Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,600Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_472097_1Bid Award Id
ViewTender No
18/2021-22/AEE/PHSD/ANGTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
48
-
87.05
... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 80 mm dia nominal bore Data derived from item no.18.12.8 of DAR
Data for 10 m
96
-
208.61
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
7.49
-
7990.86
... More
Interconnecting the pipeline with the existing PVC Pipe of size up to 90 mm by supplying specials all cost of materials and necessary earth work excavation in all class of soil etc complete as per direction of dept officers
3
-
2051.23
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Bend
1
-
79.3
... More
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia End cap
1
-
60.15
... More
Supplying conveying and fitting 80 mm GI End cap
2
-
120
... More
Supplying conveying and fitting 80 mm GI Bend
3
-
752
... More
Towards the charges for three run welding including cost of welding rod, labour charges, conveyance charge, hire charge of machineries etc. complete
8
-
1227.85
... More
Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
1
-
1165.02
... More
Providing tap connection from distribution main using 20 mm ASTM Pipe using stop cock ,union,tap,110 mm PVC Pipe filled concrete 1:2:4 including cost of materials and labour charge etc complete
1
-
4230.94
... More
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 63mm Dia..
48
-
98.85
... More
Supplying 80 mm GI Pipe
96
-
795.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements