Public Works Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date18 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 31,48,839 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

800

-

-

... More
OD42934/2024-2025:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS

800

-

-

... More
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method

9

-

-

... More
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material

2000

-

-

... More
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.

60

-

-

... More
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>

6.54

-

-

... More
OD42935/2024-2025:PROviding and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surafce with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc

2.98

-

-

... More
OD42936/2024-2025:Providing and fixing vinyl sticker in existing DLP board including lettering and printing

4.39

-

-

... More
Apendix B -Pre Monsoon works

-

-

-

... More
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area

0.77

-

-

... More
OD42943/2024-2025:Supply Granular material at site

3.71

-

-

... More
OD42944/2024-2025:Engaging coolie

60

-

-

... More
OD42945/2024-2025:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete

35

-

-

... More
OD42946/2024-2025:Engaging JCB including fuel charges, Bata of driver and other all expenditure including etc. complete

35

-

-

... More
OD42947/2024-2025:Supplying instant road repair mix in packets which contains 25 kg of compounds

195

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

3.71

-

-

... More
OD42948/2024-2025:FILLING up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 36mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete

3.71

-

-

... More
Appendix C: Protective/Preventive maintenance works

-

-

-

... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

8.7

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

8.7

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

600

-

-

... More
OD42942/2024-2025:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS

600

-

-

... More
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means

151.22

-

-

... More
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

26.79

-

-

... More
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>

33

-

-

... More
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>

6.75

-

-

... More
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications

0.68

-

-

... More
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)

28.2

-

-

... More
OD68163/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1000

-

-

... More
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material

1094

-

-

... More
Appendix D: Emergency works

-

-

-

... More
OD42937/2024-2025:Engaging excavator (JCB) for various purposes

20

-

-

... More
OD42938/2024-2025:Engaging small tipper for removing the excavated materials , debris for various premonsoon works

20

-

-

... More
OD42939/2024-2025:Engaging mazdoor

40

-

-

... More
OD42940/2024-2025:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.

307.32

-

-

... More
OD42941/2024-2025:Supply of granular material at site

13.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.