Kerala Water Authority Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Water Authority - KWA Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date17 Jun 2022
Closing Date28 Jun 2022
Tender Amount₹ 16,36,274 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

19

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

59

-

88.14

... More
Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.

1

-

3200

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

59

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 4

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.24

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

30

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

60

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.24

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

60

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 5

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.24

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

30

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

60

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.24

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

60

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 6

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1.8

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

38

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

76

-

88.14

... More
Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.

1

-

3200

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1.8

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

76

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 7

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.48

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

50

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

30

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

100

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.48

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

100

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 8

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.24

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

50

-

562.48

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

100

-

88.14

... More
Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.

1

-

3200

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.24

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

100

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 9

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1.5

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

42.5

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

85

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1.5

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

85

-

324.25

... More
Supplying and fitting 90mm pvc end cap

3

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 10

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

2.22

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

36

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

60

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

72

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

2.22

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

72

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 11

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.72

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

48

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

30

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

96

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.72

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

96

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 13

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1.2

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

45

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

19

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

90

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1.2

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

90

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 15

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.48

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

50

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

30

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

100

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.48

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

100

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 15 SC

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

6.84

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

57

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

40

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

114

-

88.14

... More
Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.

1

-

3200

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

6.84

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

114

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 16

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.24

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

30

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

60

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.24

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

60

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 18

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.9

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

47

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

25

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

94

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.9

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

94

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 21

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.42

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

28.5

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

57

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.42

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

57

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 22

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.42

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

28.5

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

57

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.42

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

57

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 24

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.42

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

50

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

54

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

100

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.42

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

100

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 25

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.42

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

28.5

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

57

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.42

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

57

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 27

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.72

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

48

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

35

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

96

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.72

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

96

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Ward 28

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3.24

-

2070.81

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

30

-

562.48

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

20

-

28.24

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

60

-

88.14

... More
Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.

1

-

2465.53

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

3.24

-

8091.05

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.

60

-

324.25

... More
Supplying and fitting 90mm pvc end cap

1

-

116.31

... More
Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials

2

-

185.84

... More
Note:- GST @ 18 % of bill amount will be paid additionally

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.