge
21
-
-
OD41384/2022-2023:Supplying and stacking cold bituminous mix compound 25/50 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
530
-
-
OD41385/2022-2023:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge
55
-
-
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
21
-
-
APPENDIX C:PROACTIVE/PREVENTIVE MAINTENANCE
-
-
-
OD41375/2022-2023:Supplying and stacking cold bituminous mix compound 25/50 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
425
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
10
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
2052
-
-
OD41376/2022-2023:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means
2052
-
-
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
380
-
-
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
400
-
-
OD41377/2022-2023:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge
42
-
-
OD41378/2022-2023:Conducting and Reporting Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period for the Running Contract as directed by Engineer in charge
855.4
-
-
APPENDIX D:EMERGENCY WORKS
-
-
-
OD41379/2022-2023:Engaging coolie/labour for miscellaneous works
48
-
-
OD43506/2022-2023:Engaging Small Tipper for various works in the PWD roads as per the directions of Engineer in charge, including fuel charge and all other expenditures etc. complete
26
-
-
OD41381/2022-2023:Engaging JCB for removal of Slipped earth , other obstructions in the PWD road including fuel charges, Bata of driver and other all expenditure including etc. complete
26
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements