Pradhan Mantri Gram Sadak Yojana Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Eprocure
Opening Date25 May 2020
Closing Date1 Jun 2020
Tender Amount₹ 31,35,802
Costs
EMD
₹ 50,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KSRD_92884_22Bid Award Id
ViewTender No
3/711/HC/UT/2020/CE-KSRRDATender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Haulage of materials by tipper excluding cost of loading , uploading and stacking
1370.25
-
2.28
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Grading 1
22.5
-
2992.85
... More
Construction of Water bound Mecadam (WBM) by providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
22.5
-
3376.14
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
22.5
-
3427.1
... More
BITUMINOUS LAYERS
-
-
-
... More
Providing and applying prime coat with bitumen emulsion (Packed -SS1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 (Low porosity)
300
-
37.37
... More
Providing and applying tack coat with Bitumen emulsion (Packed- RS1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503
300
-
12.65
... More
Providing and applying tack coat with Bitumen emulsion (Packed- RS1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503
3000
-
10.31
... More
Providing, laying and rolling of open-graded premix chipping carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (NRMB).
3300
-
169.6
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Type C NRMB).
3300
-
59.37
... More
C D WORKS
-
-
-
... More
Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.-soil
196.67
-
495.04
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C grade M 10 ) Nominal mix 1:3:6
10
-
7776.73
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (P.C.C grade M 15 )
108.33
-
8068.64
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C grade M 20 for wearing coat ) Nominal mix (1:2:4)-
18
-
8789.74
... More
PROTECTION WORKS
-
-
-
... More
Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
25.5
-
495.04
... More
Dry rubble masonry for retaining wall including all cost, conveyance ,labour charges etc complete
175.5
-
2225.69
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
607.5
-
68.68
... More
Providing concrete in reinforced concrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M20 )
8.63
-
9296.83
... More
Providing concrete in plainconcrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M10)
0.5
-
7776.73
... More
Providing concrete in plainconcrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M20)
0.25
-
8789.74
... More
Construction Cement Concrete drain
-
-
-
... More
Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
70
-
495.04
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M10)
10
-
7776.73
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M15 )
27
-
7628.52
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M20 for wearing coat)
2.75
-
8789.74
... More
Total Construction cost
11067.1
-
0.74
... More
Maintenance for 5 years
-
-
-
... More
Maintenance for first Year after completion (7% of (9% x Construction Cost) )
5990
-
-
... More
Maintenance for second Year after completion (8% of (9% x Construction Cost) )
5990
-
-
... More
Maintenance for third Year after completion (10% of (9% x Construction Cost) )
5990
-
-
... More
Maintenance for fourth Year after completion (30% of (9% x Construction Cost)
5990
-
-
... More
Maintenance for fifth Year after completion (45% of (9% x Construction Cost)
5990
-
-
... More
Total Maintenance cost
5990
-
1