Kerala Water Authority Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Water Authority - KWA Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date28 Feb 2022
Closing Date7 Mar 2022
Tender Amount₹ 9,58,678 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: 1.50m to 3.0mAll kinds of soil

2

-

690.88

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

30

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

3.2

-

159.65

... More
Engaging Coolie

2

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

90

-

90.86

... More
Taking interconnection from the newly laid 110mm -160mm pvc /HDPE line with the existing PVC line using suitable specials such as Tee,saddle etc..supplied by the contractor including all earth work excavation

1

-

2296.25

... More
Supply ,stacking,spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading ,unloading & stacking up to any lead.

0.8

-

558.88

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.4

-

8340.93

... More
Supply of materials -Laying Pipe line from Thakazhy Krishibhavan to west in Ward 13

-

-

-

... More
supplying fixing 90 mm pvc (6kg/cm2)including the cost of pipe and specials

90

-

208.37

... More
Working charge - Extension of Pipe line from Koolie purakkal paalam south to Jacob Grogory Chethikkalam in W 8

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

68

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

30

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

20

-

159.65

... More
Engaging Coolie

2

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

135

-

90.86

... More
Taking inter connection from the newly laid 63mm -90mm pvc/hdpe line with the existing line using suitable specials such as Tee ,saddle etc..supplied by the contractor including all necessary earth work excavation.

1

-

1760.35

... More
Supply of materials - Extension of Pipe line from Koolie purakkal paalam south to Jacob Grogory Chethikkalam in W 8

-

-

-

... More
supplying conveying and fixing 90 mm pvc (6kg/cm2)including the cost of pipe and specials

135

-

208.37

... More
Working charge - Laying pipe line at Chettiyamparambu Thirumeni' s house to Kurishadi in Arattuchira road in W 6

-

-

-

... More
Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

30

-

376.75

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

30.75

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

10

-

99.36

... More
Engaging Coolie

1

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

60

-

90.86

... More
Taking inter connection from the newly laid 90mm pvc/hdpe line with the existing line using suitable specials such as Tee ,saddle etc..supplied by the contractor including all necessary earth work excavation.

2

-

1760.35

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

4.5

-

8340.93

... More
Supply of materials - Laying pipe line at Chettiyamparambu Thirumeni' s house to Kurishadi in Arattuchira road in W 6

-

-

-

... More
supplying 90 mmPVC (6kg/cm2) on land portion INCLUDING SPECIALS

60

-

204.36

... More
Working charge - Extension of Pipe line from St. Reethas church to Pazhayamadom Achankunju"s House in WARD -5

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

101.1

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

80

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

4

-

159.65

... More
Engaging Coolie

4

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

200

-

90.86

... More
Taking interconnection from the newly laid 90mm pvc /HDPE line with the existing PVC line using suitable specials such as Tee,saddle etc..supplied by the contractor including all earth work excavation

1

-

2296.25

... More
Supply of materials - Extension of Pipe line from St. Reethas church to Pazhayamadom Achankunju"s House in WARD -5

-

-

-

... More
SUPPLY OF 90MMPVC PIPE6kg/cm2 including specials

200

-

208.37

... More
Working charge - Extension of Pipe line from Vaikkom temple to Koottumma in WARD 3

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

65.55

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

45

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

0.75

-

159.65

... More
Engaging Coolie

3

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

130

-

90.86

... More
Taking inter connection from the newly laid 90mm pvc line with the existing line using suitable specials such as Tee ,saddle etc..supplied by the contractor including all necessary earth work excavation.

2

-

1760.35

... More
Supply of materials - Extension of Pipe line from Vaikkom temple to Koottumma in WARD 3

-

-

-

... More
Supply of PVCpipe 90 mmPVC6kg/cm2 including specials

130

-

208.37

... More
Working charge - PIPE LINE EXTENSION From Gokulam to North in WARD -2

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

63.83

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

50

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

4.5

-

159.65

... More
Engaging Coolie

2

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

135

-

90.86

... More
Taking interconnection from the newly laid 90mm pvc line with the existing PVC line using suitable specials such as Tee,saddle etc..supplied by the contractor including all earth work excavation

2

-

2296.25

... More
Supply of materials - PIPE LINE EXTENSION From Gokulam to North in WARD -2

-

-

-

... More
supply of pipe 90 mm 6kg/cm2 including specials

135

-

208.37

... More
Working charge - PIPE LINE EXTENSION Kelamangalam Pathil ward ( from Anilkumar - Pathil) in WARD 7

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

74.6

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

130

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

15

-

159.65

... More
Bailing out water with 5 HP engine and pumpset including conveyance to the site, errection, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc. complete.

29.84

-

38.57

... More
Supplying conveying and laying 90mmHDPE line at canal crossing portion including trenching the river bed, labour for fixing casing tubes and all labour charges etc complete

60

-

359.76

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

140

-

90.86

... More
Supplying 150mm dia casing tube,0.40m lonng,250mm OD (1:2:4 mix)

20

-

240.66

... More
Taking interconnection from the newly laid 90mm pvc /HDPE line with the existing PVC line using suitable specials such as Tee,saddle etc..supplied by the contractor including all earth work excavation

2

-

2296.25

... More
Supply of materials - PIPE LINE EXTENSION Kelamangalam Pathil ward ( from Anilkumar - Pathil) in WARD 7

-

-

-

... More
supply of 90 mm PVC pipe 6kg/cm2 including specials

140

-

208.37

... More
Working charge - Laying Pipeline from Sasidharan, Sasivilasom to Thunduparambu - Kamalam Ponnittichira RWSS TO THAKAZHY - WARD- 4

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

70.5

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

35

-

99.36

... More
Engaging Coolie

2

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

140

-

90.86

... More
Taking inter connection from the newly laid 63mm -90mm pvc/hdpe line with the existing line using suitable specials such as Tee ,saddle etc..supplied by the contractor including all necessary earth work excavation.

1

-

1760.35

... More
Supply of materials - Laying Pipeline from Sasidharan, Sasivilasom to Thunduparambu - Kamalam Ponnittichira RWSS TO THAKAZHY - WARD- 4

-

-

-

... More
supply of 90 mm PVC 6kg/cm2 including specials

140

-

208.37

... More
Working charge - Laying Pipe Line at Chekkidikadu temple to St.Joseph Chappel in ward 9

-

-

-

... More
Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

2

-

376.75

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

60.8

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

40

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

40

-

159.65

... More
Engaging Coolie

3

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

120

-

90.86

... More
Taking inter connection from the newly laid -90mm pvc line with the existing line using suitable specials such as Tee ,saddle etc..supplied by the contractor including all necessary earth work excavation.

1

-

1760.35

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.3

-

8340.93

... More
Supply of materials - Laying Pipe Line at Chekkidikadu temple to St.Joseph Chappel in ward 9

-

-

-

... More
Supply of 90 mmPVC PIPE 6kg/cm2 including specials

120

-

208.37

... More
Working charge - Extension of pipe line from Mukkada paalam Vadakkekara to west in WARD 10

-

-

-

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of so

56

-

579.85

... More
Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

50

-

99.36

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m

12.8

-

159.65

... More
Engaging Coolie

3

-

917.26

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

140

-

90.86

... More
Taking interconnection from the newly laid 90mm pvc line with the existing PVC line using suitable specials such as Tee,saddle etc..supplied by the contractor including all earth work excavation

1

-

2296.25

... More
Supply of materials - Extension of pipe line from Mukkada paalam Vadakkekara to west in WARD 10

-

-

-

... More
supply of 90 MM PVC 6kg/cm2 including specials

140

-

208.37



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.