Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,00,000Document Cost
₹ 15,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_465906_1Bid Award Id
ViewTender No
1RE17/SE/PHCK/2021-2022Tender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
2002.56
-
380.46
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil (Ref. Item No. 2.10.1 of DSR)
43512.5
-
558.99
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
50000
-
28.12
... More
"Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and fittings. 90 mm OD HDPE pipe"
60155
-
93.87
... More
Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and fittings.
110 mm OD HDPE pipeNEW DATA
40104
-
127.3
... More
Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and fittings. 140 mm OD HDPE pipe
NEW DATA
4650
-
181.33
... More
Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and fittings.
180 mm OD HDPE pipe
NEW DATA
18784
-
267.22
... More
Conveying and fixing G.I. pipes complete with G.I. fittings etc. but excluding cost of pipes and fittings - External work. r|n 150 mm dia nominal ore r|nObserved Data derived from item no.100.12 .9
193
-
251.36
... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 80 mm dia nominal bore Data derived from item no.18.12.8 of DAR
Data for 10 m
1442
-
209.91
... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 100 mm dia nominal bore Observed Data derived from item no.18.12 of DAR
45
-
236.66
... More
"Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber insertions etc. excluding the cost of valve (the tail pieces if required will be paid separately) :
80 mm diameter. Class I"
Observed Data derived from item no.18.31.of DAR
21
-
591.67
... More
"Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber insertions etc. excluding the cost of valve (the tail pieces if required will be paid separately) :
100 mm diameter. Class I"
Data derived from item no.18.31.1.1of DAR
5
-
892.11
... More
Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber insertions etc. excluding the cost of valve (the tail pieces if required will be paid separately) :
150 mm diameter. Class I"
Data derived from item no.18.31.3.1 of DAR
6
-
1208.24
... More
Conveying and fixing C I Single acting Air Valve of approved quality with bolts,nuts,rubber insertions etc . excluding the cost of air valve(the tail pieces if required will be paid seperately): 25 mm Single acting Air Valve Observed Data derived from item no.18.59.of DAR
76
-
141.35
... More
Providing inter connection between newly laid 90 mm PE/PVC pipe line with existing 200 mm DI lines using 200mm X 80 mm Tee necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
19
-
13573.05
... More
Providing inter connection between newly laid 90 mm PE/PVC pipe line with existing 160 mm PVC lines using 160X160X90 tee necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
57
-
875.91
... More
Providing interconnections inter connection between newly laid 110 mm PVC/PE pipes line with newly laid 90 mm PE/PVC. pipes using necessary specials including cost of all materials, all labour charges etc.complete as per the direction of officer in charge.
23
-
817.83
... More
Providing interconnection between newly laid line of 110 mm PE/PVC pipe line with newly laid PE/PVC line up to 180 mm, using necessary specials including cost of necessary specials, excavation charges, all labour charges etc complete as per the direction of engineer in charge.
8
-
1096.59
... More
Providing interconnection between newly laid line of 90 mmPE/ PVC pipe line with newly laid 90 mm PVC/PE branch line using necessary specials including cost of necessary specials, excavation charges, all labour charges etc complete as per the direction of engineer in charge.
110
-
221.24
... More
Providing interconnection between newly laid line of 110 mm PE/PVC pipe line with newly laid 100 mm GI pipe using necessary specials including cost of saddle piece and other specials, excavation charges, all labour charges etc complete as per the direction of engineer in charge.
3
-
979.28
... More
Interconnecting newly laid 90mm PE/PVC pipe with existing 400mm AC pipe using 400 MS saddle clamp and connected specials including cost and conveyance of materials, fabrication charges and all labour charges ,etc,complete as per the direction of Engineer in charge.br
3
-
3091.24
... More
Providing interconnection between newly laid line of 90 mm PE/ PVC line with newly laid 80 mm GI pipe line using necessery specials including cost of all specials all labour charges etc..complete as per direction of dept. Officers
16
-
908.43
... More
Providing interconnection between newly laid line of 180mm PE/PVC pipe line with 150mm GI line using GI coupling and PE/PVC adaptors,PE/PVC T/P & CIR joints and other specials for interconnection
2
-
2653.18
... More
Providing inter connection between 80 mm GI pipe line with 300 mm DI lines using 300mmX80mm DI TEE and MJ with necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
2
-
31432.72
... More
Providing inter connection between 180 mm PE/PVC pipe line with 300 mm DI lines using 300X150 DI Tee necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
3
-
34114.76
... More
Providing inter connection between 90 mm PE/PVC pipe line with 300 mm DI lines using 300mmX80mm DI Tee necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
7
-
29304.94
... More
Providing inter connection between 140 mm PE/PVC pipe line with 200 mm DI lines using 200mmX150mm(or 125mm) DI Tee necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
10
-
18975.07
... More
Providing inter connection between 110 mm PE/PVC pipe line with 200 mm DI lines using 200mmX100mm DI Tee with MJ necessary specials including cost of all specials, all labour charges etc complete as per direction of departmental officers.
2
-
18872.05
... More
Alteration/ Making re connection with the existing waterbrconnection /SF connection-Alteration using 20mm IndianbrStandard Class 6 uPVC pipe and uPVC /brBrass specials viz. brass ferrule, Elbow,brMTA(Brass Threaded,), FTA(BrassbrThreaded,), couplers etc. and connecting withbrthe mains, testing the joints etc. completebrincluding trenching and refilling in all kinds ofbrsoil up to a depth of 1.50m for main linebrtracing and trench of average cross sectionbr0.3m x 0.75m for laying connection pipe andbrservice pipe, safely removing & re-fixingbrexisting water meter, lighting, watching,brproviding caution boards, traffic control etc.brcomplete including cost of materials, hire forbrtools, cost of consumables and labourbrcharges as per the directions of thebrdepartment officers.br
200
-
2552.55
... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
135.31
-
298.8
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
10.41
-
6857.61
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
70.29
-
8642.31
... More
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
203.06
-
337.42
... More
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
241.2
-
721.7
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5623.04
-
98.92
... More
12 mm cement plaster finished with a floating coat of neat cement of mix:
354.2
-
388.79
... More
Supplying and fixing C.I with cover and frame for manholes:br560 mm diameter ( heavy duty) the weight to be not less than 208 kg
32
-
14561.61
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4541.53
-
7256.36
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
2270.77
-
8040.95
... More
Appendix B - Cost of Metterial
-
-
-
... More
Supply of PE Pipe, PE100, PN8, 110mm dia, conforming to IS 4984/2016
40104
-
321.75
... More
Supply of PE Pipe, PE100, PN8, 90mm dia, conforming to IS 4984/2016.
60155
-
213.7
... More
Supply of PE Pipe, PE100, PN8, 140mm dia, conforming to IS 4984/2016
4650
-
520.35
... More
Supply of PE Pipe, PE100, PN8, 180mm dia, conforming to IS 4984/2016.
18784
-
856.05
... More
Cost of HDPE specials (Bends,Tee,coupler, Tailpiece,end caps etc ) 2% cost of pipe.
44258256.2
-
0.02
... More
cost of GI-Specials.5% cost of pipe.specials such as Bends ,Tee,coupling ,End caps etc.
1570855.4
-
0.05
... More
Supply of 100 mm GI medium pipe-Base rate as per the DsoR 2018 E&M Code No.2834
45
-
1194.9
... More
Supplying 80 mm GI pipe( medium) of good quality
1442
-
800.3
... More
Supply of 150 mm GI medium pipe-Base rate as per the DsoR 2018 E&M Code No.2835
193
-
1881.1
... More
Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
76
-
966.75
... More
Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
21
-
3131.05
... More
Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 100mm.
5
-
4186.85
... More
Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 150mm.
6
-
6770.65
... More
Appendix:C- House Connections
-
-
-
... More
Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
5481
-
5867.31
... More
Providing additional length of house connection pipe using 20mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers.
54810
-
175.19
... More
Providing 20mm (1/2 inch) PVC Air Valve in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire for tools and labour charges etc. complete and as per the directions of the department officers.
1800
-
376.32
... More
Cost for Geotagging
5481
-
20
... More
Providing 15mm PVC Tap in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
5481
-
574.04