Ministry Of Commerce And Industry Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 22,250Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RB_773624_1Tender No
RBD-ENP0ENGG(CIVIL)/52/2024-E and PTender Authority
Ministry Of Commerce And Industry ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Reconstruction of damaged retaining wall near CQCL, RRII - Tender Notice
Reconstruction of damaged retaining wall near CQCL, RRII - Tender Notice
BOQ Items
... More
50 metres lead as per direction of Engineer -in- Charge:
-
-
-
... More
In cement mortar
32
-
-
... More
Earth work in excavation by mechanical means /
-
-
-
... More
manual means in foundation trenches or drains (not
-
-
-
... More
exceeding 1.5 m in width or 10 sqm on plan),
-
-
-
... More
including dressing of sides and ramming of bottoms,
-
-
-
... More
lift upto 1.5 m, including getting out the excavated soil
-
-
-
... More
and disposal of surplus excavated soil as directed,
-
-
-
... More
within a lead of 50m. All kinds of soils
170
-
-
... More
Extra for every additional lift 1.5 m or part there of
-
-
-
... More
in excavation / banking excavated or stacked materials.
-
-
-
... More
All kinds of soil
25
-
-
... More
Filling available excavated earth (excluding rock)
-
-
-
... More
in trenches, plinth, sides of foundations etc. in layers
-
-
-
... More
not exceeding 20 cm in depth, consolidating each
-
-
-
... More
deposited layer by ramming and watering, lead
-
-
-
... More
up to 50 m and lift up to 1.5 m.
80
-
-
... More
Dry rubble masonry.-Dry rubble without concrete
-
-
-
... More
levelling course masonry with departmental rubble
-
-
-
... More
retreived from collapsed madonry including
-
-
-
... More
packing to compactness to lines and levels cost and
-
-
-
... More
conveyance of all materials except rubble,labour
-
-
-
... More
charges etc. complete as per direction of
-
-
-
... More
Departmental officers at site
18.21
-
-
... More
Dry rubble masonry.-Dry rubble without concrete
-
-
-
... More
levelling course masonry with good quality blasted
-
-
-
... More
rubble including packing to compactness to lines
-
-
-
... More
and levels cost and conveyance of all materials,
-
-
-
... More
labour charges etc. complete as per direction of
-
-
-
... More
Departmental officers at site
135
-
-
... More
Providing and laying in position cement
-
-
-
... More
concrete 1:3:6 (1 cement : 3 coarse sand : 6
-
-
-
... More
graded stone aggregate 20 mm nominal
-
-
-
... More
size)excluding the cost of centering and
-
-
-
... More
shuttering - All work up to plinth level:including curing
4
-
-
... More
Providing and laying in position reinforced
-
-
-
... More
cement concrete 1:1:5:3 (1 cement 1.5 coarse
-
-
-
... More
sand :3 graded stone aggregate 20 mm
-
-
-
... More
nominal size )excluding the cost of centering,
-
-
-
... More
shuttering, finishing and reinforcement - All
-
-
-
... More
work up to plinth level including curing
12
-
-
... More
Centering and shuttering including strutting,
-
-
-
... More
propping etc. and removal of form for:walls
-
-
-
... More
(any thickness) including attached pilasters,
-
-
-
... More
butteresses, plinth and string courses etc.
26.4
-
-
... More
Steel reinforcement for R.C.C work including
-
-
-
... More
straightening, cutting, bending, placing in position
-
-
-
... More
and binding all complete upto all levels.
-
-
-
... More
Hot rolled deformed bars
960
-
-
... More
Demolishing brick work manually / by mechanical
-
-
-
... More
means including stacking of serviceable material and
-
-
-
... More
disposal of unserviceable material within 50 metres
-
-
-
... More
lead as per direction of Engineer-in-Charge.
-
-
-
... More
In cement mortar
3
-
-
... More
Demolishing R.C.C. work manually / by mechanical
-
-
-
... More
means including stacking of steel bars and disposal
-
-
-
... More
of unserviceable material with in 50 metres lead as
-
-
-
... More
per direction of Engineer -in-Charge.
2.15
-
-
... More
12 mm cement plaster of mix:1:4 including curing
-
-
-
... More
( 1 cement : 4 coarse sand)
35
-
-
... More
Brick work with common burnt clay F.P.S
-
-
-
... More
(non modular) bricks of class designation 7.5 in
-
-
-
... More
foundation and plinth in:
-
-
-
... More
Cement mortar 1:6 (1 cement : 6 coarse sand) including
-
-
-
... More
curing
1.52
-
-
... More
Retreiving and stacking reusable rubble from
-
-
-
... More
debris dumped near the site. %voids will be
-
-
-
... More
deducted from the stack measurement to
-
-
-
... More
arrive net quantity.
3.77
-
-
... More
Shifting demolished rubble using lorry within
-
-
-
... More
5Km distance.
32
-
-
... More
Total
-
-
-
... More
GST 18%
-
-
-
... More
Total Amount
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements