Local Self Government Department Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Local Self Government Department - LSGD Tender
Civil And Construction
Eprocure
Opening Date14 Jan 2025
Closing DateCancelled
Tender Amount₹ 10,08,459
Costs
EMD
₹ 25,211Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_LSGD_725967_1Tender No
3/ET3/2024-25/AE/LIDEW/TKDGPTTender Authority
Local Self Government Department ViewPurchaser Address
-Website
http://https://lsgkerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
19.44
-
-
... More
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
3.24
-
-
... More
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
19.44
-
-
... More
26.28.1:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge75mm average thickness
20.77
-
-
... More
26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness
26.27
-
-
... More
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
20.77
-
-
... More
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
7.42
-
-
... More
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
40.75
-
-
... More
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
105.52
-
-
... More
OD136301/2024-2025:Applying a coat of passivating zinc rich primer, CERA ZINC ZR or like with paintbrush all complete as per direction of Engineer-In-Charge.Bars below 12 mm dia
1517.23
-
-
... More
OD136324/2024-2025:Applying a coat of passivating zinc rich primer, CERA ZINC ZR or like with paintbrush all complete as per direction of Engineer-In-Charge.Bars above 12 mm dia
371.88
-
-
... More
26.30.1:Drilling suitable holes in reinforced or plain cement concrete with power driven
drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,
columns and slabs to introduce steel bars for sunshades/balconies including
fixing the steel bars in position using epoxy resin anchor grout of approved
make but excluding the cost of reinforcement, all complete as per direction of
Engineer-In-Charge.Upto and including 12mm dia.
428
-
-
... More
OD136325/2024-2025:Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 125mm upto 255mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of EngineerIn-Charge. Bars above 12mm dia
84
-
-
... More
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make
33.76
-
-
... More
OD136328/2024-2025:Micro concreting using high strength non-shrink, pourable / pumpable grout with 10mm down size aggregate with water binder ratio 0.135
6.65
-
-
... More
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
0.89
-
-
... More
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
1.95
-
-
... More
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
4.54
-
-
... More
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
1783.36
-
-
... More
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
240
-
-