Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 22,475Document Cost
₹ 1,985Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KWA_696340_1Bid Award Id
ViewTender No
EDVA/AEE/04/2024-25/29313-Rt1Tender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
382.8
-
-
... More
2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
103.5
-
-
... More
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
680
-
-
... More
OD244654/2023-2024:Engaging manmazdoor for bailing out water
28
-
-
... More
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
680
-
-
... More
OD244655/2023-2024:Supplyung ,conveying & laying 90 mm HDPE pipe at canal crossing including trenching river bed , incerting pipe in the casing tube, alligning the pipoe line testing etc...complete .
40
-
-
... More
OD248132/2023-2024:Supplying 150mm dia casing tube (250mmOD) 1;2;4 Mix,45cm long<br <br>.volume=3.14/4(.25^2-.15^2)X.45X1no
35
-
-
... More
OD248123/2023-2024:Supplying conveying and Laying 90 HDPE mm (8kg/cm2) on land portion
140
-
-
... More
OD244657/2023-2024:Shifting existing house connection/Tap connection towards the new line including all earth work excavation and cost of materials. Average distance 3m
18
-
-
... More
OD244658/2023-2024:Taking interconnection from the existing 63-90mm pvc/HDPE line with the newly laid PVC/HDPE line using suitable specials such as Tee, Saddle... including earth work excavation in all kind of soil and cost of special.
24
-
-
... More
OD244659/2023-2024:Taking interconnection from the existing 110 - 160 mm PVC/HDPE line with newly laid90 mm PVC line with suitable specials such as Tee, Saddle etc., including all earth work excavation
2
-
-
... More
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
17.24
-
-
... More
Material Cost
-
-
-
... More
OD244660/2023-2024:Supplying 90mm pvc pipe, 6kg/cm2 including cost of specials
680
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements