Local Self Government Department Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Local Self Government Department - LSGD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date20 Jan 2025
Closing Date29 Jan 2025
Tender Amount₹ 5,07,852
Costs
EMD
₹ 12,696Document Cost
₹ 1,120Tender Fee
Refer Documents
Summary
Pno 113-construction Of Foot Bridge Over Charivukala Padi Thodu In Ward Ix
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_LSGD_726830_9Tender No
10/AE/LSGD/VGP/Etender/2024-25Tender Authority
Local Self Government Department ViewPurchaser Address
-Website
http://https://lsgkerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
OD124686/2024-2025: DR packing Under foundation- Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of deptl. officers at site.
2.55
-
-
... More
11.4.1.2:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> I. P.C.C grade M 10<br> (ii) Nominal mix 1:3.6 (Hand mixing)
3.12
-
-
... More
12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> I. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
6.98
-
-
... More
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
8.09
-
-
... More
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
1.35
-
-
... More
DRM
-
-
-
... More
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
14.4
-
-
... More
OD124833/2024-2025:DRM with hard stone including packing to lines and levels,cost and conveyance of all materials , labour charges etc complete.
34.4
-
-
... More
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
1
-
-
... More
OD124836/2024-2025: Filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering,lead up to 50 m and lift up to 1.50m as per direction of engineer - in- charge.
9.9
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements