Kerala Water Authority Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Water Authority - KWA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date23 Dec 2024
Closing Soon31 Dec 2024
Tender Amount₹ 33,60,302 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
100.43.4:Conveying, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc., complete (excluding cost of pipes): 250mm diameter pipe.

10

-

-

... More
100.43.5:Conveying, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc., complete (excluding cost of pipes): 300mm diameter pipe.

10

-

-

... More
OD121062/2024-2025:Supply of glazed Stoneware Pipe (SPI) 150mm nominal dia,0.6m long conforming to IS

32

-

-

... More
100.98.98:Supply of SW Pipe 200mm, 0.6m long.

32

-

-

... More
100.98.99:Supply of SW Pipe 250mm, 0.6m long.

18

-

-

... More
100.98.100:Supply of SW Pipe 300mm, 0.6m long.

18

-

-

... More
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)

1

-

-

... More
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

3

-

-

... More
CONSTRUCTION OF MANHOLES

-

-

-

... More
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.

20

-

-

... More
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)

4

-

-

... More
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.

20

-

-

... More
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar

10.4

-

-

... More
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

193.04

-

-

... More
OD121056/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 2nd depth of 1.50m to 3.0m in all kinds of soil.

159.48

-

-

... More
OD121055/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means overareas (exceeding 30cm in depth, 150cm in width as well as 10 sqm on plan) including disposal of excavated eartrh, disposed earth to be levelled and neatly dressed for man hole<br>3rd depth 3.00m to 4.50m

24.35

-

-

... More
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.

204.4

-

-

... More
2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m

420

-

-

... More
2.17.2:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m

240

-

-

... More
2.17.3:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.5 m

40

-

-

... More
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

15.05

-

-

... More
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

17.01

-

-

... More
OD121059/2024-2025:Centering and Shuttering including strutting, propping etc and removal of form work etc for cover slab(Circular)

42.53

-

-

... More
OD121060/2024-2025:Centering and Shuttering including strutting, propping etc and removal of form work etc Well Steining (including 20% extra for circular works)

580.32

-

-

... More
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

20.12

-

-

... More
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)

44.16

-

-

... More
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars

5123.16

-

-

... More
19.21.1:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 100 to 250 mm diameter

40

-

-

... More
19.21.2:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 250 to 300 mm diameter

20

-

-

... More
19.21.3:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 350 to 450 mm diameter

2

-

-

... More
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

9.56

-

-

... More
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster

33.91

-

-

... More
19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design

90

-

-

... More
OD121061/2024-2025:Conveying from casting yard and fixing the RCC cover slab of size 1.60 M dia,18 cm thick including 5 kg cement/each

35

-

-

... More
15.48:Taking out C.I cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials with 50 metres lead as per direction of Engineer -in- Charge.

35

-

-

... More
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

217.07

-

-

... More
MAINTENANCE WORKS

-

-

-

... More
OD121050/2024-2025:Plugging the full portion of the mouth of 100mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete

90

-

-

... More
OD121051/2024-2025::Plugging the full portion of the mouth of 150mm to 200mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete

20

-

-

... More
OD121052/2024-2025:Plugging the full portion of the mouth of 225 to 300mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.

10

-

-

... More
OD121053/2024-2025:Plugging the full portion of the mouth of 350 to 375mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.

5

-

-

... More
OD121054/2024-2025:Manhole cleaning upto 3m depth- <br>Cleaning the manhole at main line and branches up to a depth of 3m including removing the silt and other floated matters and destroying the debries at convenient places as directed by deptl officers

30

-

-

... More
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.

240

-

-

... More
100.98.1008:Engaging Coolie.

90

-

-

... More
100.98.1035:Engaging sewer man.

75

-

-

... More
GENERAL ITEMS

-

-

-

... More
OD121043/2024-2025:Supplying, conveying and laying 25mm dia PVC best quality pipe (10kg/cm2) including specials for diverting near manholes

25

-

-

... More
100.98.214:Supply of PVC Pipe, 6kg/cm2, 110mm Dia.

100

-

-

... More
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.

100

-

-

... More
OD121044/2024-2025:Providing protection works to the Electric post by using 3 no. of Kattadi poles and removing the same after completion of work

40

-

-

... More
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

11.15

-

-

... More
OD121045/2024-2025:Removing the CI or RCC manhole cover with frame, chipping the existing bitumen surface, cement concrete and re-fixing the cover after raising the manhole cover by 25cm to 35cm with CC 1:2:4 as per specification

25

-

-

... More
OD121046/2024-2025:Removing the CI or RCC manhole cover with frame (Heavy duty), after chipping the existing cement concrete and re fixing the Cover after raising the manhole by 15cm to 24cm with CC 1:2:4 as per specification

20

-

-

... More
OD121047/2024-2025:Removing the CI or RCC manhole cover with frame (Heavy duty), after chipping the existing cement concrete and refixing the Cover after raising the manhole by 10cm with CC 1:2:4 as per specification

25

-

-

... More
OD121048/2024-2025:Removal of Dumped earth, silt, deposits received from manhole, well etc, conveying by lorry for minimum mechanical conveyance and disposing safely

5

-

-

... More
OD121049/2024-2025:Supplying, conveying and fixing in position 560mm dia CI MH cover with frame (HD20), weight shall not be less than 208kg

35

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.