Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
Jjm-wss To Thekady 30 Acre In Parambikulam
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KWA_616083_1Bid Award Id
ViewTender No
23/2023-24/EE/PD/CTRTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
18.17.3:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :40 mm nominal bore
4
-
-
... More
OD190986/2023-2024:Supplying specials for 63mm 10kg HDPE pipe
320
-
-
... More
100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia.
1500
-
-
... More
OD190987/2023-2024:Supply of PVC specials 5% of cost of pipe
235845
-
-
... More
18.17.5:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore
10
-
-
... More
18.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
300
-
-
... More
CLEANING COLLECTING POND, SUPPLYING AND LAYING GRAVITY MAIN, PROVIDING HDPE TANK, DISTRIBUTION SYSTEM AND FHTCs - WORKING CHARGES
-
-
-
... More
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
364
-
-
... More
OD190971/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for earth work in all kinds of soil for trenches
291.2
-
-
... More
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
182
-
-
... More
OD190972/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for earth work in ordinary rock for trenches
182
-
-
... More
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
182
-
-
... More
OD190973/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for earth work in medium rock for trenches
145.6
-
-
... More
OD190974/2023-2024:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 63mm and 50mm Nominal Outer Diameter pipes.
320
-
-
... More
100.9.5:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes.
1500
-
-
... More
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
323.4
-
-
... More
OD190976/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for providing Tank frame
323.4
-
-
... More
18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
10000
-
-
... More
OD190977/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for HDPE tank
10000
-
-
... More
OD190978/2023-2024:Towards the charges for fixing 5000litre capacity HDPE tank over platform providing inlet and outlet connections including all labour charges and cost of specials for inlet and outlet connections.
2
-
-
... More
100.60.1.1.2:Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100
-
-
... More
OD190979/2023-2024:Hill track allowance and allowance for working through difficult areas (15% of rate) for house connection
100
-
-
... More
100.60.3.1.1:Providing additional length of house connection pipe using 20mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers
310
-
-
... More
100.60.23.3.1:Providing 15mm PVC Tap in the water meter assembly for 15mm ( 1/2 inch ) water connection, using 20mm ( 1/2 inch ) Indian Standard uPVC Class 6 pipes, uPVC specials and PP PN 16 Compression specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100
-
-
... More
OD190983/2023-2024:Providing Vertical Stand post using 75 mm 6kg pvc pipe for FHTCs including cutting,filling available earth/sand & fixing in position etc including necessary earthwork excavation for fixing stand post etc complete as per the direction of dept. officers
100
-
-
... More
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
3.7
-
-
... More
OD191678/2023-2024:Supply and fixing of welded wire mesh fencing including door and all necessary fittings.
444
-
-
... More
Construction of MS bridge
-
-
-
... More
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
2.7
-
-
... More
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
7.2
-
-
... More
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
6.28
-
-
... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
3998.77
-
-
... More
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
28.8
-
-
... More
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
19.32
-
-
... More
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
60.29
-
-
... More
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
129.01
-
-
... More
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
720
-
-
... More
10.20:Providing and fixing bolts including nuts and washers complete.
28127.76
-
-