Local Self Government Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 30,888Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_LSGD_720173_1Tender No
PP/EG7/2024-25/SE/129Tender Authority
Local Self Government Department ViewPurchaser Address
-Website
http://https://lsgkerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
124.98
-
-
... More
OD279572/2024-2025:Filling up low lying and waterlogged areas with local material /quarry muck, spreading in layers, leveling the top at site and consolidation by ramming ,etc complete for improving the CBR value of subgrade
18.65
-
-
... More
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
18.65
-
-
... More
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5)
46.63
-
-
... More
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
4.66
-
-
... More
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
28.4
-
-
... More
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
3.05
-
-
... More
OD279570/2024-2025:Providing man mazdoor for removing the slabs and also fixing new slabs on the drain top
11
-
-
... More
OD279571/2024-2025:Item shifted to Sub head 14 as item 14.73 Item shifted to Sub head 14 as item 14.74 Steel work welded in built up sections /framework, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc as required. In gratings, frames, guard bar, ladder, railing, brackets, gates and similar works (ref DAR 10.25.2)
135
-
-
... More
OD282123/2024-2025:Filling with contractors own earth (excluding rock) in trenches ,plinth ,sides of foundation etc in layers not exceeding 20 cm in depth ,lead up to 50 m and lift up to 1.5 m as per the direction of site engineer in charge.
14.24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements