Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 14,700Document Cost
₹ 1,416Tender Fee
Refer Documents
Summary
Deposit Work - Rwss To Karukutty - Extension Of Pipe Line In
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_466763_1Bid Award Id
ViewTender No
13/2021-22/AEE/PHSD/ANGTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil (Ref. Item No. 2.10.1 of DSR)
255
-
555.51
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :"
Ordinary Rock. (Ref. Item No. 2.13.1 of DSR)
27
-
806.76
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
270
-
28.01
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
564
-
87.05
... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 80 mm dia nominal bore Data derived from item no.18.12.8 of DAR
Data for 10 m
18
-
208.61
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
10.56
-
7990.86
... More
Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
35.5
-
381.62
... More
Interconnecting the newly laid pipe line with the existing PVC pipe of size up to 90mm including cost of supply of all specials ,earth work excavation in all classes of soil labour charges etc. complete as per the direction of departmental officers.
9
-
1667.99
... More
Supplying and conveying 90 mm PVC Bend
14
-
283.41
... More
Supplying and conveying 80 mm GI Bend medium ISI marked.
6
-
725.94
... More
Supplying and conveying 90 mm PVC TC
6
-
164.93
... More
Supplying and conveying 90 mm PVC(10 kg) End cap
9
-
91
... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 90mm Dia.
564
-
324.25
... More
Supplying 80 mm GI Pipe medium ISI marked.
18
-
795.32