Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 20,900Document Cost
₹ 1,871Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KWA_546423_1Bid Award Id
ViewTender No
E-Tender No.158/2022-23/EE/PH/TVLATender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
60
-
559.02
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock
40
-
811.79
... More
Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals
150
-
28.15
... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
50
-
96.75
... More
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes
198
-
129.04
... More
Providing interconnection with newly laid 110 mm PVC lines with existing 160 mm PVC/AC lines using only suitable specials as required including cost of materials,
labour charges but excluding the cost of CIR/CID joints
etc complete (Direct Connection)
2
-
553.43
... More
Jointing 100/110 mm AC/PVC/DI/GI pipes laid to lines and levels in the trenches using CID/CIR. detachable or any available type of joints after cleaning the ends, centering the pipes inserting the joints and tightening including conveying the materials within initial lead and other sundries etc. complete to make a water tight joint capable to withstand the required pressure (including cost of CID/CIR Joint).
4
-
1029.6
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
15
-
8040.94
... More
Reinstate the existing house/Tap connection of 20mm (3/4 inch) with 15mm (1/2 inch) water meter from existing mains, up to a length of 5m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of trench in average cross section 0.3m x 0.75m for laying connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers
24
-
3247.28
... More
Supply of Materials - Replacement of old and damaged existing distribution line from Paippad to Machippally road at Paippad Grama Panchayath-Ward10(Project No.38/2023)
-
-
-
... More
Supply of 110 mm PVC pipe,8Kg/cm2 and including specials as per relevant IS specification for the satisfactory completion of the work
198
-
453.41
... More
Working Charges - Replacement of old and damaged existing distribution line from Paippad to Machippally road at Paippad Grama Panchayath-Ward10(Project No.41/2023))
-
-
-
... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal
concrete 1:3:6 or richer mix (i/c equivalent design mix)
7.28
-
2057.97
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
29.1
-
559.02
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
19.4
-
811.79
... More
Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
90
-
28.15
... More
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
96
-
129.04
... More
Providing interconnection with newly laid 110 mm PVC lines with existing 160 mm PVC/AC lines using only suitable specials as required including cost of materials, labour charges but excluding the cost of CIR/CID joints
etc complete (Direct Connection)
3
-
553.43
... More
Jointing 100/110 mm AC/PVC/DI/GI pipes laid to lines and levels in the trenches using CID/CIR. detachable or any available type of joints after cleaning the ends, centering the pipes inserting the joints and tightening including conveying the materials within initial lead and other sundries etc. complete to make a water tight joint capable to withstand the required pressure (including cost of CID/CIR Joint).
3
-
1029.6
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
8.73
-
8040.94
... More
Reinstate the existing house/Tap connection of 20mm (3/4 inch) with 15mm (1/2 inch) water meter from existing mains, up to a length of 5m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of trench in average cross section 0.3m x 0.75m for laying connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers
16
-
3247.28
... More
Cost of Materials -Replacement of old and damaged existing distribution line from Paippad to Machippally road at Paippad Grama Panchayath-Ward10(Project No.41/2023)
-
-
-
... More
Supply of 110 mm PVC pipe,8Kg/cm2 and including specials for the satisfactory completion of the work
96
-
453.41
... More
Working Charges -Providing pipe line extension in Sasthakavu-Attikadavu road at Vazhappally Panchayath Ward -1(Project No.126/23)
-
-
-
... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal
concrete 1:3:6 or richer mix (i/c equivalent design mix)
7.26
-
2057.97
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
48.4
-
559.02
... More
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
12.1
-
811.79
... More
Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
90
-
28.15
... More
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
120
-
87.59
... More
Providing interconnection with newly laid 90 mm PVC lines with existing 160mm PVC lines using suitable reducer and other specials as required as per direction
(Direct Connection)
1
-
977.7
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
9.08
-
8040.94
... More
Cost of Materials -Providing pipe line extension in Sasthakavu-Attikadavu road at Vazhappally Panchayath Ward -1(Project No.126/23)
-
-
-
... More
Supplying 90 mm PVC pipe 8Kg/cm2 and including specials for the satisfactory completion of the work
114
-
303.88
Evaluation Notes How It Works ?