Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Water Authority - KWA Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date26 May 2022
Closing Date1 Jun 2022
Tender Amount₹ 5,86,813 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 14,700Document Cost
₹ 1,322Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_492078_1Bid Award Id
ViewTender No
Re-E-Tender No.46/2022-23/EE/PH/TVLATender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
168
-
88.14
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line with newly laid 63/75/90 to mm PVC pipe line using necessary Tee for inter connection works including cost of all specials, all labour charges etc complete as per direction of departmental officers.(TEE connection only)
2
-
1536.85
... More
Cost of materials - Pipe line Extension in Kunnukandathil to prayil padi and kallumalapadi in Chettikkad in Ward No 3.
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for satisfactory completion of the work
168
-
101.82
... More
Working Charges - Pipe line Extension in Kayyalakakathu Devi shethram Road in Ward No 4
-
-
-
... More
Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
34
-
30.82
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
70
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
75
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
140
-
88.14
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line withbrnewly laid 63/75/90 to mm PVC pipe line using necessary inter connectionbrworks including cost of all specials, all labour charges etc complete as per direction of departmental officers. (Direct connection only)
1
-
853.81
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
1.7
-
8091.05
... More
Cost of Materials - Pipe line Extension in Kayyalakakathu Devi shethram Road in Ward No 4
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for the satisfactory completion of the work
140
-
101.82
... More
Working Charges - Pipe line Extension Valiyakunnathu pady to Mannathu padi and kaniyampara colony in ward No 5.
-
-
-
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
10
-
28.24
... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 50 mm dia nominal bore
110
-
169.42
... More
Providing interconnection between existing line of dia 63/75/90/110 mm PVC pipe line With newly laid 63/75/90/110 mm PVC and newly laid 50 mm GI pipe line using necessary TEE for interconnection works including earth work excavation, cost of specials, all labour charges etc complete as per the direction of departmental officers. (TEE connection only)
1
-
1536.85
... More
Providing interconnection between existing line of dia 63/75/90/110 mm PVC or GI pipe line With newly laid 63/75/90/110 mm PVC or 50 mm GI line using necessary interconnection works including earth work excavation, cost of specials, all labour charges etc complete as per the direction of departmental officers. (Direct connection only)
1
-
853.81
... More
Cutting MS sheet, pipe and specials by gas cutting including cost of gas,all labour and hire charges of tools etc complete.
100
-
3.16
... More
Grinding the cut edges / welded portions in MS sheet, pipe and specials by grinding machine including all labour and hire charges of tools etc complete.
100
-
2.27
... More
Welding MS sheet, pipe and special by gas or electric plant for three run welding including cost of welding rod / gas, all labour and hire charges of tools etc complete.
100
-
12.08
... More
Cost of Materials - Pipe line Extension Valiyakunnathu pady to Mannathu padi and kaniyampara colony in ward No 5.
-
-
-
... More
Supply of G.I. pipes 50 mm dia (Medium) including all specials required relevant IS specification for satisfactory completion of the work
110
-
519.05
... More
Working Charges - Pipe line Extension in Chuttipparayil to mankotta padi in Ward No 8 (Edathodu)
-
-
-
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soi
87
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
38
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
174
-
88.14
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line withbrnewly laid 63/75/90 to mm PVC pipe line using necessary inter connectionbrworks including cost of all specials, all labour charges etc complete as per direction of departmental officers.(TEE connection only)
1
-
1536.85
... More
Cost of Materials - Pipe line Extension in Chuttipparayil to mankotta padi in Ward No 8 (Edathodu)
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for the satisfactory completion of the work
174
-
101.82
... More
Working Charges - Pipe line Extension in Smashanam road and Mudichirapadavu road in Ward No 9
-
-
-
... More
Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
30
-
30.82
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soi
76
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
25
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
100
-
88.14
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials) 50 mm nominal outer dia pipes.
52
-
48.19
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line with newly laid 63/75/90 to mm PVC pipe line using nessasary Tee for inter connection works including cost of all specials, all labour charges etc complete as per direction of departmental officers.(TEE connection only)
2
-
1536.85
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
1.5
-
8091.05
... More
Cost of Materials - Pipe line Extension in Smashanam road and Mudichirapadavu road in Ward No 9
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for the satisfactory completion of the work
100
-
101.82
... More
Supply of 50 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for the satisfactory completion of the work.
52
-
68.08
... More
Working Charges - Pipe line Extension in Painumootil padi, Thompithara colony and Thazhayil road in Ward No 10
-
-
-
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
84
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
50
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
168
-
88.14
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line withbrnewly laid 63/75/90 to mm PVC pipe line using necessary interconnectionbrworks including cost of all specials, all labour charges etc complete as per direction of departmental officers.(TEE connection only)
2
-
1536.85
... More
Providing interconnection between existing line of dia 63/75/90/110 mm PVC pipe line With newly laid 63/75/90/110 mm PVC line using necessary interconnection works including earth work excavation, cost of specials, all labour charges etc complete as per the direction of departmental officers. (Direct connection only)
1
-
853.81
... More
Cost of Materials - Pipe line Extension in Painumootil padi, Thompithara colony and Thazhayil road in Ward No 10
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for satisfactory completion of the work
168
-
101.82
... More
Working Charges - Pipe line Extension in Kaliyikkal padi to Maliparampu in Ward No 11.
-
-
-
... More
Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
90
-
30.82
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
45
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals.
45
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
63 mm nominal outer dia pipes.
90
-
88.14
... More
Providing inter connection between existing line of dia 63/75/90/110mm PVC pipe line with newly laid 63/75/90 to mm PVC pipe line using necessary Tee for inter connection works including cost of all specials, all labour charges etc complete as per direction of departmental officers.(TEE connection only)
1
-
1536.85
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.5
-
8091.05
... More
Cost of Materials - Pipe line Extension in Kaliyikkal padi to Maliparampu in Ward No 11.
-
-
-
... More
Supply of 63 mm 6 kg/cm2 PVC pipe and specials as per relevant IS specification for satisfactory completion of the work
90
-
101.82
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements