Public Works Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_697215_1Tender No
33/EE/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
800
-
-
OD42934/2024-2025:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS
800
-
-
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
9
-
-
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
2000
-
-
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
60
-
-
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
6.54
-
-
OD42935/2024-2025:PROviding and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surafce with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
2.98
-
-
OD42936/2024-2025:Providing and fixing vinyl sticker in existing DLP board including lettering and printing
4.39
-
-
Apendix B -Pre Monsoon works
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
0.77
-
-
OD42943/2024-2025:Supply Granular material at site
3.71
-
-
OD42944/2024-2025:Engaging coolie
60
-
-
OD42945/2024-2025:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
35
-
-
OD42946/2024-2025:Engaging JCB including fuel charges, Bata of driver and other all expenditure including etc. complete
35
-
-
OD42947/2024-2025:Supplying instant road repair mix in packets which contains 25 kg of compounds
195
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
3.71
-
-
OD42948/2024-2025:FILLING up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 36mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete
3.71
-
-
Appendix C: Protective/Preventive maintenance works
-
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
8.7
-
-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
8.7
-
-
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
600
-
-
OD42942/2024-2025:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS
600
-
-
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
151.22
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
26.79
-
-
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
33
-
-
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
6.75
-
-
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
0.68
-
-
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
28.2
-
-
OD68163/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
1000
-
-
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
1094
-
-
Appendix D: Emergency works
-
-
-
OD42937/2024-2025:Engaging excavator (JCB) for various purposes
20
-
-
OD42938/2024-2025:Engaging small tipper for removing the excavated materials , debris for various premonsoon works
20
-
-
OD42939/2024-2025:Engaging mazdoor
40
-
-
OD42940/2024-2025:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.
307.32
-
-
OD42941/2024-2025:Supply of granular material at site
13.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements